Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "WTP 2009-03-12"
(→Announcements And Special Reports) |
(→Attendees) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 56: | Line 56: | ||
|- | |- | ||
|Gabriel|| | |Gabriel|| | ||
+ | |- | ||
+ | |Eric || | ||
|- | |- | ||
|Kiril|| | |Kiril|| | ||
Line 64: | Line 66: | ||
|+ Friends | |+ Friends | ||
|width="80%"|Chris || | |width="80%"|Chris || | ||
− | |||
− | |||
|- | |- | ||
|Elson || | |Elson || | ||
Line 92: | Line 92: | ||
:*Concurrency discussion | :*Concurrency discussion | ||
:*Focus Item: | :*Focus Item: | ||
− | ::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2008-10-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before October 1st, 2008] (Last week | + | ::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2008-10-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before October 1st, 2008] (Last week 39 ; Currently ~ 38) |
::*Options: | ::*Options: | ||
:::*Mark invalid patches as obsolete | :::*Mark invalid patches as obsolete | ||
Line 127: | Line 127: | ||
− | Our schedule | + | Our initial schedule was based on [http://dev.eclipse.org/mhonarc/lists/cross-project-issues-dev/msg02686.html Platform's proposed schedule]. |
+ | |||
+ | The official "must do" schedule is the +2 category in the [[Galileo Simultaneous Release]]. | ||
Normally, our milestone are one week after the Platform's delivery. Exceptions noted below. | Normally, our milestone are one week after the Platform's delivery. Exceptions noted below. | ||
Line 140: | Line 142: | ||
::M5 -> Feb 6 | ::M5 -> Feb 6 | ||
::3.0.4 Coordinated Maintenance Release Feb 25<b> | ::3.0.4 Coordinated Maintenance Release Feb 25<b> | ||
− | ::M6 -> | + | ::M6 -> Wednesday, March 18 Feature Complete, API Freeze, UI Freeze, NLS, Accessibility</b> |
::(EclipseCon March 23-27) | ::(EclipseCon March 23-27) | ||
− | ::M7 -> May | + | ::M7 -> <b>Tuesday, May 5</b> Performance tuning, documentation, bug fixing |
− | ::RC1 -> May | + | ::RC1 -> <b>Tuesday, May 19</b> Serious bugs only, focus on stability. |
− | ::RC2 -> May | + | ::RC2 -> <b>Tuesday, May 26</b> WTP may not participate in an RC2 (based on based on previous years, RC2 comes too soon, needed more fixing effort, less testing) |
− | ::RC3 -> | + | ::RC3 -> <b>Tuesday, June 2</b> Very serious bugs only. |
− | ::RC4 -> | + | ::RC4 -> <b>Tuesday, June 9</b> Very very serious bugs only. |
− | ::RC5 -> | + | ::RC5 -> <b>Tuesday, June 16</b> Hopefully no changes from RC4. Prepare web pages, update sites, etc. |
− | ::GA -> | + | ::GA -> Wednesday, June 24 |
== Other business == | == Other business == | ||
Line 154: | Line 156: | ||
Bob Fraser and Nova the look and feel: | Bob Fraser and Nova the look and feel: | ||
(see bug [https://bugs.eclipse.org/bugs/show_bug.cgi?id=261721 261721]) | (see bug [https://bugs.eclipse.org/bugs/show_bug.cgi?id=261721 261721]) | ||
+ | |||
+ | [http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg06805.html Data Model Wizard Framework feature] (Kaloyan) | ||
== Advanced Topics: == | == Advanced Topics: == |
Latest revision as of 14:05, 12 March 2009
Contents
WTP Development Status Meeting
Attendees
|
|
|
Note: feel free to correct any errors/omissions in above attendance record.
Announcements And Special Reports
- Apologies for error in M6 date.
- XSL Graduation/Move Review on March 18th
- be sure to watch eclipse.webtools newsgroup for questions/comments
- Interesting blogs lately from Seneca Open Source Course.
WTP Calendar
Focus on Quality (Neil)
- Concurrency discussion
- Focus Item:
- Untargeted bugs with patches attached opened before October 1st, 2008 (Last week 39 ; Currently ~ 38)
- Options:
- Mark invalid patches as obsolete
- Target bugs to a release or "future" if not a current release
- Upcoming Focus item
- Past Focus Items
- Untargeted severity "Major" and higher bugs opened before June 1st, 2008 (64, 36, 21, 9)
- Options:
- Target to a specific release or "future" if planning to fix but not in the next release
- Adjust severity as appropriate
WTP 3.0.5
Pending.
WTP 3.1
- Ready to declare weekly build?
- Before M6, remember to list exceptions to feature-freeze-by-M6.
- First, mark for PMC approval (just using flag and email addresses, no whiteboard based summaries).
- One approval is enough. Once approved, list it in last section of
Issues to watch moving up to M6 prereqs
- Common Navigator changes: may change again in M6. See bug 252293: LabelProviders do not obey override rules
- JDT Compiler changes from I20090217-2200: eclipse-dev post
Schedule
Our initial schedule was based on Platform's proposed schedule.
The official "must do" schedule is the +2 category in the Galileo Simultaneous Release.
Normally, our milestone are one week after the Platform's delivery. Exceptions noted below.
- 3.0.1 Early Maintenance Release Aug 15
- M1 -> Aug 22 (extra week added so not to overlap maintenance release)
- 3.0.2 Coordinated Maintenance Release Sep 24
- M2 -> Sept 26 (extra week added so not to overlap maintenance release) (updated)
- M3 -> Nov 7 (short milestone, since "making up" for added week above)
- 3.0.3 Early Maintenance Release Nov 14
- M4 -> Dec 19
- M5 -> Feb 6
- 3.0.4 Coordinated Maintenance Release Feb 25
- M6 -> Wednesday, March 18 Feature Complete, API Freeze, UI Freeze, NLS, Accessibility
- (EclipseCon March 23-27)
- M7 -> Tuesday, May 5 Performance tuning, documentation, bug fixing
- RC1 -> Tuesday, May 19 Serious bugs only, focus on stability.
- RC2 -> Tuesday, May 26 WTP may not participate in an RC2 (based on based on previous years, RC2 comes too soon, needed more fixing effort, less testing)
- RC3 -> Tuesday, June 2 Very serious bugs only.
- RC4 -> Tuesday, June 9 Very very serious bugs only.
- RC5 -> Tuesday, June 16 Hopefully no changes from RC4. Prepare web pages, update sites, etc.
- GA -> Wednesday, June 24
Other business
Bob Fraser and Nova the look and feel: (see bug 261721)
Data Model Wizard Framework feature (Kaloyan)
Advanced Topics:
Ideas? Volunteers?
References
See also the WTP Meeting Archive-Reference Page.