Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "WTP 2007-11-29"
(→WTP 3.0 M4) |
(→WTP 3.0 M3) |
||
Line 72: | Line 72: | ||
::[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=assigned_to&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=---&target_milestone=1.0.2&target_milestone=2.0.2+M202&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=RESOLVED&resolution=FIXED&resolution=INVALID&resolution=WONTFIX&resolution=DUPLICATE&resolution=WORKSFORME&resolution=MOVED&resolution=---&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= 2.0.2 Resolved, Unverified Blockers/Criticals] (~20) By Assignee | ::[https://bugs.eclipse.org/bugs/report.cgi?x_axis_field=bug_severity&y_axis_field=assigned_to&z_axis_field=&query_format=report-table&short_desc_type=allwordssubstr&short_desc=&classification=WebTools&product=Dali+JPA+Tools&product=Java+Server+Faces&product=Web+Tools&target_milestone=---&target_milestone=1.0.2&target_milestone=2.0.2+M202&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=RESOLVED&resolution=FIXED&resolution=INVALID&resolution=WONTFIX&resolution=DUPLICATE&resolution=WORKSFORME&resolution=MOVED&resolution=---&bug_severity=blocker&bug_severity=critical&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&format=table&action=wrap&field0-0-0=noop&type0-0-0=noop&value0-0-0= 2.0.2 Resolved, Unverified Blockers/Criticals] (~20) By Assignee | ||
− | === WTP 3.0 | + | === WTP 3.0 M4 === |
:*M4 Schedule | :*M4 Schedule | ||
Line 81: | Line 81: | ||
::: 10/31 I-build code in | ::: 10/31 I-build code in | ||
::: 01/01 S-build code in | ::: 01/01 S-build code in | ||
− | |||
− | |||
:*Builds | :*Builds |
Revision as of 12:29, 29 November 2007
Contents
WTP Development Status Meeting 2007-11-29
Attendees
Announcements And Reports
- Eclipse DemoCamp
- EclipseCon 2008 submissions due November 19th
- I have suggested two "virtual teams" to focus on two series of tutorials:
- How to extend WTP (Konstantin, Nitin, Chuck, Kaloyan)
- How to use WTP (Jason, Kathy, Naci, Neil, Raghu)
- My note and invitation on newsgroup applies to all committers as well!
Action Items For Project Leads
- Primary website Landing Page needs new Projects. See bug 201331.
Bob: EJB still outstanding, will contact Naci, will move on to complete project David: incubator project still needed
Focus on Backlog and Quality metrics (Neil)
Neil: Untargeted Enhancement is still the focus
- Current Focus Item:
- Untargeted Enhancements opened before January 1st, 2007 (Last week - 170; Currently ~ 127)
- Options are
- Invalid - Enhancement does not fit with the scope of the project or is already implemented.
- helpwanted keyword - This is a valid request, but due to committer resources and other priorities, outside help will be needed to make this happen.
- Future - I would use this in conjunction with the helpwanted keyword. I use this for legitimate requests that are important but will not make any planned release, but likely will make a future release.
- Upcoming Focus Item:
- Untargeted bugs with patches attached opened before January 1st, 2007 (Last week - 40; Currently ~ 38)
- Past Focus Items:
- Untargeted severity "Major" and higher bugs opened before January 1st, 2007 (Last week - 2; Currently ~ 0)
Focus on Requirements Planning (Raghu)
Raghu: Common now has committed items. Focus on untargeted enhancements, recent enhancements still in the inbox
- Complete Next Draft of WTP 3.0 Plan 10/10 (or 10/12)
- Projects with no committed items: Common, JPA, Server Tools
- Projects with no update for M3: Common, Server Tools
- Please update status page
- Untriaged Enhancement Requests (~22)
- Plan items in Bugzilla (~42)
WTP 2.0.2
- Schedule - Details...
- Bug Lists
- All Remaining 2.0.2 Targeted Bugs (~56)
- 2.0.2 Hot Bug Requests (~0)
- 2.0.2 Hot Bugs (~1)
- 2.0.2 Bugs for PMC Approval (~0)
- 2.0.2 Untargeted Blockers/Criticals (~0)
- 2.0.2 Blockers/Criticals (~0)
- 2.0.2 Total JST, WST, JSF Bugs Fixed (~56)
- 2.0.2 Dali Total Bugs Fixed (~2)
- 2.0.2 Resolved, Unverified Blockers/Criticals (~20) By Assignee
WTP 3.0 M4
- M4 Schedule
- our +2 date: January 7, Wednesday,
- Final Code released by January 1
- 10/24 I-build code in
- 10/31 I-build code in
- 01/01 S-build code in
- Builds
- Junit failures? none
- Bug Lists
- 3.0 Invalid Targeted Bugs (~0)
- 3.0 M3 Targeted Bugzilla Enhancements (~0)
- All Remaining 3.0 Targeted Enhancements (~196)
- 3.0 M3 Remaining Targeted Bugs (~6)
- 3.0 M3 Hot Bug Requests (~0)
- 3.0 M3 Hot Bugs (~1)
- 3.0 M3 Blockers/Criticals (~0)
- 3.0 M3 JST, WST, JSF Bugs Fixed (~105)
- 3.0 M3 JPT Dali Bugs Fixed (~1)
- 3.0 Untargeted Blockers/Criticals (~0)
- 3.0 Resolved, Unverified Blockers/Criticals (~25) By Assignee
Other business?
- ?