Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Trace Compass/Project Meetings/2016-03-18"
(→Introduction from Robert Kiss) |
(→API Cleanup for Neon) |
||
Line 15: | Line 15: | ||
=== API Cleanup for Neon === | === API Cleanup for Neon === | ||
+ | |||
+ | * Internalize CFV, RV | ||
+ | * Internalize XML model package | ||
+ | |||
=== Introduction from Robert Kiss === | === Introduction from Robert Kiss === | ||
Revision as of 11:44, 18 March 2016
Contents
Hangout
URL of the meeting: https://hangouts.google.com/call/nmsqz3xnlvgcrontheppepipmie
Agenda
Go over the AIs of the previous meeting
Summary of the meeting about Project View modifications
- Meeting was scheduled and done
- Following the discussions and feedback, a new proposal was added to the Design Documents.
Summary of EclipseCon
API Cleanup for Neon
- Internalize CFV, RV
- Internalize XML model package
Introduction from Robert Kiss
We all presented ourselves.