Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2010-09-30"

(Announcements And Special Reports)
(WTP 3.2.2)
Line 124: Line 124:
 
<br>
 
<br>
  
== WTP 3.2.2  ==
 
 
* Ready to <del>declare [[WTP_Smoke_Test_Results| latest build]]? </del> release?!
 
 
<!--
 
 
* Bug Review
 
 
:[https://bugs.eclipse.org/bugs/buglist.cgi?bug_file_loc=&bug_file_loc_type=allwordssubstr&bug_id=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bugidtype=include&chfieldfrom=&chfieldto=Now&chfieldvalue=&classification=WebTools&email1=&email2=&emailtype1=substring&emailtype2=substring&field0-0-0=noop&keywords=&keywords_type=allwords&longdesc=&longdesc_type=allwordssubstr&query_format=advanced&short_desc=hotbug%20hotbug_request&short_desc_type=anywordssubstr&status_whiteboard=&status_whiteboard_type=allwordssubstr&type0-0-0=noop&value0-0-0=&votes=&order=product%2Cchangeddate%20DESC%2Ctarget_milestone%2Cbug_severity%2Cpriority%2Cpriority%2Cbug_severity%2Cbug_severity%2Cassigned_to%2Cstatus_whiteboard%2Ctarget_milestone%2Ctarget_milestone%2Ccomponent%2Cvotes%20DESC%2Cbug_id Hotbugs] <ref>[[WTP/Hotbug_Policy| Hotbug Policy]]</ref>
 
 
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced;bug_severity=blocker;bug_severity=critical;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;classification=WebTools;product=Dali%20JPA%20Tools;product=Java%20Server%20Faces;product=JSDT;product=Web%20Tools;product=WTP%20Common%20Tools;product=WTP%20Datatools;product=WTP%20EJB%20Tools;product=WTP%20Java%20EE%20Tools;product=WTP%20Releng;product=WTP%20ServerTools;product=WTP%20Source%20Editing;product=WTP%20Webservices;product=WTP%20Website  Blocker and Critical]
 
 
:[https://bugs.eclipse.org/bugs/buglist.cgi?type1-0-0=notsubstring;field0-0-0=priority;columnlist=bug_status%2Cproduct%2Ccomponent%2Cassigned_to%2Creporter%2Cpriority%2Cbug_severity%2Cresolution%2Ctarget_milestone%2Cshort_desc;value2-0-0=3.0.5%20P%2C%201.5.5%20P%20;field2-0-0=target_milestone;classification=WebTools;type2-0-0=nowordssubstr;query_format=advanced;bug_status=NEW;bug_status=ASSIGNED;bug_status=REOPENED;value1-0-0=3.1;type0-0-0=equals;value0-0-0=P1;field1-0-0=target_milestone;product=Dali%20JPA%20Tools;product=Java%20Server%20Faces;product=Web%20Tools;product=WTP%20Common%20Tools;product=WTP%20EJB%20Tools;product=WTP%20Java%20EE%20Tools;product=WTP%20Releng;product=WTP%20ServerTools;product=WTP%20Source%20Editing;product=WTP%20Webservices;product=WTP%20Website P1s that need attention]
 
 
:[http://www.eclipse.org/webtools/plans/3.2.2/pmc-bug-approval.php PMC Approval Summary]
 
 
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=resolution&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&target_milestone=3.2.2&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= Bugs targeted to 3.2.2]
 
 
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=resolution&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&target_milestone=2.3.2&longdesc_type=allwordssubstr&longdesc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= Bugs targeted to 2.3.2]
 
 
-->
 
 
===3.2.2 schedule===
 
 
<!--
 
 
:: 8/3 Start R3.2.2 builds against (same) maintenance branch of map files (R3_2_maintenance, R2_3_maintenance for Dali)
 
 
::: Project lead review and approval until Aug 27
 
:: '''[Our WTP 3.2.1 release will be used to contribute to Helios SR1 RC1 +2 due on 8/11]'''
 
