Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Tigerstripe Release Notes

< To: Tigerstripe

The team working on Tigerstripe uses an agile process to work towards a release. Each release is typically made up of 5-6 iterations and each iteration is three weeks long.

The following are the list of defect/enhancements that have been addressed for each iteration:

Note: Not all the defects required code changes.  Some of them were marked as duplicates or they've already been fixed in the past.  However, everything has been listed to indicate what we've looked into.

Back to the top