Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2009-09-10"

(Current Build)
(Current Build)
 
(6 intermediate revisions by 2 users not shown)
Line 16: Line 16:
 
|-
 
|-
 
| Keith
 
| Keith
|  
+
| Y
 
|-
 
|-
 
| Nitin
 
| Nitin
|  
+
| Y
 
|-
 
|-
 
| Chuck
 
| Chuck
|  
+
| Y
 
|-
 
|-
 
| Kaloyan
 
| Kaloyan
|  
+
| Y
 
|-
 
|-
 
| Raghu
 
| Raghu
 
|  
 
|  
 
|-
 
|-
| Neil
+
| Neil (Karen for ~)
|  
+
| Y
 
|-
 
|-
 
| David
 
| David
|  
+
| Y
 
|}
 
|}
  
Line 45: Line 45:
 
|-
 
|-
 
| Carl
 
| Carl
|  
+
| Y
 
|-
 
|-
 
| Chris
 
| Chris
|  
+
| Y
 
|-
 
|-
 
| Dave
 
| Dave
Line 57: Line 57:
 
|-
 
|-
 
| Larry
 
| Larry
|
+
| Y
 
|-
 
|-
 
| Kate
 
| Kate
|
+
| Y
 
|-
 
|-
 
| Angel
 
| Angel
|  
+
| Y
 
|-
 
|-
 
| Valentin
 
| Valentin
|  
+
| Y
 
|-
 
|-
 
| Gary
 
| Gary
Line 75: Line 75:
 
|-
 
|-
 
| Nick
 
| Nick
|  
+
| Y
 
|-
 
|-
 
| Gerry
 
| Gerry
Line 81: Line 81:
 
|-
 
|-
 
| Gabriel
 
| Gabriel
|  
+
| Y
 
|-
 
|-
 
| Eric
 
| Eric
Line 93: Line 93:
 
|-
 
|-
 
| Karen
 
| Karen
|
+
| Y
 
|-
 
|-
 
| Rob
 
| Rob
 
|  
 
|  
 +
|-
 +
| Sam
 +
| Y
 
|}
 
|}
  
Line 104: Line 107:
 
|-
 
|-
 
| width="80%" | Elson
 
| width="80%" | Elson
|
+
| Y
 
|-
 
|-
 
| Ian
 
| Ian
|
+
| Y
 
|-
 
|-
 
| Aidyl
 
| Aidyl
|  
+
| Y
 +
|-
 +
| Simon
 +
| Y
 
|}
 
|}
  
Line 119: Line 125:
 
=== Announcements And Special Reports  ===
 
=== Announcements And Special Reports  ===
  
* ?
+
* It's a girl!
  
 
=== WTP Calendar  ===
 
=== WTP Calendar  ===
Line 136: Line 142:
  
 
:*Focus Item:
 
:*Focus Item:
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2009-08-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before August 1st, 2009] (Currently ~ 54)
+
::*[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=product&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=ATF&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&product=WTP+Common+Tools&product=WTP+Datatools&product=WTP+EJB+Tools&product=WTP+Incubator&product=WTP+Java+EE+Tools&product=WTP+Releng&product=WTP+ServerTools&product=WTP+Source+Editing&product=WTP+Webservices&product=WTP+Website&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=trivial&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=2000-01-01&chfieldto=2009-08-01&chfield=%5BBug+creation%5D&chfieldvalue=&format=table&action=wrap&field0-0-0=attachments.ispatch&type0-0-0=equals&value0-0-0=1&field0-1-0=attachments.isobsolete&type0-1-0=equals&value0-1-0=0 Untargeted bugs with patches attached opened before August 1st, 2009] (Previous Weeks: 54) (Current: 43)
 
::*Options:
 
::*Options:
 
:::*Mark invalid patches as obsolete
 
:::*Mark invalid patches as obsolete
Line 148: Line 154:
  
 
* Ready to declare [[WTP Smoke Test Results| '''final''' build]]?
 
* Ready to declare [[WTP Smoke Test Results| '''final''' build]]?
 +
 +
'''No :( ... need to investigate [https://bugs.eclipse.org/bugs/show_bug.cgi?id=289090 bug 289090].
  
