Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2010-03-11"

(Quality Focus Items (Neil))
(3/11)
Line 103: Line 103:
 
=== Announcements And Special Reports  ===
 
=== Announcements And Special Reports  ===
  
* Congratulations to JAX-WS for successful move review. I assume we'll actually do move around 3/18?
+
* ?
  
 
=== WTP Calendar  ===
 
=== WTP Calendar  ===
Line 120: Line 120:
  
 
:*Focus Item:
 
:*Focus Item:
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2010-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before Jan 1st, 2010] (Current: 10, Last week: 16)
+
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2010-01-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before Jan 1st, 2010] (Current: 16, Last week: 18)
 
::*Options:
 
::*Options:
 
:::*Mark invalid patches as obsolete
 
:::*Mark invalid patches as obsolete
Line 160: Line 160:
 
== Other business  ==
 
== Other business  ==
  
 +
* [[WTP_3.2_Ramp_down_Plan_for_Helios]]
  
 
* Need to update [http://www.eclipse.org/projects/project-plan.php?projectid=webtools Web Tools Platform Plans] to include JSDT.  
 
* Need to update [http://www.eclipse.org/projects/project-plan.php?projectid=webtools Web Tools Platform Plans] to include JSDT.  
 
:: Done ... but ... now [http://www.eclipse.org/projects/project-plan.php?projectid=webtools.jsdt webtools.jsdt plan link] is broken?
 
  
 
* Need "policy and practice" on marking bugzilla items so they show up as "deffered". (Raghu)
 
* Need "policy and practice" on marking bugzilla items so they show up as "deffered". (Raghu)
::The recommended practice for marking plan items as deferred is to set the Target Milestone to 'Future' as in:
 
:::'''keywords=plan&target_milestone=Future'''
 
::If sub-projects have different criteria, Project leads should adjust the query in the plan. Some of the sub-projects have used the following criteria:
 
:::keywords=plan&target_milestone=-
 
:::keywords=plan&target_milestone=4.0
 
  
* We need to improve website '''content'''.  
+
* [http://www.eclipsecon.org/2010/table/table?date=2010-03-23 EclipseCon informal "WTP Meeting"] ... Tuesday evening, 6 to 7.
 +
 
 +
* Heads up: "update URL" to change for Helios. /webtools/repository/helios? (Comment in {{bug|303935}})
 +
 
 +
 
 +
 
 +
* We need to improve website and logo? See bug {{bug|301940}} and bug {{bug|300475}}.
 
 
 
* we require some <del>quick</del> changes for JUnit V4
 
* we require some <del>quick</del> changes for JUnit V4
Line 179: Line 179:
 
* Accessibility checklist required by end of M6 (at latest)
 
* Accessibility checklist required by end of M6 (at latest)
  
::See [[:Category:WTP_Accessibility]]
+
::TODO: create a wiki "form" representing the above lists, for sub-projects to fill in.
  
 
== References  ==
 
== References  ==
 
[[WTP_3.2_Ramp_down_Plan_for_Helios]]
 
  
 
[http://www.eclipse.org/projects/project-plan.php?projectid=webtools Web Tools Platform Plans]
 
[http://www.eclipse.org/projects/project-plan.php?projectid=webtools Web Tools Platform Plans]

Revision as of 12:08, 11 March 2010

WTP Development Status Meeting

Attendees

Project Leads
Carl
Tim
Keith
Nitin
Chuck
Kaloyan
Raghu
Neil
David
Committers
Bob
Konstantin
Chris
Dave
Larry
Kate
Angel
Valentin
Paul
Nick
Gabriel
Rob
Sam
Friends
Elson
Ian
Aidyl

Note: feel free to correct any errors/omissions in above attendance record.

Remember, any committer can add an agenda item. Typically, short announcements or news items go in the "Announcements" section at the beginning. Longer items or issues requiring discussion should go in the "Other business" section at end.

Announcements And Special Reports

  •  ?

WTP Calendar

(Weekly Google Calendar updated through June, 2010)


For Galileo and Helios overall dates, see a Simultaneous Release Calendar


Quality Focus Items (Neil)

  • Focus Item:
  • Mark invalid patches as obsolete
  • Target bugs to a release or "future" if not a current release
  • Old Bugs

WTP 3.2


  • Bugs
Hotbugs
Blocker and Critical
P1s that need attention
Plan items targeted to WTP 3.2

Schedule

M6 03/12 - API, UI Freeze. Accessibility Reports.
M7 04/30
RC1 05/14 (followed by weekly RCs, if needed)
Final WTP 3.2 build 06/10
(06/23 Helios Release)


Note: these (and our plan dates) are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers. We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for "Simultaneous Release" due date ... but it's hard to do much in that window, without disrupting everyone ... so we'd not use that buffer, except for the worst emergencies.]

Other business

  • Need "policy and practice" on marking bugzilla items so they show up as "deffered". (Raghu)
  • Heads up: "update URL" to change for Helios. /webtools/repository/helios? (Comment in bug 303935)


  • we require some quick changes for JUnit V4
http://dev.eclipse.org/mhonarc/lists/wtp-releng/msg07680.html
  • Accessibility checklist required by end of M6 (at latest)
TODO: create a wiki "form" representing the above lists, for sub-projects to fill in.

References

Web Tools Platform Plans

IP Logs selector

WTP 3.1 Post Mortem


See also the WTP Meeting Archive-Reference Page.

Copyright © Eclipse Foundation, Inc. All Rights Reserved.