Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "WTP 2008-07-24"

(initial content)
 
(WTP Calendar)
 
(29 intermediate revisions by 2 users not shown)
Line 8: Line 8:
 
{| border="1"
 
{| border="1"
 
|+ Project Leads
 
|+ Project Leads
|width="80%"|Konstantin ||  
+
|width="80%"|Konstantin || Y
 
|-
 
|-
|Tim ||  
+
|Tim || Y
 
|-
 
|-
|Nitin ||  
+
|Nitin || Y
 
|-
 
|-
|Kathy ||  
+
|Kathy || R
 
|-
 
|-
|Chuck ||  
+
|Chuck || R
 
|-
 
|-
|Kaloyan||  
+
|Kaloyan|| Y
 
|-
 
|-
|Raghu ||  
+
|Raghu || R
 
|-
 
|-
|Neil ||  
+
|Neil || N
 
|-
 
|-
|David ||  
+
|David || Y
 
|-
 
|-
|Helen ||  
+
|Helen || R
 
|-
 
|-
 
|Philippe ||  
 
|Philippe ||  
Line 33: Line 33:
 
{| border="1"
 
{| border="1"
 
|+ Committers
 
|+ Committers
|width="80%"|Bob ||  
+
|width="80%"|Bob || N
 
|-
 
|-
|Carl ||  
+
|Carl || Y
 
|-
 
|-
|Dave ||  
+
|Dave || Y
 
|-
 
|-
|Phil ||  
+
|Phil || Y
 
|-
 
|-
|Naci ||   
+
|Naci ||  N
 
|-
 
|-
|Larry||  
+
|Larry|| Y
 
|-
 
|-
|Amy||  
+
|Amy|| R
 
|-
 
|-
|Kate||  
+
|Kate|| Y
 
|-
 
|-
|Angel||  
+
|Angel|| Y
 
|-
 
|-
|Brad||  
+
|Brad|| Y
 
|-
 
|-
|Valentin||  
+
|Valentin || Y
 
|-
 
|-
|Gary||  
+
|Gary|| Y
 
|}
 
|}
 
|
 
|
 
{| border="1"
 
{| border="1"
 
|+ Friends
 
|+ Friends
|width="80%"|Nick ||  
+
|width="80%"|Nick || Y
 
|-
 
|-
 
|Gilbert ||  
 
|Gilbert ||  
Line 67: Line 67:
 
|}
 
|}
  
=== Announcements And Reports ===
+
<small>Note: feel free to correct any errors/omissions in above attendance record.</small>
  
 +
=== Announcements And Special Reports ===
  
* JEE Meeting Report:
+
<googlecalendar width="640" height="400" title="WTP Calendar">23u09qluqisen61r5r585ke1uc@group.calendar.google.com</googlecalendar>
WTP support for Java EE 5 modules in a 1.4 level EAR is too big to contain in a maintenance release- will be a line item for WTP 3.1.
+
There will be more meetings about this, agenda/minutes will be posted on the wiki.
+
Next Meeting: July 24, 2008 at 11 am EDT
+
  
::Minutes: Minutes of JEE Meeting will be posted soon, as well as call-in info for next call. The topic will be planning for WTP 3.1.
+
== WTP 3.0.1 ==
  
===Focus on Requirements Planning (Raghu)===
+
*[[WTP 3.0.x Maintenance Schedule]]
  
[http://dev.eclipse.org/mhonarc/lists/wtp-dev/msg06260.html Call for Planning participation]
+
* Smoketest request issued, please complete smoketest by 3 PM Friday, <b>at latest</b>
  
== WTP 2.0.3 ==
+
*: [[WTP Smoke Test Results R30 072408]]
  
* Formally Released, but I still need to announce, update meta-data
+
=== Bug Lists for 3.0.1 ===
 +
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=target_milestone&type0-0-0=nowords&value0-0-0=1.5.5 Blockers & Criticals] (~12!)
  
