Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2013-08-01"

(New page: == WTP Development Status Meeting == <small>Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginni...)
 
(Bug Review)
 
(9 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
 
=== Announcements And Special Reports  ===
 
=== Announcements And Special Reports  ===
 
Welcome back!
 
  
 
=== WTP Calendar  ===
 
=== WTP Calendar  ===
Line 35: Line 33:
 
== WTP 3.5: Kepler ==
 
== WTP 3.5: Kepler ==
  
* Retrospective postponed to later this month when most folks are around to contribute
+
* [http://wiki.eclipse.org/Team_thoughts_on_continuous_improvement_35 Retrospective] postponed to later this month when most folks are around to contribute
  
 
== WTP 3.6: Luna ==
 
== WTP 3.6: Luna ==
  
 +
* [[WTP_Smoke_Test_Results| Smoke Test Results]]
 +
 +
 +
==== 3.6.0 Schedule ====
 +
:08/01 Regular I Build declare
 +
: ...
 +
:08/15 WTP M1 I Build declare
 +
:08/23 Official Luna 3.6.0 M1 availability - no declare
 +
: ...
 +
:10/4 Official Luna 3.6.0 M2 availability
 +
 +
 +
See "references" <ref>Our plan dates are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers.  We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for some "Simultaneous Release" due dates ... but it's hard to do much in that window, without disrupting everyone ... so we'll not use that buffer, except for the worst emergencies.]</ref> for detailed explanation of what these dates mean.
  
 
== WTP 3.5.1 ==
 
== WTP 3.5.1 ==
  
* Aligned with Eclipse Kepler SR1 Schedule
+
* [[WTP_Smoke_Test_Results| Smoke Test Results]]
* Builds started - junits need attention(move to jre7 build machines)
+
 
* No declared builds until 7/25
+
==== WTP 3.5.1 Schedule ====
 +
:08/01 Regular M Build declare
 +
:
 +
:08/15 RC1 build (after this build, begin PMC-review ramp-down (+1 begins))
 +
: ...
 +
:09/27 3.5.1 GA
 +
 
  
 
* Kepler SR1 Shutdown calendar  (from [http://wiki.eclipse.org/Kepler/Simultaneous_Release_Plan Kepler release doc])
 
* Kepler SR1 Shutdown calendar  (from [http://wiki.eclipse.org/Kepler/Simultaneous_Release_Plan Kepler release doc])
Line 101: Line 118:
 
==== Bug Review ====
 
==== Bug Review ====
  
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_id=&bug_id_type=anyexact&votes=&votes_type=greaterthaneq&target_milestone=0.3&target_milestone=3.5.1&target_milestone=3.5.1+RC1&target_milestone=3.5.1+RC2&target_milestone=3.5.1+RC3&target_milestone=3.5.1+RC4&target_milestone=3.3&target_milestone=3.3.1+RC1&target_milestone=3.3.1+RC2&target_milestone=3.3.1+RC3&target_milestone=3.3.1+RC4&format=table&action=wrap Bugs targeted to 3.5.1]
+
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=target_milestone&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_id=&bug_id_type=anyexact&votes=&votes_type=greaterthaneq&target_milestone=0.3&target_milestone=3.5.1&target_milestone=3.5.1+RC1&target_milestone=3.5.1+RC2&target_milestone=3.5.1+RC3&target_milestone=3.5.1+RC4&target_milestone=3.3.1&target_milestone=3.3.1+RC1&target_milestone=3.3.1+RC2&target_milestone=3.3.1+RC3&target_milestone=3.3.1+RC4&format=table&action=wrap Bugs targeted to 3.5.1]
  
