Difference between revisions of "WTP 2012-02-02"

(Focus on Quality (Neil))
 
Line 38: Line 38:
 
==== 3.3.2 Schedule ====
 
==== 3.3.2 Schedule ====
  
:2/2 M build (after this build, begin +2)
+
:2/2 RC2 build (after this build, begin +2)
 
:
 
:
:2/9 M build (after this build, begin +3)
+
:2/9 RC3 build (after this build, begin +3)
 
:
 
:
:2/16 final M build (with one week of buffer following this week, quiet week, until 9/23 (re-spin would require +3))
+
:2/16 RC4 (final) M build (with one week of buffer following this week, quiet week, until 9/23 (re-spin would require +3))
 
:
 
:
 
:2/24  SR2 GA
 
:2/24  SR2 GA

Latest revision as of 15:05, 2 February 2012

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

WTP Calendar

(Weekly Google Calendar updated through February, 2012)


For Juno/Indigo overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.3.2

3.3.2 Schedule

2/2 RC2 build (after this build, begin +2)
2/9 RC3 build (after this build, begin +3)
2/16 RC4 (final) M build (with one week of buffer following this week, quiet week, until 9/23 (re-spin would require +3))
2/24 SR2 GA

Bug Review

Bugs targeted to 3.3.2
Hotbugs [1]
Indigo SR2 Blocker and Critical

WTP 3.4.0

  • No Smoke this week - M5 aggregation builds ongoing.. declare next week
  • Overall feedback for e4. Provide unified feedback - Comments need backing bugzilla entries
  • Found problems with 4.x based builds? We wish to start tracking these issues, and will publish query.
  • Juno Project planning

3.4.0 Schedule

02/03 Juno M5 (No WTP build declared this week)
02/09 First M6 I build declare

...

03/15 WTP M6 declare (Eclipsecon driver)
3/23 Juno M6 (No WTP build declared this week)
3/25 Eclipsecon starts


Bug Review

Bugs targeted to 3.4.0
Hotbugs
Blocker and Critical

Other business

  • Juno CQs required by end of M5 (2/3/2012) ... add comment "required for Juno" if required for Juno, so IP staff can prioritize. See post on cross project list.
  • Anything else?

References

  1. Hotbug Policy

Also, see

Indigo SR2 Simultaneous Release Schedule
Indigo release retrospective
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
WTP Helios retrospective.
See also the WTP Meeting Archive-Reference Page.