== WTP 3.0 ==
+
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=hotbug&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= All 3.0.1 Hotbugs] (~1)
* Great Discussion last week, thanks! Please proof read and see if your comments and suggestions were captured.
+
* [[Team_thoughts_on_continuous_improvement_30 | WTP 3.0 continuous improvements]]
+
  
== WTP 3.0.1 ==
+
:[https://bugs.eclipse.org/bugs/buglist.cgi?bug_file_loc=&bug_file_loc_type=allwordssubstr&bug_id=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bugidtype=include&chfieldfrom=&chfieldto=Now&chfieldvalue=&classification=WebTools&email1=&email2=&emailtype1=substring&emailtype2=substring&field-1-0-0=classification&field-1-1-0=product&field-1-2-0=target_milestone&field-1-3-0=bug_status&field0-0-0=noop&keywords=&keywords_type=allwords&long_desc=&long_desc_type=allwordssubstr&product=Dali%20JPA%20Tools&product=Java%20Server%20Faces&product=Web%20Tools&query_format=advanced&remaction=&short_desc=&short_desc_type=allwordssubstr&status_whiteboard=&status_whiteboard_type=allwordssubstr&target_milestone=2.0.1&target_milestone=3.0.1&type-1-0-0=anyexact&type-1-1-0=anyexact&type-1-2-0=anyexact&type-1-3-0=anyexact&type0-0-0=noop&value-1-0-0=WebTools&value-1-1-0=Dali%20JPA%20Tools%2CJava%20Server%20Faces%2CWeb%20Tools&value-1-2-0=2.0.1%2C3.0.1&value-1-3-0=UNCONFIRMED%2CNEW%2CASSIGNED%2CREOPENED&value0-0-0=&votes=&order=bugs.target_milestone%2Cbugs.delta_ts%2Cmap_components.name%2Cbugs.target_milestone%2Cbugs.creation_ts%2Cbugs.bug_severity%2Cbugs.target_milestone%2Cbugs.bug_severity%2Cbugs.priority%2Cbugs.priority%2Cbugs.bug_severity%2Cbugs.bug_severity%2Cmap_assigned_to.login_name%2Cbugs.delta_ts%2Cbugs.status_whiteboard%2Cbugs.target_milestone%2Cbugs.target_milestone%2Cmap_components.name%2Cbugs.votes%2Cbugs.bug_id&query_based_on= Current 3.0.1 & 2.0.1 targeted bugs] (~90!)
  
*[[WTP_3.0.x_Maintenace_Schedule]]
+
:In tabular form:
 +
:[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=priority&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=target_milestone&type0-0-0=anywords&value0-0-0=2.0.1+3.0.1 Current 3.0.1 & 2.0.1 targeted bugs] (~90!)
  
<googlecalendar>23u09qluqisen61r5r585ke1uc@group.calendar.google.com</googlecalendar>
 
  
* Smoketest request issued, please complete smoketest by 3 PM Friday, <b>at latest</b>
+
Fixed Bugs
 +
:WOW! Congratulations!
  
*: [http://build.eclipse.org/webtools/committers/wtp-R3.0-M/20080717094056/M-3.0.1-20080717094056/ Current Candidate Build]
+
: Web Tools
 +
::[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&resolution=FIXED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=product&type0-0-0=anywordssubstr&value0-0-0=Web+Tools&field0-1-0=target_milestone&type0-1-0=substring&value0-1-0=3.0.1 Number Fixed for 3.0.1] (~212!)
  
*: [http://wiki.eclipse.org/WTP_Smoke_Test_Results_R30_071709 Smoketest]
+
:Java Server Faces
 +
::[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=product&type0-0-0=substring&value0-0-0=Java+Server+Faces&field0-1-0=target_milestone&type0-1-0=substring&value0-1-0=3.0.1 Number Fixed for 3.0.1] (~1?)
  
