Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Aperi Development Status Meeting 04/23/07"
Line 66: | Line 66: | ||
[http://www.eclipse.org/projects/dev_process/parallel-ip-process.php new guidelines]. Logo is addressed. Need to put the word ‘incubation’ in our download material. | [http://www.eclipse.org/projects/dev_process/parallel-ip-process.php new guidelines]. Logo is addressed. Need to put the word ‘incubation’ in our download material. | ||
|} | |} | ||
+ | * Open Forum | ||
* Other: | * Other: | ||
** Next Meeting will be on Monday, April 30th | ** Next Meeting will be on Monday, April 30th | ||
− | * | + | ** Third Party code for R0.3 [http://www.eclipse.org/aperi/project-info/IP-Log.html IP Log] |
Revision as of 11:25, 23 April 2007
Aperi Wiki Home Aperi Meetings Aperi Development Meetings
Dial in numbers:
Toll Free: 877-421-0040 International: 770-615-1256 Passcode: 800415
Agenda:
- Project Leader Notes
- Release Engineer Notes (Todd)
- Aperi Downloads
- Project Schedule:
- Latest Schedule Updates made in the file.
- BIRT Reporting
- IDVT
- Test Status
- Not able to perform BIRT report testing due to the Aperi build broken by the integration of the BIRT report server.
- Verified the db performance issues for both DB2 and Derby.
- Testcase status: 169 successful out of 171 non-BIRT testcases.
- Key defects (both Sev 2):
- 176657 - Filesystem probe causes si_signo=11 on SUSE 10
- 183478 - installing Aperi on Linux platform using DB2 failed
- ID
- Release Notes for 0.3 These release notes provide information about:
- New features available in Aperi v0.3
- Known problems and limitations
- Additional documentation for new features
- Comments, suggestions, and edits are welcome. You can respond through aperi-dev@eclipse.org or by filing a bug report.
- Release Notes for 0.3 These release notes provide information about:
- Action Items
Item | Owner | Target | Status |
---|---|---|---|
Third Party Dependency Questionnaire | Tom | ongoing | Questionnaires submitted 9/6. - Utilizing the IP Log to track the individual IPZilla entries for each Third Party Contribution Questionnaire. See IP Log for new updates on this. |
Obtain two mentors | Tom | 4/30/07 | Per new development process rules, we need to obtain two project mentors from the Eclipse Architecture Council. The AC is listed here:
http://www.eclipse.org/org/foundation/council.php but Tom has asked Bjorn for larger candidate list. Bjorn is building a list. Tom is building a list of potential mentor names and will provide to the team. |
Investigate technology to run the webcast and demo | Tom | 4/9/07 | Currently investigating three companies:
WebEx http://www.webex.com/ ON24 http://www.on24.com/ Readytalk http://www.readytalk.com/ Getting quotes for a Single 1 hour presentation (PP slides and demo) Q & A session (moderated) 1-3 speakers 25 - 50 attendees playback available afterward Tom has contacted all three companies. The results of the investigation are located here on the wiki: Webcast Options. Need assistance with demo. |
Conform to new incubation guidelines <NEW> | Tom | 4/30/07 | The new
new guidelines. Logo is addressed. Need to put the word ‘incubation’ in our download material. |
- Open Forum
- Other:
- Next Meeting will be on Monday, April 30th
- Third Party code for R0.3 IP Log