Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "WTP 2011-06-02"
(→Focus on Quality (Neil)) |
(→Focus on Quality (Neil)) |
||
Line 24: | Line 24: | ||
*Focus Item: | *Focus Item: | ||
− | :*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2011- | + | :*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=nowords&keywords=helpwanted&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&emailtype1=regexp&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2011-06-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=noop&value0-0-0=%7C%2C Untargeted severity "Major" and higher bugs opened before June 1st, 2011] (This week - 28) |
:*Options: | :*Options: | ||
::*Target to a specific release or "future" if planning to fix but not in the next release | ::*Target to a specific release or "future" if planning to fix but not in the next release |
Revision as of 13:59, 2 June 2011
Contents
WTP Development Status Meeting
Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.
Announcements And Special Reports
WTP Calendar
(Weekly Google Calendar updated through June, 2011)
For Indigo/Helios overall dates, see a Simultaneous Release Calendar
Focus on Quality (Neil)
- Focus Item:
- Untargeted severity "Major" and higher bugs opened before June 1st, 2011 (This week - 28)
- Options:
- Target to a specific release or "future" if planning to fix but not in the next release
- Adjust severity as appropriate
- Untargeted bugs and enhancements with patches attached over 1 year old (This week - 15; Last week - 17)
- Untargeted bugs and enhancements with patches attached (This week - 26; Last week - 29)
WTP 3.2.5
- Maintenance stream opened
- No I Build this week
3.2.5 Schedule
- TBD
3.2.5 Bug Review
WTP 3.3.0
- RC4 Build will be delayed... eclipse.org infrastructure woes.....
- Smoketest scheduled tomorrow? - declare Monday?
- Candidate build
- latest build
Schedule
- RC4 06/02 (for delivery to Indigo+2 on 06/07) [Final build]
- GA 06/22
Bug Review
- Open bugs targeted to WTP 3.3 please triage!
Release Materials
- IP Log submitted on 5/18 (i.e., on time)
- Release documentation ... ready for Project Leads ... work can be tracked in bug 346496. Needs to be completed Today!.
- Here is the latest Release doc
Reminders for extra testing