 
:[https://bugs.eclipse.org/bugs/buglist.cgi?bug_file_loc=&bug_file_loc_type=allwordssubstr&bug_id=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bugidtype=include&chfieldfrom=&chfieldto=Now&chfieldvalue=&classification=WebTools&email1=&email2=&emailtype1=substring&emailtype2=substring&field0-0-0=noop&keywords=&keywords_type=allwords&longdesc=&longdesc_type=allwordssubstr&query_format=advanced&short_desc=hotbug%20hotbug_request&short_desc_type=anywordssubstr&status_whiteboard=&status_whiteboard_type=allwordssubstr&type0-0-0=noop&value0-0-0=&votes=&order=product%2Cchangeddate%20DESC%2Ctarget_milestone%2Cbug_severity%2Cpriority%2Cpriority%2Cbug_severity%2Cbug_severity%2Cassigned_to%2Cstatus_whiteboard%2Ctarget_milestone%2Ctarget_milestone%2Ccomponent%2Cvotes%20DESC%2Cbug_id Hotbugs] <ref>[[WTP/Hotbug_Policy| Hotbug Policy]]</ref>
 
:[https://bugs.eclipse.org/bugs/buglist.cgi?bug_file_loc=&bug_file_loc_type=allwordssubstr&bug_id=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bugidtype=include&chfieldfrom=&chfieldto=Now&chfieldvalue=&classification=WebTools&email1=&email2=&emailtype1=substring&emailtype2=substring&field0-0-0=noop&keywords=&keywords_type=allwords&longdesc=&longdesc_type=allwordssubstr&query_format=advanced&short_desc=hotbug%20hotbug_request&short_desc_type=anywordssubstr&status_whiteboard=&status_whiteboard_type=allwordssubstr&type0-0-0=noop&value0-0-0=&votes=&order=product%2Cchangeddate%20DESC%2Ctarget_milestone%2Cbug_severity%2Cpriority%2Cpriority%2Cbug_severity%2Cbug_severity%2Cassigned_to%2Cstatus_whiteboard%2Ctarget_milestone%2Ctarget_milestone%2Ccomponent%2Cvotes%20DESC%2Cbug_id Hotbugs] <ref>[[WTP/Hotbug_Policy| Hotbug Policy]]</ref>
Line 110: Line 127:
  
 
*CBI -
 
*CBI -
** Thanh has done an excellent job nudging us along, and we all need to be responsive to the requests.
 
 
** [https://bugs.eclipse.org/412211 latest blocker bug]
 
** [https://bugs.eclipse.org/412211 latest blocker bug]
 
** [[CBI| Eclipse Common Build Infrastructure home]]
 
** [[CBI| Eclipse Common Build Infrastructure home]]

Latest revision as of 14:24, 1 August 2013

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

WTP Calendar

(Weekly Google Calendar)


For Kepler/Luna overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.5: Kepler

  • Retrospective postponed to later this month when most folks are around to contribute

WTP 3.6: Luna


3.6.0 Schedule

08/01 Regular I Build declare
...
08/15 WTP M1 I Build declare
08/23 Official Luna 3.6.0 M1 availability - no declare
...
10/4 Official Luna 3.6.0 M2 availability


See "references" [1] for detailed explanation of what these dates mean.

WTP 3.5.1

WTP 3.5.1 Schedule

08/01 Regular M Build declare
08/15 RC1 build (after this build, begin PMC-review ramp-down (+1 begins))
...
09/27 3.5.1 GA


+0
Fri.
+1
Mon.
+2
Tues.
+3
Wed.
EPP
Thur.
Available
Fri.
RC1 (Warmup) 8/16 8/19 8/20 8/21 8/22 8/23
RC2 8/30 9/02 9/03 9/04 9/05 9/06
RC3 9/06 9/09 9/10 9/11 9/12 9/13
RC4 9/13 9/16 9/17 9/18 9/19 9/20
Juno SR1 ("GA") quiet: 9/20 quiet: 9/23 quiet: 9/24 quiet: 9/25 quiet: 9/26 GA: 9/27

Bug Review

Bugs targeted to 3.5.1
Hotbugs [2]
Blocker and Critical

Other business - Long term tracking items

References

  1. Our plan dates are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers. We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for some "Simultaneous Release" due dates ... but it's hard to do much in that window, without disrupting everyone ... so we'll not use that buffer, except for the worst emergencies.]
  2. Hotbug Policy

Also, see

Kepler SR1 Simultaneous Release Schedule
Indigo release retrospective
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
See also the WTP Meeting Archive-Reference Page.

Back to the top