:: 8/13 Declared M-build
 
:: 8/20 Declared M-build
 
:: 8/27 Declared M-build  '''[contributed to Helios SR1 RC2 +2 due on 9/1]'''
 
::: PMC +1 review: Aug 27 - Sep 3
 
:: 9/3 Declared M-build  '''[contributed to Helios SR1 RC3 +2 due on 9/8]'''
 
::: PMC +2 review: Sep 3 - Sep 10
 
:: 9/10 Declared M-build <== final build '''[contributed to Helios SR1 RC4 +2 due on 9/15]'''
 
::: PMC +3 review: Sep 10 - Sep 24
 
::: Sep 10 - Sep 24 is "quiet week" to allow in depth testing with no changes
 
:::: Any "stop ship" builds needs not only PMC review/approval, but also Planning Council Exception, after 9/15
 
 
-->
 
 
:: 9/24 Official Release
 
 
 
See "references" <ref>Our plan dates are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers.  We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for some "Simultaneous Release" due dates ... but it's hard to do much in that window, without disrupting everyone ... so we'll not use that buffer, except for the worst emergencies.]</ref> for detailed explanation of what these dates mean.
 
  
  

Revision as of 12:25, 30 September 2010

WTP Development Status Meeting

Attendees

Project Leads
Carl
Tim
Keith
Nitin
Chuck
Kaloyan
Raghu
Neil
David
Committers
Bob
Konstantin
Chris
Dave
Larry
Kate
Angel
Valentin
Paul
Nick
Gabriel
Eric
Rob
Sam
Friends
Elson
Ian
Aidyl

Note: feel free to correct any errors/omissions in above attendance record.

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

  • Congratulations on 3.2.2 Release (And, thank you Nitin for the news item).
* 180 Bugs fixed in 3.2.1
* 154 Bugs fixed in 3.2.2

WTP Calendar

(Weekly Google Calendar updated through June, 2010)


For Indigo/Helios overall dates, see a Simultaneous Release Calendar



WTP 3.2.3

I have tagged WTP map files with

R3_2_2 (Dali with R2_3_2)

And suggest you do the same with your code.

3.2.3 build job will be created soon (next week?) to continue builds of R3_2_maintenance branch

Smoke tests and declared M builds will resume in ... January?

WTP 3.3.0

  • Do we need to move smoke test deadline to Friday? (Need Indigo contribution by Tuesday, 9/28)


Planning

  • Project Leads: See subproject plan documents under standard-project-plans\indigo\
  • Initial Planning document by M2
  • Iterate/Review plans by M3
  • Final Plans by M4


Themes

  • improve Java EE 6 support
  • e4 (Eclipse 4.1) tolerance (no exploitation of non compatible function planned)
  • Objective is to work with both Platform 3.7 and 4.1 (with only one set of compiled code ... compiled against 3.7)
See briefest Eclipse 4.0 intro. One thing I forgot there, was a pointer to e4-dev mailing list ... that's were Eclipse 4.0 builds are currently discussed, announced (in addition to e4-only topics).


Other Candidate Themes?

Anyone interested in these? Resources available? Do they cross projects, or just enhancement to one or two?

  • Maven enablement support (at least make more friendly for maven users, if not direct support)
  • OSGi enterprise support
  • Any items from "top 10" list of problems to focus on. deadlocks? performance? modularity? api? test coverage?
  • ... ?

Schedule

8/13 WTP M1 (and first declared build)

9/24 WTP M2 (technically contribute to Indigo on Tuesday, +2 day)

Other business

  •  ?

References


Also, see

WTP 3.2.x maintenance release plan

how/when to branch code?

WTP_3.2_Ramp_down_Plan_for_Helios

Web Tools Platform Plans

IP Logs selector

WTP Helios retrospective.


See also the WTP Meeting Archive-Reference Page.

Back to the top