Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

WTP 2011-12-15

Revision as of 11:19, 15 December 2011 by Cbridgha.us.ibm.com (Talk | contribs) (Other business)

WTP Development Status Meeting

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

WTP Calendar

(Weekly Google Calendar updated through February, 2012)


For Juno/Indigo overall dates, see the Simultaneous Release Calendar


Focus on Quality (Neil)

  • Improve:
  • Triage:
  • Target to a specific release or "future" if planning to fix but not in the next release
  • Adjust severity as appropriate

WTP 3.3.2

3.3.2 Schedule

12/15 M Build
No declared builds until 1/5/2012(M builds will continue)

...

1/26 M build (after this build, begin PMC-review ramp-down (+1 begins))
2/2 M build (after this build, begin +2)
2/9 M build (after this build, begin +3)
2/16 final M build (with one week of buffer following this week, quiet week, until 9/23 (re-spin would require +3))
2/24 SR2 GA

Bug Review

Bugs targeted to 3.3.2
Hotbugs [1]
Indigo SR2 Blocker and Critical

WTP 3.4.0

  • Found problems with 4.x based builds? We wish to start tracking these issues, and will publish query.
  • Juno Project planning
      • M4: Final Plans due

3.4.0 Schedule

12/16 Juno M4 (No WTP build declared this week)
No declared builds until 1/5/2012(normal builds will continue)

...

01/26 WTP M5 declare
02/03 Juno M5 (No WTP build declared this week)

Bug Review

Bugs targeted to 3.4.0
Hotbugs
Blocker and Critical

Other business

  • Are we doing enough to address issues with e4? Should we all start developing using M4 3.4 driver? We need to give feedback - UI/workbench issues etc.
  • No meetings/build declares after 12/15, resume 1st week in 2012
  • Anything else?

Indigo release retrospective

References

  1. Hotbug Policy

Also, see

Indigo SR2 Simultaneous Release Schedule
Standard Format Plans
WTP 3.2.x maintenance release plan
how/when to branch code?
IP Logs selector
WTP Helios retrospective.
See also the WTP Meeting Archive-Reference Page.

Copyright © Eclipse Foundation, Inc. All Rights Reserved.