Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "PTP/meetings/May 2010"
(→Minutes) |
(→Minutes) |
||
Line 51: | Line 51: | ||
#** Release planning documentation: [http://wiki.eclipse.org/Helios/Simultaneous_Release_Plan Simultaneous Release Plan ] and [http://www.eclipse.org/helios/planning/EclipseSimultaneousRelease.php Eclipse Simultaneous Release Info] and [http://wiki.eclipse.org/Helios/Simultaneous_Release_Tracker_FAQ Simultaneous Release Tracker FAQ] | #** Release planning documentation: [http://wiki.eclipse.org/Helios/Simultaneous_Release_Plan Simultaneous Release Plan ] and [http://www.eclipse.org/helios/planning/EclipseSimultaneousRelease.php Eclipse Simultaneous Release Info] and [http://wiki.eclipse.org/Helios/Simultaneous_Release_Tracker_FAQ Simultaneous Release Tracker FAQ] | ||
#** Bug to track our work on this: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=308569 Bug 308569] | #** Bug to track our work on this: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=308569 Bug 308569] | ||
+ | #** M7 has new RDT features, Greg requests that Jay please test. | ||
+ | #** Still TODO for Helios: more message bundles, then submit to Babel; JUnit test plans, capabilities (or document). Greg looking at several of these. Beth working on PLDT message bundles and JUnit tests. | ||
+ | #** Builds: Each Friday, but following Tuesday is last chance to get code in before the build that goes into the Helios Repository before each milestone/release candidate build. | ||
+ | #** Next milestone is RC1 (Release Candidate 1) - platform build this Friday, our build the following Tuesday. Final RC1 is May 21. | ||
#* RDT and remote status | #* RDT and remote status | ||
#* Resource Managers | #* Resource Managers |
Revision as of 13:37, 11 May 2010
Contents
May 2010 Meeting
Date: May 11, 2010 Time: 1:00 PM EST
Call in information:
Toll Free (US): 1 877-421-0033
Toll Free (Germany): 0800-181-6323
Local (US): +1 770-615-1250
Local (Germany): +49 695-170-9081
Passcode: 583191
Agenda
- Meeting Minutes
- New Committers
- Status Reports
- PTP 3.0 status
- PTP 4.0 Helios build and status
- RDT and remote status
- Resource Managers
- PLDT
- ETFw
- Photran
- Other Business
- Next meeting
Attendees
- Greg Watson, IBM
- Beth Tibbitts, IBM
- Jay Alameda, NCSA
- Al Rossi, NCSA
- Alan Humphrey, U.Utah
- Roland Schulz, UTK/ORNL
- Dave Wootton, IBM
- Jeff Overbey, UIUC
- Michael Lindo, IBM
Minutes
- Meeting Minutes - Beth will be responsible for these from now on.
- New Committers:
- Dieter Krachtus, U. Heidelberg (Remote Tools, PBS Resource Mgr, Scalability)
- Roland Schulz, UTK/ORNL (Remote Tools, PBS Resource Mgr, Scalability)
- Jie Jiang, China National University of Defense Technology (SLURM Resource Mgr.)
- Al Rossi, NCSA (committer status almost done)
- Status Reports
- PTP 3.0 status
- PTP 4.0 Helios build and status: M7 final build was Friday
- Release planning documentation: Simultaneous Release Plan and Eclipse Simultaneous Release Info and Simultaneous Release Tracker FAQ
- Bug to track our work on this: Bug 308569
- M7 has new RDT features, Greg requests that Jay please test.
- Still TODO for Helios: more message bundles, then submit to Babel; JUnit test plans, capabilities (or document). Greg looking at several of these. Beth working on PLDT message bundles and JUnit tests.
- Builds: Each Friday, but following Tuesday is last chance to get code in before the build that goes into the Helios Repository before each milestone/release candidate build.
- Next milestone is RC1 (Release Candidate 1) - platform build this Friday, our build the following Tuesday. Final RC1 is May 21.
- RDT and remote status
- Resource Managers
- PLDT
- ETFw
- Photran
- Other Business
- Next meeting