Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/May 2010"

< PTP‎ | meetings
(Minutes)
(Minutes)
Line 51: Line 51:
 
#** Release planning documentation: [http://wiki.eclipse.org/Helios/Simultaneous_Release_Plan Simultaneous Release Plan ] and [http://www.eclipse.org/helios/planning/EclipseSimultaneousRelease.php Eclipse Simultaneous Release Info] and [http://wiki.eclipse.org/Helios/Simultaneous_Release_Tracker_FAQ Simultaneous Release Tracker FAQ]
 
#** Release planning documentation: [http://wiki.eclipse.org/Helios/Simultaneous_Release_Plan Simultaneous Release Plan ] and [http://www.eclipse.org/helios/planning/EclipseSimultaneousRelease.php Eclipse Simultaneous Release Info] and [http://wiki.eclipse.org/Helios/Simultaneous_Release_Tracker_FAQ Simultaneous Release Tracker FAQ]
 
#** Bug to track our work on this: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=308569 Bug 308569]
 
#** Bug to track our work on this: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=308569 Bug 308569]
 +
#** M7 has new RDT features, Greg requests that Jay please test. 
 +
#** Still TODO for Helios: more message bundles, then submit to Babel; JUnit test plans, capabilities (or document).  Greg looking at several of these. Beth working on PLDT message bundles and JUnit tests.
 +
#** Builds: Each Friday, but following Tuesday is last chance to get code in before the build that goes into the Helios Repository before each milestone/release candidate build.
 +
#** Next milestone is RC1 (Release Candidate 1) - platform build this Friday, our build the following Tuesday.  Final RC1 is May 21.
 
#* RDT and remote status
 
#* RDT and remote status
 
#* Resource Managers
 
#* Resource Managers

Revision as of 13:37, 11 May 2010

May 2010 Meeting

Date: May 11, 2010 Time: 1:00 PM EST

Call in information:

Toll Free (US): 1 877-421-0033
Toll Free (Germany): 0800-181-6323
Local (US): +1 770-615-1250
Local (Germany): +49 695-170-9081
Passcode: 583191

Agenda

  1. Meeting Minutes
  2. New Committers
  3. Status Reports
    • PTP 3.0 status
    • PTP 4.0 Helios build and status
    • RDT and remote status
    • Resource Managers
    • PLDT
    • ETFw
    • Photran
  4. Other Business
  5. Next meeting

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Jay Alameda, NCSA
  • Al Rossi, NCSA
  • Alan Humphrey, U.Utah
  • Roland Schulz, UTK/ORNL
  • Dave Wootton, IBM
  • Jeff Overbey, UIUC
  • Michael Lindo, IBM

Minutes

  1. Meeting Minutes - Beth will be responsible for these from now on.
  2. New Committers:
    • Dieter Krachtus, U. Heidelberg (Remote Tools, PBS Resource Mgr, Scalability)
    • Roland Schulz, UTK/ORNL (Remote Tools, PBS Resource Mgr, Scalability)
    • Jie Jiang, China National University of Defense Technology (SLURM Resource Mgr.)
    • Al Rossi, NCSA (committer status almost done)
  3. Status Reports
    • PTP 3.0 status
    • PTP 4.0 Helios build and status: M7 final build was Friday
      • Release planning documentation: Simultaneous Release Plan and Eclipse Simultaneous Release Info and Simultaneous Release Tracker FAQ
      • Bug to track our work on this: Bug 308569
      • M7 has new RDT features, Greg requests that Jay please test.
      • Still TODO for Helios: more message bundles, then submit to Babel; JUnit test plans, capabilities (or document). Greg looking at several of these. Beth working on PLDT message bundles and JUnit tests.
      • Builds: Each Friday, but following Tuesday is last chance to get code in before the build that goes into the Helios Repository before each milestone/release candidate build.
      • Next milestone is RC1 (Release Candidate 1) - platform build this Friday, our build the following Tuesday. Final RC1 is May 21.
    • RDT and remote status
    • Resource Managers
    • PLDT
    • ETFw
    • Photran
  4. Other Business
  5. Next meeting

Back to the top