Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: July 14, 2008"
(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Der Ping Chou *John Graham *Larry Dunnell *Linda Chan *Sheila ...) |
(→Minutes) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
==Attendees== | ==Attendees== | ||
*Brian Fitzpatrick | *Brian Fitzpatrick | ||
− | |||
− | |||
*Larry Dunnell | *Larry Dunnell | ||
− | |||
− | |||
− | |||
*Hung Hsi | *Hung Hsi | ||
*Brian Payton | *Brian Payton | ||
+ | *Linda Chan | ||
+ | *John Graham | ||
+ | *Sheila Sholars | ||
==Regrets== | ==Regrets== | ||
+ | *Emily Kapner | ||
+ | *Der Ping Chou | ||
==Agenda== | ==Agenda== | ||
− | * | + | * Proposed dates for 1st maintenance release (SR1) train |
− | * We are at | + | **RC1 - September 2, 2008, with EPP on Sept 8, Server freeze on Sept 9, and public access on Sept 10 |
− | + | **RC2 - September 9, 2008, with EPP on Sept 15, Server freeze on Sept 16, and public access on Sept 17 | |
+ | **Ganymede SR1 - September 15, 2008, with EPP on Sept 22, Server freeze on Sept 23, and public access on Sept 24 | ||
+ | *This roughly corresponds to our rampdown suggestion of doing a milestone build (1.6.1 M2) for August 29 the week before SR1 RC1 (probably based on the August 28 integration build). | ||
+ | *IBM (LJ) has requested that we adjust our build schedule slightly (from 7/25) to meet an August 7 deadline. We've suggested that we compromise and move our M1 build to August 1 and do a few days of testing after that. | ||
+ | *To summarize ('cause I think I just threw enough dates in there it looks like they were in a blender on puree)... | ||
+ | **1) We shift the DTP 1.6.1 M1 date to August 1, 2008, which is effectively the 7/31 SH build. | ||
+ | **2) We lock down changes to the 1.6/1.6.1 stream from Aug 1 to Aug 7, except for any critical fixes deemed required for the milestone. | ||
+ | **3) On Aug 7, we release 1.6.1 M1 publicly and re-open the 1.6/1.6.1 stream for continued development. | ||
+ | **4) With the proposed rampdown for the maintenance release train, we shift the DTP 1.6.1 M2 date to August 29 (effectively the August 28th SH build for us). | ||
+ | **5) From that point forward, we roll with the standard rampdown policy for RC1 (effectively our M2) and RC2 of the SR1 release train. | ||
+ | *The goal here is not to force an early release of 1.6.1 if we can help it and just adjust dates for the M1 & M2 milestone builds a bit. | ||
+ | * We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]] | ||
* Sub-project status (from team leads) | * Sub-project status (from team leads) | ||
* Open discussion | * Open discussion | ||
==Minutes== | ==Minutes== | ||
+ | * Will discuss 1.6.1 milestone/early release at PMC meeting tomorrow. | ||
==Action Items== | ==Action Items== | ||
[[Category:Data Tools Platform]] | [[Category:Data Tools Platform]] |
Latest revision as of 14:21, 14 July 2008
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- Brian Fitzpatrick
- Larry Dunnell
- Hung Hsi
- Brian Payton
- Linda Chan
- John Graham
- Sheila Sholars
Regrets
- Emily Kapner
- Der Ping Chou
Agenda
- Proposed dates for 1st maintenance release (SR1) train
- RC1 - September 2, 2008, with EPP on Sept 8, Server freeze on Sept 9, and public access on Sept 10
- RC2 - September 9, 2008, with EPP on Sept 15, Server freeze on Sept 16, and public access on Sept 17
- Ganymede SR1 - September 15, 2008, with EPP on Sept 22, Server freeze on Sept 23, and public access on Sept 24
- This roughly corresponds to our rampdown suggestion of doing a milestone build (1.6.1 M2) for August 29 the week before SR1 RC1 (probably based on the August 28 integration build).
- IBM (LJ) has requested that we adjust our build schedule slightly (from 7/25) to meet an August 7 deadline. We've suggested that we compromise and move our M1 build to August 1 and do a few days of testing after that.
- To summarize ('cause I think I just threw enough dates in there it looks like they were in a blender on puree)...
- 1) We shift the DTP 1.6.1 M1 date to August 1, 2008, which is effectively the 7/31 SH build.
- 2) We lock down changes to the 1.6/1.6.1 stream from Aug 1 to Aug 7, except for any critical fixes deemed required for the milestone.
- 3) On Aug 7, we release 1.6.1 M1 publicly and re-open the 1.6/1.6.1 stream for continued development.
- 4) With the proposed rampdown for the maintenance release train, we shift the DTP 1.6.1 M2 date to August 29 (effectively the August 28th SH build for us).
- 5) From that point forward, we roll with the standard rampdown policy for RC1 (effectively our M2) and RC2 of the SR1 release train.
- The goal here is not to force an early release of 1.6.1 if we can help it and just adjust dates for the M1 & M2 milestone builds a bit.
- We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
- Sub-project status (from team leads)
- Open discussion
Minutes
- Will discuss 1.6.1 milestone/early release at PMC meeting tomorrow.