Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Testing Process Part 1 Draft 2 Comments"

(Paul Slauenwhite)
 
(3 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Jonathan West ==
 
 
 
Here are my section 5 comments, as requested:
 
 
BTW, 5.1 section has a typo, should read the 'JVMPI tests' rather than the 'JVMTI' tests.
 
 
 
'''5.2 JVMTI Profiler Test Suites''':
 
 
Like the JVMPI Profiler tests, the JVMTI profiler tests are run like regular JUnit tests, but require manual configuration of a local configuration file. Unlike the JVMPI tests, it is not required to install a test server on the remote machine, or to edit remote configuration files, as these functions are now fully integrated into the local test installation.
 
 
 
'''5.3 Platform.Communication.Control.Channel.Test automated test''':
 
 
The control channel tests are run like a regular jUnit test, with test execution being fully automated. The jUnit test will connect to the remote hosts being tested, configure the environment, run the test, and compare the results from the hosts. Presently, z/OS on zSeries and AS400 are not supported.  Execution results must still be generated manually.
 
 
 
''''5.4 Platform.Communication.Request.Peer.Monitor automated test'''
 
 
While request peer monitoring is still a manual test, it is a tool-assisted manual test, meaning that through automation of installation, configuration, and execution, the total test run time is reduced by about 80% versus a fully-manual run. Execution results must still be generated manually. z/OS on zSeries and AS400 are not supported.
 
 
--[[User:Jgwest.ca.ibm.com|Jgwest.ca.ibm.com]] 11:59, 29 November 2007 (EST)
 
 
 
 
 
== Paul Slauenwhite ==
 
== Paul Slauenwhite ==
  
 
* Can we change the organization to (note new sections):
 
* Can we change the organization to (note new sections):
1.0 Preparation
+
** 1.0 Preparation
  1.1 Install the TPTP Test Tools
+
*** 1.1 Install the TPTP Test Tools
  1.2 Extracting the Test Resources
+
*** 1.2 Extracting the Test Resources
  1.3 Structure of the Test Resources
+
*** 1.3 Structure of the Test Resources
2.0 Creating Tests
+
** 2.0 Creating Tests
  2.1 Manual Test Suites
+
*** 2.1 Manual Test Suites
  2.2 JUnit and JUnit Plug-in Test Suites
+
*** 2.2 JUnit and JUnit Plug-in Test Suites
  2.3 AGR Test Suites
+
*** 2.3 AGR Test Suites
3.0 Executing Tests
+
** 3.0 Executing Tests
  3.1 Manual Test Suites
+
*** 3.1 Manual Test Suites
  3.2 JUnit and JUnit Plug-in Test Suites
+
*** 3.2 JUnit and JUnit Plug-in Test Suites
  3.3 AGR Test Suites
+
*** 3.3 AGR Test Suites
4.0 Common Tasks
+
** 4.0 Common Tasks
  4.1 Launching Test Suites
+
*** 4.1 Creating Test Suites
  4.2 Viewing Test Logs
+
*** 4.2 Launching Test Suites
  4.3 Report Test Results
+
*** 4.3 Viewing Test Logs
5.0 References
+
*** 4.4 Report Test Results
 +
** 5.0 Help
 
* We need to document the BVT process:
 
* We need to document the BVT process:
 
** The [http://dev.eclipse.org/viewcvs/index.cgi/test-results/platform/org.eclipse.hyades.tests/BVT/?root=TPTP_Project root-level test suites for BVTs].   
 
** The [http://dev.eclipse.org/viewcvs/index.cgi/test-results/platform/org.eclipse.hyades.tests/BVT/?root=TPTP_Project root-level test suites for BVTs].   
Line 58: Line 33:
 
** 2) "beginning of each test pass, test report generation, etc.".
 
** 2) "beginning of each test pass, test report generation, etc.".
 
* 1.3:  
 
* 1.3:  
 +
** Remove steps 1, 2, and 4.
 +
** Move step 3 to the new 4.2 section. 
 +
** Remove white space after step 6.
 +
** In step 5, change Client to View.
 +
** In the verdict table, add an note on adding defects to the test log (see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/t_submitting_defects.html), remove the second sentence in the fail verdict explanation, and add a note to provide comments explaining the verdict (e.g. fail and inconclusive) if applicable.
 +
* 1.4:
 +
** Change plugin to plug-in.
 