=== Bug Lists for 3.0.1 ===
+
:Dali JPA Tools
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= 3.0.1 Blockers & Criticals] (~4!)
+
::[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=component&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&resolution=FIXED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=product&type0-0-0=substring&value0-0-0=Dali+JPA+Tools&field0-1-0=target_milestone&type0-1-0=substring&value0-1-0=2.0.1 Number Fixed for 2.0.1] (~27!)
 
+
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=hotbug&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= All 3.0.1 Hotbugs] (~0)
+
 
+
:[https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=3.0.1&target_milestone=3.0.1&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= Current 3.0.1 targeted bugs] (~255)
+
  
 
*Minutes:
 
*Minutes:
  
 
== WTP 3.1 ==  
 
== WTP 3.1 ==  
 +
 +
=== Planning ===
 +
 +
[[WTP 3.1 Project Plan]]
 +
 +
 +
Minutes:
 +
 +
Two issues came up when discussing the planning process
 +
 +
# How to handle "future" milestone target? Turns out we have discussed and documented this before, see [[WTP_Bugs, Workflow and Conventions#The meaning of "Future" milestone target]].
 +
# How can we better incorporate bugs-to-fix in 3.1 planning? Subsequent to meeting, I suggested that leads/committers should set the 3.1 milestone target for bugs that ideally should be fixed in 3.1, to help "prime the pot". For example, nearly all voted on bugs and "major" bugs should be so marked. I've added more bugzilla queries to [[WTP 3.1 Project Plan]] to assist.
  
 
=== Schedule ===
 
=== Schedule ===
  
* Adjusted schedule, based on [http://dev.eclipse.org/mhonarc/lists/cross-project-issues-dev/msg02686.html Platform's proposed schedule].
+
Adjusted schedule, based on [http://dev.eclipse.org/mhonarc/lists/cross-project-issues-dev/msg02686.html Platform's proposed schedule].
  
::3.0.1  Maintenance Release Aug 15
+
Normally, our milestone are one week after the Platform's delivery. Exceptions noted below.
::M1  -> Aug 18
+
 
::3.0.2  Maintenance Release Sep 24
+
::3.0.1  Early Maintenance Release Aug 15
::M2  -> Sep 26
+
::M1  -> Aug 22 (extra week added so not to overlap maintenance release)
::M3  -> Nov  7
+
::3.0.2  Coordinated Maintenance Release Sep 24
 +
::M2  -> Oct  3 (extra week added so not to overlap maintenance release)
 +
::M3  -> Nov  7 (short milestone, since "making up" for added week above)
 
::M4  -> Dec 19
 
::M4  -> Dec 19
 
::M5  -> Feb  6
 
::M5  -> Feb  6
::3.0.3  Maintenance Release Feb 25   
+
::3.0.3  Coordinated Maintenance Release Feb 25   
 
::(EclipseCon March 23-27)
 
::(EclipseCon March 23-27)
 
::M6  -> Mar 20 Feature Complete, API Freeze, UI Freeze, NLS, Accessibility
 
::M6  -> Mar 20 Feature Complete, API Freeze, UI Freeze, NLS, Accessibility
 
::M7  -> May  8 Performance tuning, documentation, bug fixing
 
::M7  -> May  8 Performance tuning, documentation, bug fixing
::RC1 -> May 22
+
::RC1 -> May 22 Serious bugs only, focus on stability.
::RC2 -> May 29 WTP will likely not participate in RC2, based on feedback from last year that RC2 came too soon, needed more fixing, less testing
+
::RC2 -> May 29 WTP will likely not participate in an RC2, based on feedback from last year that RC2 came too soon, needed more fixing, less testing
::RC3 -> Jun  5
+
::RC3 -> Jun  5 Very serious bugs only.
::RC4 -> Jun 12
+
::RC4 -> Jun 12 Very very serious bugs only.
::RC5 -> Jun 19
+
::RC5 -> Jun 19 Hopefully no changes from RC4. Prepare web pages, update sites, etc.
 
::GA  -> Jun 24
 
::GA  -> Jun 24
 
== Performance Focus ==
 
 
Can we form a cross-project team?
 