 
=== Schedule  ===
 
=== Schedule  ===
Line 224: Line 232:
  
 
* Any comments on [[WTP/Conventions_of_bug_priority_and_severity]]?
 
* Any comments on [[WTP/Conventions_of_bug_priority_and_severity]]?
 +
 +
''Notes: no objections. Only discussion was if I meant to '''exclude''' users from opening '''blocking''' bugs. Answer was 'no ... just to discourage, since I think it would be so rare'. I'll re-read to see if needs to be softened.''
  
 
== References  ==
 
== References  ==

Latest revision as of 17:27, 10 September 2009

WTP Development Status Meeting

Attendees

Project Leads
Konstantin
Tim
Keith Y
Nitin Y
Chuck Y
Kaloyan Y
Raghu
Neil (Karen for ~) Y
David Y
Committers
Bob
Carl Y
Chris Y
Dave
Naci
Larry Y
Kate Y
Angel Y
Valentin Y
Gary
Paul
Nick Y
Gerry
Gabriel Y
Eric
Kiril
Cameron
Karen Y
Rob
Sam Y
Friends
Elson Y
Ian Y
Aidyl Y
Simon Y

Note: feel free to correct any errors/omissions in above attendance record.

Announcements And Special Reports

  • It's a girl!

WTP Calendar

(Weekly Google Calendar updated through June, 2010)


For Galileo and Helios overall dates, see a Simultaneous Release Calendar


Quality Focus Items (Neil)

  • Focus Item:
  • Mark invalid patches as obsolete
  • Target bugs to a release or "future" if not a current release

WTP 3.1.x

Current Build

No :( ... need to investigate bug 289090.

Schedule

See also the Galileo ramp down dates

SR1

09/11 R Build Final Build (PMC +3 required for emergency rebuilds after final build)
(09/25 Galileo SR1) (WTP 3.1.1) (fourth Friday of September)

SR2

01/08 M Build
01/15 M Build for SR2 RC1
01/29 M Build for SR2 RC2 (PMC Review starts following this build)
02/05 M Build for SR2 RC3 Can this be our final build?
02/12 R Build Final Build
(02/26 Galileo SR2) (WTP 3.1.2) (fourth Friday of February)

Bugs

Targeted and unresolved for 3.1.1 or 2.2.1
hotbugs
resolved for 3.1.1 or 2.2.1
PMC Review begins after this week's RC2 candidate declared.

Galileo Maintenance Plan

See WTP_3.1.x_Maintenance for documentation of scope of maintenance and approvals required.

WTP 3.2

  • Planning (initial plans due on or before second Helios Milestone)
See http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg07100.html
For general directions, you can use the 3.1 Project Plans reference.

Schedule

M1 8/14
M2 9/25
Initial WTP 3.2 plans due 10/2 -- for Helios!
M3 11/06
M4 12/11
M5 01/29
M6 03/12
M7 04/30
RC1 05/14 (followed by weekly RCs, if needed)
Final WTP 3.2 build 06/10
(06/23 Helios Release)


Note: these (and our plan dates) are on 'Friday' of the week. But, we produce and test the build on Thursday of the week, and ideally declare on Thursday. The dates in the Google Web Tools group calendar are for 'Thursdays' since that's a calendar for committers. We give ourselves the buffer to Friday, as our "public" date, that others can pick up our build, just in case a regression is found on Thursday and we have to respin and retest. [Technically, some might say, we still have till the following Tuesday or Wednesday for "Simultaneous Release" due date ... but it's hard to do much in that window, without disrupting everyone ... so we'd not use that buffer, except for the worst emergencies.]

WTP 3.2G

  • We have once-a-day Galileo-based WTP 3.2 builds. Same WTP code. Different pre-req Platform. The goal is to make sure our 3.2 stream is at least compatible with both Galileo and Helios. Or, if we can not literally achieve being compatible, we should document why not and at least understand it.
  • Any issues?

Other business

  • remember to update Project Metadata to point to /helios in plan URL

Notes: no objections. Only discussion was if I meant to exclude users from opening blocking bugs. Answer was 'no ... just to discourage, since I think it would be so rare'. I'll re-read to see if needs to be softened.

References

WTP 3.1 Post Mortem

ramp down plan and policies

See also the WTP Meeting Archive-Reference Page.

Back to the top