= Objectives =
 +
<i><b>
 +
In order to provide a high level snapshot of the health of WTP components, scorecards with significant status information will be tracked for weekly, milestone, and release builds.  This is not intended to be a stop ship list of requirements, but more to give an overall picture of the relative stability and quality of WTP across all components.  The amount of benchmarks and level of scrutiny increases as you move from a weekly build to a release build.
 +
</b></i>
 +
 +
= Work in Progress =
 +
 +
These are living checklists.  Any contributor or committer are encouraged to share their opinions or add their own items as necessary.
 +
 +
== Suggestions ==
 +
*Somehow incorporate the size of the backlog and number of bugs opened against the applicable period.
 +
 +
 +
= Scorecard Templates =
 +
  
 
== [[WTP Weekly Scorecards]] ==
 
== [[WTP Weekly Scorecards]] ==
 
== [[WTP Milestone Scorecards]] ==
 
== [[WTP Milestone Scorecards]] ==
 
== [[WTP Release Scorecards]] ==
 
== [[WTP Release Scorecards]] ==
 +
:*[[WTP_Release_Scorecards_20 | WTP 2.0 Component Scorecards]]
 +
 +
 +
<br>
 +
<br>
 +
[[Category:Old, Obsolete and Interesting Things| ]]

Latest revision as of 02:26, 13 September 2008

Objectives

In order to provide a high level snapshot of the health of WTP components, scorecards with significant status information will be tracked for weekly, milestone, and release builds. This is not intended to be a stop ship list of requirements, but more to give an overall picture of the relative stability and quality of WTP across all components. The amount of benchmarks and level of scrutiny increases as you move from a weekly build to a release build.

Work in Progress

These are living checklists. Any contributor or committer are encouraged to share their opinions or add their own items as necessary.

Suggestions

  • Somehow incorporate the size of the backlog and number of bugs opened against the applicable period.


Scorecard Templates

WTP Weekly Scorecards

WTP Milestone Scorecards

WTP Release Scorecards