** Remove steps 1 and 2.  
 
** Remove steps 1 and 2.  
** Move step 3 to the new 4.1 section.   
+
** Move step 3 to the new 4.2 section. 
* 4.1:
+
** Remove white space after step 4.
 +
** In the verdict table, add an note on adding defects to the test log (see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/t_submitting_defects.html).
 +
* 1.5:
 +
** Remove steps 1 - 3.
 +
** Move steps 4 and 5 to the new 4.2 section.   
 +
** Remove white space after step 6.
 +
** In the verdict table, add an note on adding defects to the test log (see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/t_submitting_defects.html).
 +
* 1.6:
 +
** In step 1, change _results to results and give an example of the structure.
 +
** In step 2, change id to identifier.
 +
* 2.0:
 +
** Move to new 4.1 section.
 +
** In steps 2 and 7, move new section 1.3.
 +
** In step 6, move section from part 2 to here.
 +
* 2.1, 2.2 and 2.3 should contain instructions for creating the specific type of tests.
 +
* 2.3:
 +
** Move 1 a, c, d to new 1.3 section.
 +
** In step b, append ", if applicable".
 +
* 2.4:
 +
** Need more content here about what is expected from developers for BVT (e.g. all tests in the root level BVT test suites are ran every build and it is expected that developers will test locally before checking into CVS).
 +
* 3.0 and 4.0:
 +
** Integrate into one Help section with:
 +
**** TPTP web site
 +
**** Point to TPTP Test Tools documentation (Help >> Help Contents >> Testing Applications).
 +
**** AGR documentation.
 +
**** TPTP consumers documentation (http://www.eclipse.org/tptp/home/documents/extenders.php).
 +
**** Mailing list and news group (http://www.eclipse.org/tptp/home/project_info/general/mailnews.php).
 +
* New 4.2 section:
 
** The follow steps are common for launching all types of test suites
 
** The follow steps are common for launching all types of test suites
*** Create a new test deploymnet:
+
*** Create a new local test deployment:
**** (add steps - see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/tdeploymentintro.htm)
+
**** (add steps - see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/tdeploymentintro.htm, note the distinction between locations and workbench locations).
 +
*** Create a new remote test deployment:
 +
**** (add steps - see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/tdeploymentintro.htm, note the distinction between locations and workbench locations).
 
*** Create a test launch configuration:
 
*** Create a test launch configuration:
 
**** (add steps - see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/trunningmanualtestsuite.htm)
 
**** (add steps - see http://help.eclipse.org/help33/topic/org.eclipse.hyades.test.doc.user/tasks/trunningmanualtestsuite.htm)
 
**** Choose the results folder associated with the selected test suite and deployment platform
 
**** Choose the results folder associated with the selected test suite and deployment platform
 
Note: The name and directory structure containing the generated execution history file MUST be the same as it will be in CVS in order for generated reports to work correctly.
 
Note: The name and directory structure containing the generated execution history file MUST be the same as it will be in CVS in order for generated reports to work correctly.

Latest revision as of 10:19, 3 December 2007

Paul Slauenwhite

  • Can we change the organization to (note new sections):
    • 1.0 Preparation
      • 1.1 Install the TPTP Test Tools
      • 1.2 Extracting the Test Resources
      • 1.3 Structure of the Test Resources
    • 2.0 Creating Tests
      • 2.1 Manual Test Suites
      • 2.2 JUnit and JUnit Plug-in Test Suites
      • 2.3 AGR Test Suites
    • 3.0 Executing Tests
      • 3.1 Manual Test Suites
      • 3.2 JUnit and JUnit Plug-in Test Suites
      • 3.3 AGR Test Suites
    • 4.0 Common Tasks
      • 4.1 Creating Test Suites
      • 4.2 Launching Test Suites
      • 4.3 Viewing Test Logs
      • 4.4 Report Test Results
    • 5.0 Help
  • We need to document the BVT process:
    • The root-level test suites for BVTs.
    • The test infrastructure will execute the org.eclipse.hyades.tests/AllBVT<test type>Tests.testsuite test suites.
    • We do not need to check-in the execution results to CVS due to disk space limitations and polluting of our test pass results.
    • Each developer can rerun the automated tests to reproduce a failure.
  • We need to add the new structure in CVS, which now to three sets of root level test suites in the TP1, TP2, BVT directories.
  • 1.1:
    • "1. Open the TPTP download site (embedded link to http://www.eclipse.org/tptp/home/downloads/)."
    • "2. Select the release of TPTP to be tested and download...". Capitalize Remember in the note. AGR is now an as-is component (not Technology Preview).
  • 1.2:
    • i) "for that subproject".
    • 2) "beginning of each test pass, test report generation, etc.".
  • 1.3:
  • 1.4:
  • 1.5:
  • 1.6:
    • In step 1, change _results to results and give an example of the structure.
    • In step 2, change id to identifier.
  • 2.0:
    • Move to new 4.1 section.
    • In steps 2 and 7, move new section 1.3.
    • In step 6, move section from part 2 to here.
  • 2.1, 2.2 and 2.3 should contain instructions for creating the specific type of tests.
  • 2.3:
    • Move 1 a, c, d to new 1.3 section.
    • In step b, append ", if applicable".
  • 2.4:
    • Need more content here about what is expected from developers for BVT (e.g. all tests in the root level BVT test suites are ran every build and it is expected that developers will test locally before checking into CVS).
  • 3.0 and 4.0:
  • New 4.2 section:

Note: The name and directory structure containing the generated execution history file MUST be the same as it will be in CVS in order for generated reports to work correctly.

Back to the top