 
Minutes: Following team formed to discuss how to focus on performance, will be lead by Kaloyan. Will meet Monday's, at noon (Eastern time), 9 AM Pacific, 7 PM (EEST?)
 
 
Server
 
        Angel Vera
 
Webservices
 
        Mark Hutchinson
 
Source Editing
 
        Nick Sandonato
 
JEE Tools
 
        Carl Anderson
 
EJB Tools
 
        Kaloyan Raev
 
JSF Tools
 
        Raghu Srinivasan
 
Dali
 
        Neil Hauge
 
releng
 
        David Williams
 
  
 
== Other business ==
 
== Other business ==
Line 165: Line 152:
 
::Click on "[maintain] Project Info meta-data"
 
::Click on "[maintain] Project Info meta-data"
  
:Changes coming to IP Log management (more automated, but more for Project Leads to do?): See http://wiki.eclipse.org/Development_Resources/Automatic_IP_Log
+
:Changes coming to IP Log management (more automated, but more for Project Leads to do?): See [[Development Resources/Automatic IP Log]]
  
 
:In the works: Proposal to adjust bugzilla so bugzilla "products" match our subcomponents (currently have 4, need about 8?)
 
:In the works: Proposal to adjust bugzilla so bugzilla "products" match our subcomponents (currently have 4, need about 8?)
  
 
== Teams Status and Focus for Coming Week ==
 
== Teams Status and Focus for Coming Week ==
 +
 +
==== Performance Team ====
 +
 +
The minutes of the meetings are posted.
 +
Next meeting is next Monday same time. See details on the wiki page:
 +
[[WTP Performance Tests]]
  
 
==== Source Editing ====
 
==== Source Editing ====
Line 183: Line 176:
  
 
==== Java EE ====
 
==== Java EE ====
 +
 +
:[[JEE Status Meetings]]
  
 
==== Dali JPT ====
 
==== Dali JPT ====

Latest revision as of 01:06, 30 July 2008

WTP Development Status Meeting

Attendees

Project Leads
Konstantin Y
Tim Y
Nitin Y
Kathy R
Chuck R
Kaloyan Y
Raghu R
Neil N
David Y
Helen R
Philippe
Committers
Bob N
Carl Y
Dave Y
Phil Y
Naci N
Larry Y
Amy R
Kate Y
Angel Y
Brad Y
Valentin Y
Gary Y
Friends
Nick Y
Gilbert

Note: feel free to correct any errors/omissions in above attendance record.

Announcements And Special Reports

WTP 3.0.1

  • Smoketest request issued, please complete smoketest by 3 PM Friday, at latest

Bug Lists for 3.0.1

Blockers & Criticals (~12!)
All 3.0.1 Hotbugs (~1)
Current 3.0.1 & 2.0.1 targeted bugs (~90!)
In tabular form:
Current 3.0.1 & 2.0.1 targeted bugs (~90!)


Fixed Bugs

WOW! Congratulations!
Web Tools
Number Fixed for 3.0.1 (~212!)
Java Server Faces
Number Fixed for 3.0.1 (~1?)
Dali JPA Tools
Number Fixed for 2.0.1 (~27!)
  • Minutes:

WTP 3.1

Planning

WTP 3.1 Project Plan


Minutes:

Two issues came up when discussing the planning process

  1. How to handle "future" milestone target? Turns out we have discussed and documented this before, see WTP_Bugs, Workflow and Conventions#The meaning of "Future" milestone target.
  2. How can we better incorporate bugs-to-fix in 3.1 planning? Subsequent to meeting, I suggested that leads/committers should set the 3.1 milestone target for bugs that ideally should be fixed in 3.1, to help "prime the pot". For example, nearly all voted on bugs and "major" bugs should be so marked. I've added more bugzilla queries to WTP 3.1 Project Plan to assist.

Schedule

Adjusted schedule, based on Platform's proposed schedule.

