Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TM/Meetings/8-Jan-2013"

< TM‎ | Meetings
m
 
Line 61: Line 61:
 
* Tuesday [[TM/Meetings/5-Feb-2013]] (4 weeks)
 
* Tuesday [[TM/Meetings/5-Feb-2013]] (4 weeks)
  
<!--
 
 
== Minutes ==
 
== Minutes ==
 +
* Anna - Maven jar signing plugin is still at 1.0. 1.0.2 is still not public. No response has been received for the bug she has filed. This is not an urgent item. TCF is still using 1.0 as well.
 +
* DaveD - No web site updates have been done as yet, will be done before M5.
 +
* There is still no pressing need to fork 3.4.2 maintenance prior to Juno SR2 delivery.
 +
* DaveD on vacation Feb 18 to Feb 22. Juno SR2 release is at that time, but this is the quiet week so this should not be a problem.
 +
* Anna will be out one of the last weeks of January.
 
=== Notes ===
 
=== Notes ===
 +
None.
 
=== Action Items ===
 
=== Action Items ===
-->
+
* '''All''' Review bug backlogs (Fix target milestones; review / triage incoming high-severity issues)
 +
* '''Anna''' Monitor jar signing plugin
 +
* '''Dave D''' See remaining migration action items below; fix secure storage login for JUnits
 +
** Update Website Docs where they refer to CVS
 +
** Downloads Page - recommend manually editing a downloads page; most smaller projects do this really simple; follow CDT / Linuxtools
 +
** Maybe update the CVS repo putting in a "readme.txt" that project has migrated to git
 +
** Webpages partially out-of-date --&gt; migrate to Wiki; Wayne got something "almost done" that can be auto-generated
  
 
== Info ==
 
== Info ==

Latest revision as of 14:33, 8 January 2013

When

8 January 2013 (Tuesday) at 1600 UTC / 1200pm Toronto
Html.gifcalendar Ical.gifcalendar

Skype: david_dykstal to call martin.oberhuber, david-k-mcknight, xuan.chen886, uwe.stieber, and anna_dushistova. All TM committers and interested parties are invited. Interested parties ping david_dykstal on Skype chat to be added to the call.

Backup dial-in: US & Canada (Toll-Free) 888-426-6840
Austria (Caller Paid) 0-1-2530601
For Other Countries: AT&T Teleconference
Participant Code: 8703125#

Agenda

Action items from TM/Meetings/4-Dec-2012

  • All Review bug backlogs (Fix target milestones; review / triage incoming high-severity issues)
  • Anna Follow up on jar signing plugin
  • Dave D See remaining migration action items below; fix secure storage login for JUnits
    • Update Website Docs where they refer to CVS
    • Downloads Page - recommend manually editing a downloads page; most smaller projects do this really simple; follow CDT / Linuxtools
    • Maybe update the CVS repo putting in a "readme.txt" that project has migrated to git
    • Webpages partially out-of-date --> migrate to Wiki; Wayne got something "almost done" that can be auto-generated
  • Manuel Complete legacy builds

Master branch builds

  • Put Repo information into the plugins ? - Currently building on Tycho 0.15, but 0.16 is available
  • Validate Hudson master build output against what we had, file bugs for anything incomplete
  • Some goodies (eg help index; .api_description; scmurl in MANIFEST.MF) might be missing - not necessarily re-do all of them, but document whats different

Legacy branch builds

3.4.2 (Juno SR2)

  • readiness (SR2 RC builds begin this week, SR2 GA is Feb 22)
  • branch needed yet?

Kepler

  • readiness (Kepler M5 is Feb 4)
  • upcoming items of interest

Web site & wiki maintenance

Bugs

Community

Foundation

Committer status

Vacations

Notes

Next Meeting

Minutes

  • Anna - Maven jar signing plugin is still at 1.0. 1.0.2 is still not public. No response has been received for the bug she has filed. This is not an urgent item. TCF is still using 1.0 as well.
  • DaveD - No web site updates have been done as yet, will be done before M5.
  • There is still no pressing need to fork 3.4.2 maintenance prior to Juno SR2 delivery.
  • DaveD on vacation Feb 18 to Feb 22. Juno SR2 release is at that time, but this is the quiet week so this should not be a problem.
  • Anna will be out one of the last weeks of January.

Notes

None.

Action Items

  • All Review bug backlogs (Fix target milestones; review / triage incoming high-severity issues)
  • Anna Monitor jar signing plugin
  • Dave D See remaining migration action items below; fix secure storage login for JUnits
    • Update Website Docs where they refer to CVS
    • Downloads Page - recommend manually editing a downloads page; most smaller projects do this really simple; follow CDT / Linuxtools
    • Maybe update the CVS repo putting in a "readme.txt" that project has migrated to git
    • Webpages partially out-of-date --> migrate to Wiki; Wayne got something "almost done" that can be auto-generated

Info

  git config --global --list
  git config --global user.email my_committer_email@address.com
  git config --global user.name "John Doe"
  git clone ssh://userid@git.eclipse.org:29418/tm/org.eclipse.tm.git
  #readonly:# git clone git://git.eclipse.org/gitroot/tm/org.eclipse.tm.git
  <make changes>
  "git status" shows changes
  "git diff" shows difference (like patch format)
  git add <filename> -adds a file
  git rm <filename> removes a file
  then git commit -m"message" --to commit into your local repo
  git push -- to push to the remote repository
  • TM/Git_Workflows cheatsheet on Wiki: Get egit, Setup egit, Clone Repo (website / code), Update, Edit, Push, Switch branch

Back to the top