Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2012-03-08"

(New page: == WTP Development Status Meeting == <small>Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginni...)
 
(Announcements And Special Reports)
 
(9 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
=== Announcements And Special Reports  ===
 
=== Announcements And Special Reports  ===
  
Congrats on Indigo SR2 release!
+
* Reminder:  U.S. / Canada Shifts the clock forward (begins Daylight Saving Time) this weekend.  Europe starts two weeks later...
 
+
** So for most people outside the U.S. - Next week's meetings will start 1 hour earlier.
  
 
=== WTP Calendar  ===
 
=== WTP Calendar  ===
Line 36: Line 36:
 
== WTP 3.4.0 ==
 
== WTP 3.4.0 ==
  
* [[WTP_Smoke_Test_Results| latest build delayed...]]
+
* [[WTP_Smoke_Test_Results| Smoke Test Results]]
  
 
* Found problems with 4.x based builds?  We wish to start tracking these issues, and will publish query.
 
* Found problems with 4.x based builds?  We wish to start tracking these issues, and will publish query.
Line 46: Line 46:
 
** [http://wiki.eclipse.org/Juno/Simultaneous_Release_Plan Juno/Simultaneous Release Plan]
 
** [http://wiki.eclipse.org/Juno/Simultaneous_Release_Plan Juno/Simultaneous Release Plan]
 
** [http://www.eclipse.org/projects/project-plan.php?projectid=webtools Top level plan]
 
** [http://www.eclipse.org/projects/project-plan.php?projectid=webtools Top level plan]
 +
** [[WTP_3.4_Ramp_down_Plan_for_Juno| 3.4 Rampdown plan]]
  
 
==== 3.4.0 Schedule ====
 
==== 3.4.0 Schedule ====
Line 52: Line 53:
 
:03/15 WTP M6 declare  (Eclipsecon driver)
 
:03/15 WTP M6 declare  (Eclipsecon driver)
 
:3/23 Juno M6 (No WTP build declared this week)
 
:3/23 Juno M6 (No WTP build declared this week)
:3/25 Eclipsecon starts
+
:3/25 Eclipsecon starts (No builds this week)
 
+
:4/5 I build declare(Start of M7)
 +
...
 +
:M7 05/04 (for delivery to Juno+2 on 05/09)(after this build, begin PMC +1)
 +
:RC1 05/18 (for delivery to Juno+2 on 05/23)(after this build, still PMC +1)
 +
:RC2 05/25 (for delivery to Juno+2 on 05/30)(after this build, begin PMC +2)
 +
:RC3 06/01 (for delivery to Juno+2 on 06/06)(after this build, begin PMC +3)
 +
:RC4 06/08 (for delivery to Juno+2 on 06/13) [Final build]
 +
:Juno GA 06/27
  
 
==== Bug Review ====
 
==== Bug Review ====
Line 80: Line 88:
  
 
Also, see  
 
Also, see  
 +
 +
: [[WTP_3.4_Ramp_down_Plan_for_Juno| 3.4 Rampdown plan]]
  
 
: [http://wiki.eclipse.org/Indigo/Simultaneous_Release_Plan#SR2 Indigo SR2 Simultaneous Release Schedule]
 
: [http://wiki.eclipse.org/Indigo/Simultaneous_Release_Plan#SR2 Indigo SR2 Simultaneous Release Schedule]

Latest revision as of 15:05, 8 March 2012

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

  • Reminder: U.S. / Canada Shifts the clock forward (begins Daylight Saving Time) this weekend. Europe starts two weeks later...
    • So for most people outside the U.S. - Next week's meetings will start 1 hour earlier.

WTP Calendar

(Weekly Google Calendar updated through February, 2012)


For Juno/Indigo overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.4.0

  • Found problems with 4.x based builds? We wish to start tracking these issues, and will publish query.
  • Juno Project planning

3.4.0 Schedule

03/08 I build declare (Start quiet week)
03/15 WTP M6 declare (Eclipsecon driver)
3/23 Juno M6 (No WTP build declared this week)
3/25 Eclipsecon starts (No builds this week)
4/5 I build declare(Start of M7)

...

M7 05/04 (for delivery to Juno+2 on 05/09)(after this build, begin PMC +1)
RC1 05/18 (for delivery to Juno+2 on 05/23)(after this build, still PMC +1)
RC2 05/25 (for delivery to Juno+2 on 05/30)(after this build, begin PMC +2)
RC3 06/01 (for delivery to Juno+2 on 06/06)(after this build, begin PMC +3)
RC4 06/08 (for delivery to Juno+2 on 06/13) [Final build]
Juno GA 06/27

Bug Review

Bugs targeted to 3.4.0
Hotbugs
Blocker and Critical

Other business

  • bug 371693 Discussion of including features vs. requiring features
  • Anything else?

References


Also, see

3.4 Rampdown plan
Indigo SR2 Simultaneous Release Schedule
Indigo release retrospective
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
WTP Helios retrospective.
See also the WTP Meeting Archive-Reference Page.

Back to the top