Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "UIBPWG071031"

Line 1: Line 1:
 
=== Attending ===
 
=== Attending ===
 +
Mik, Neil, Kim, Jeff, Kevin
 
=== Review position of group to planning council ===
 
=== Review position of group to planning council ===
 
We want to have two deliverables for the planning council.
 
We want to have two deliverables for the planning council.
Line 5: Line 6:
 
* an actionable developer checklist of about 10 items
 
* an actionable developer checklist of about 10 items
 
=== Next steps ===
 
=== Next steps ===
 +
Mik to take lead on the checklist.  List will be ordered by a short list of "Guiding Principles".  Kevin to review.
 +
Items must be:
 +
* relevant (we see this problem a lot)
 +
* actionable (clear what to do)
 +
* doable (not extraordinarily expensive)
 
=== Next call ===
 
=== Next call ===
 
The next meeting will be at 10:00 PDT / 17:00 UTC on October 31st.
 
The next meeting will be at 10:00 PDT / 17:00 UTC on October 31st.

Revision as of 13:28, 31 October 2007

Attending

Mik, Neil, Kim, Jeff, Kevin

Review position of group to planning council

We want to have two deliverables for the planning council.

  • a top ten list of UI guiding principles
  • an actionable developer checklist of about 10 items

Next steps

Mik to take lead on the checklist. List will be ordered by a short list of "Guiding Principles". Kevin to review. Items must be:

  • relevant (we see this problem a lot)
  • actionable (clear what to do)
  • doable (not extraordinarily expensive)

Next call

The next meeting will be at 10:00 PDT / 17:00 UTC on October 31st.

Back to the top