Normally, our milestone are one week after the Platform's delivery. Exceptions noted below.

3.0.1 Early Maintenance Release Aug 15
M1 -> Aug 22 (extra week added so not to overlap maintenance release)
3.0.2 Coordinated Maintenance Release Sep 24
M2 -> Oct 3 (extra week added so not to overlap maintenance release)
M3 -> Nov 7 (short milestone, since "making up" for added week above)
M4 -> Dec 19
M5 -> Feb 6
3.0.3 Coordinated Maintenance Release Feb 25
(EclipseCon March 23-27)
M6 -> Mar 20 Feature Complete, API Freeze, UI Freeze, NLS, Accessibility
M7 -> May 8 Performance tuning, documentation, bug fixing
RC1 -> May 22 Serious bugs only, focus on stability.
RC2 -> May 29 WTP will likely not participate in an RC2, based on feedback from last year that RC2 came too soon, needed more fixing, less testing
RC3 -> Jun 5 Very serious bugs only.
RC4 -> Jun 12 Very very serious bugs only.
RC5 -> Jun 19 Hopefully no changes from RC4. Prepare web pages, update sites, etc.
GA -> Jun 24

Other business

Project leads: please fix meta-data during July. Especially, see "information about ..." from your subproject web page left nav bar.
Go to Foundation Portal
Login with committer ID
Click on "[maintain] Project Info meta-data"
Changes coming to IP Log management (more automated, but more for Project Leads to do?): See Development Resources/Automatic IP Log
In the works: Proposal to adjust bugzilla so bugzilla "products" match our subcomponents (currently have 4, need about 8?)

Teams Status and Focus for Coming Week

Performance Team

The minutes of the meetings are posted. Next meeting is next Monday same time. See details on the wiki page: WTP Performance Tests

Source Editing

  • Ongoing triaging of incoming bug reports
  • Working on updating bug backlogs
  • Triaging remaining 3.0 requirements and targeted bugs

Server Tools

Web Services/WSDL

  1. Ongoing triage of incoming and existing bugs.
  2. Fixing and verifying bugs.

Java EE

JEE Status Meetings

Dali JPT

  • JPT 2.0
    • Working on:
      • EclipseLink support
      • Bugs for M7
      • Performance

JSF

  • Feature exceptions
  • Bug Fixes

releng

  • triage/planning

References

In general, the minimum requirement is that if you branch a plug-in, you need to branch all the plug-ins in the corresponding map file. This is to make it easier for others to know what to load, to "be current" in a maintenance branch. It is fine to branch everything in a sub-project if you choose to, but still need to correspond to what's in a map file, and the map file should be updated to explain what it's used for. Map files can be re-organized some, if that helps make it easier to organize and understand what teams are working on what.
The names for branches should follow the pattern of 'R3_0_maintenance'. This will be the name for all 3.0.x maintenance work (not just the first, 3.0.1 maintenance work). Note that JSF and JPA code may use R2_0_maintenance, but their map files, will still be branched using R3_0_maintenance.
  • Instructions for tagging existing and new WTP wiki pages can be found at WTP's Category page; remember, we can create subcategories as well
  • This Week's Smoke Test Results
WTP Smoke Test Results R30
Information about process for milestone bugzilla line item planning has been added to the WTP Bugs, Workflow, and Conventions document.
PMC Candidate Review Request Checklist - See the updated PMC Review document with attention to the "How To Prepare a PMC Defect Candidate" section
Adopter Migration Information for WTP 2.0 - Please add any details for your component.
  • Website
Documentation on Setting up your system for Web Tools Web site development and Using Web Tools Phoenix PHP templates is on the wiki at Web Tools Web Site Development.
  • Bug Day
Monitor and participate in Bug Day if you would like.
Mark any applicable bugs with keyword "bugday", but only if you'll have a representative on hand to respond through Bugzilla or in IRC
Current WTP Bug Day bugs (~53)

Copyright © Eclipse Foundation, Inc. All Rights Reserved.