Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-AG-20080331"

m (Minutes)
 
(5 intermediate revisions by 2 users not shown)
Line 29: Line 29:
 
* P1 Enhancements:
 
* P1 Enhancements:
 
** Deferring to I7:
 
** Deferring to I7:
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165409 IPv6 support]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165409 IPv6 support]: Containable in I7.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200351 Improvements in build process]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200351 Improvements in build process]: Plan to complete in I7.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=206875 OpenSSL (pending legal approval)]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=206875 OpenSSL (pending legal approval)]: CQ was originally denied and IBM Legal is checking if we can prereq OpenSSL instead.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200320 Add contention analysis]: Containable in I7.
 
** Deferring to Future:
 
** Deferring to Future:
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=147061 Dynamic Discovery]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=147061 Dynamic Discovery]: Requested by IBM consuming product.  Converted from a defect to an enhancement too late in the release.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=196744 Standalone data collection]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=196744 Standalone data collection]: Not containable due to lack of resources.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=190820 Recursively accumulated sizes in memory profiling]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=190820 Recursively accumulated sizes in memory profiling]: Not containable due to lack of resources.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200264 Predefined profiling filters]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200264 Predefined profiling filters]: Not containable due to lack of resources.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200320 Add contention analysis]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200499 Order of filter execution]: Not containable due to lack of resources.
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=200499 Order of filter execution]
+
 
 +
* P1 Defects:
 +
** Deferring to I7:
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=222998 Reattach from WB with JVMPI profiler failed to collect data.]: Blocker defect that cannot be contained in I6 due to insufficient resources.  There is no work-around.  Paul has opposition to deferring a blocking defect with no work-around but there are no resources to resolve the defect.
 +
** Candidates for I6:
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=222998 Reattach from WB with JVMPI profiler failed to collect data.]: Fix is ready.  Requesting PMC approval.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=208394 Exceptions when opening the Platform documentation.]: Fix is ready.  Requesting PMC approval.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=224918 Changing sorting order in the log view on an rdb resource takes a long time]: Fix is ready.  Requesting PMC approval.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=224317 [CGProf] inconsistent data for execution profiling with full details]: Fix is ready.  Requesting PMC approval.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=140650 [PII] Missing shortcut keys in TPTP profiling context menu]: Fix underway.
 +
 
 +
* IPv6 and Java 6 support are required by IBM in I7.
  
 
=== Test Project ===
 
=== Test Project ===
 +
 
* P1 Enhancement:
 
* P1 Enhancement:
 
** Deferring to I7:
 
** Deferring to I7:
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=166025 Move, Copy, Delete, Rename and Import/Export test assets.]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=166025 Move, Copy, Delete, Rename and Import/Export test assets.]: Code complete with test cases/documentation outstanding.
 
* P2 Enhancement:
 
* P2 Enhancement:
 
** Deferring to I7:
 
** Deferring to I7:
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=133099 Providing the ability to record user's interactions with GEF objects in a GEF editor]
+
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=133099 Providing the ability to record user's interactions with GEF objects in a GEF editor]: PMC approved.
 
* P1 Defects:
 
* P1 Defects:
 
** Deferring to Future:
 
** Deferring to Future:
Line 73: Line 86:
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=220875 Fix spelling/broken links/accessibility errors in JUnit Plugin/Manual Test/BIRT Reports plug-ins.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=220875 Fix spelling/broken links/accessibility errors in JUnit Plugin/Manual Test/BIRT Reports plug-ins.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=145070 (Product) Test Log Viewer: Link to deployment is displayed when using temp deploy not named 'default']
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=145070 (Product) Test Log Viewer: Link to deployment is displayed when using temp deploy not named 'default']
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=218779 Test Tools documentation I5 smoke test failures.]
 
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=220551 Removing an Artifact Location Pair returns a Null Pointer Exception]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=220551 Removing an Artifact Location Pair returns a Null Pointer Exception]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=151922 (Usability) Hyperlinks in Test Log view are rendered differently for the Test Execution event type.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=151922 (Usability) Hyperlinks in Test Log view are rendered differently for the Test Execution event type.]
Line 96: Line 108:
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=216812 Deprecate JScrib and JScrib report generators.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=216812 Deprecate JScrib and JScrib report generators.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=219595 Test.Execution.JUnitRunner.testsuite and Test.Execution.JUnitRunner.Bug186196.testsuite are failing.]
 
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=219595 Test.Execution.JUnitRunner.testsuite and Test.Execution.JUnitRunner.Bug186196.testsuite are failing.]
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=218779 Test Tools documentation I5/I6 smoke test failures.]
  
 
=== Trace Project ===
 
=== Trace Project ===
 +
 +
* P1 Enhancements:
 +
** Deferring to I7:
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=816692 (Tech Preview) Add per thread execution time, cycles and instructions]: IBM resource issue with Richard.
 +
 +
* P1 Defects:
 +
** Deferring to I7:
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=212009 Upgrade ARM agent to the new AC execution framework]: Moving from Joe to Richard and there is an IBM resource issue since Matt left IBM.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=205821 For Java 5 and above ARM needs to use TI agent and not the PI agent]: Dependant [https://bugs.eclipse.org/bugs/show_bug.cgi?id=212009 212009]
 +
 +
=== Monitoring Project ===
 +
 +
* P1 Defects:
 +
** Deferring to I7:
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=201084 201084]: Resources available.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=210266 Remove any references to WSDMTooling from the TPTP web site and bugzilla]: Resources available.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=220866 Ensure backward compatibility for the Log Analyzer components when updating via update manager]: Resources available.
 +
*** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=224102 Untranslated string in UI.]: Resources available.
  
 
== Questions/Answers ==
 
== Questions/Answers ==
  
* '''Q:'''  
+
* '''Q:''' Can we merge I6 TP1 and TP2?
* '''A:'''  
+
* '''A:''' We will merge I6 TP1 and TP2 (target: April 4).
 +
 
 +
* '''Q:''' What are the final translation dates?
 +
* '''A:''' April 7 is PII freeze.  Emergency drops on April 21 and during TVT (May 9 - 30).
  
 
== Action Items ==
 
== Action Items ==
  
*
+
* Joanna, Alex A., Alex N. will prepare a list of candidate defects to be deferred to future.

Latest revision as of 13:29, 31 March 2008

Date

  • March 31, 2008

Attendees

  • Present:
    • Eugene Chan
    • Tony Wang
    • Alex Nan
    • Duwayne Morris
    • Oliver Cole
    • Kent Siefkes
    • Mikhail Loenko
    • Alexander Alexeev
    • Chris Elford
    • Mikhail Voronin
    • Joanna Kubasta
    • Joel Cayne

Topic

  • 4.5 Deferred Enhancements and Defects

Minutes

Platform Project

  • IPv6 and Java 6 support are required by IBM in I7.

Test Project

Trace Project

Monitoring Project

Questions/Answers

  • Q: Can we merge I6 TP1 and TP2?
  • A: We will merge I6 TP1 and TP2 (target: April 4).
  • Q: What are the final translation dates?
  • A: April 7 is PII freeze. Emergency drops on April 21 and during TVT (May 9 - 30).

Action Items

  • Joanna, Alex A., Alex N. will prepare a list of candidate defects to be deferred to future.

Back to the top