Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Aperi Development Status Meeting 04/23/07"

Line 66: Line 66:
 
[http://www.eclipse.org/projects/dev_process/parallel-ip-process.php new guidelines].  Logo is addressed.  Need to put the word ‘incubation’ in our download material.
 
[http://www.eclipse.org/projects/dev_process/parallel-ip-process.php new guidelines].  Logo is addressed.  Need to put the word ‘incubation’ in our download material.
 
|}
 
|}
 +
* Open Forum
 
* Other:
 
* Other:
 
** Next Meeting will be on Monday, April 30th
 
** Next Meeting will be on Monday, April 30th
* Open Forum
+
** Third Party code for R0.3 [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log]

Revision as of 11:25, 23 April 2007

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Dial in numbers:

Toll Free: 877-421-0040 International: 770-615-1256 Passcode: 800415

Agenda:

  • Project Leader Notes
  • Release Engineer Notes (Todd)
  • Aperi Downloads
  • Project Schedule:
    • Latest Schedule Updates made in the file.
    • BIRT Reporting
  • IDVT
    • Test Status
    • Not able to perform BIRT report testing due to the Aperi build broken by the integration of the BIRT report server.
    • Verified the db performance issues for both DB2 and Derby.
    • Testcase status: 169 successful out of 171 non-BIRT testcases.
    • Key defects (both Sev 2):
      • 176657 - Filesystem probe causes si_signo=11 on SUSE 10
      • 183478 - installing Aperi on Linux platform using DB2 failed
  • ID
    • Release Notes for 0.3 These release notes provide information about:
      • New features available in Aperi v0.3
      • Known problems and limitations
      • Additional documentation for new features
    • Comments, suggestions, and edits are welcome. You can respond through aperi-dev@eclipse.org or by filing a bug report.
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Tom ongoing Questionnaires submitted 9/6. - Utilizing the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire. See IP Log for new updates on this.
Obtain two mentors Tom 4/30/07 Per new development process rules, we need to obtain two project mentors from the Eclipse Architecture Council. The AC is listed here:

http://www.eclipse.org/org/foundation/council.php but Tom has asked Bjorn for larger candidate list. Bjorn is building a list. Tom is building a list of potential mentor names and will provide to the team.

Investigate technology to run the webcast and demo Tom 4/9/07 Currently investigating three companies:

WebEx http://www.webex.com/ ON24 http://www.on24.com/ Readytalk http://www.readytalk.com/ Getting quotes for a Single 1 hour presentation (PP slides and demo) Q & A session (moderated) 1-3 speakers 25 - 50 attendees playback available afterward Tom has contacted all three companies. The results of the investigation are located here on the wiki: Webcast Options. Need assistance with demo.

Conform to new incubation guidelines <NEW> Tom 4/30/07 The new

new guidelines. Logo is addressed. Need to put the word ‘incubation’ in our download material.

  • Open Forum
  • Other:
    • Next Meeting will be on Monday, April 30th
    • Third Party code for R0.3 IP Log

Back to the top