Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "COSMOS Design 205826"
m (→''' Design document author''') |
m (→''' Workload Estimation''') |
||
Line 40: | Line 40: | ||
|- | |- | ||
! align="right" | TOTAL | ! align="right" | TOTAL | ||
− | | | + | | 0.2 |
| | | | ||
|} | |} |
Revision as of 11:20, 9 January 2008
Bugzilla
- 205826 Update DataCenter model based on latest SML changes
Design document author
- Valentina Popescu
- Email : popescu@ca.ibm.com
- Last Updated --Popescu.ca.ibm.com 17:18, 8 January 2008 (EST)
Workload Estimation
Process | Sizing | Names of people doing the work |
---|---|---|
Design | NA | |
Code | 0.2 | |
Test | NA | |
Documentation | NA | |
Build and infrastructure | NA | |
Code review, etc.* | ||
TOTAL | 0.2 |
'* - includes other committer work (e.g. check-in, contribution tracking)
Note: Code sizing doesn’t include time required to understand the existing code in order to make required changes. It is assumed that somebody familiar with this code will do the changes.