Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Stardust/Release Build Plan/Ramp Down"
(→RC1) |
(→M6) |
||
Line 4: | Line 4: | ||
* API signature frozen | * API signature frozen | ||
* API behaviour frozen with the exception of changes needed to fix potential P1 or P2 bugs | * API behaviour frozen with the exception of changes needed to fix potential P1 or P2 bugs | ||
− | * No features | + | * No features that would result in major GUI changes after M6 |
=== M7 === | === M7 === |
Revision as of 12:24, 18 March 2013
This is the ramp down plan for project Stardust applicable for the 1.0 (Kepler) release and later.
M6
- API signature frozen
- API behaviour frozen with the exception of changes needed to fix potential P1 or P2 bugs
- No features that would result in major GUI changes after M6
M7
- Feature freeze. Changes beyond M7 will only be done to:
- fix important and / low risk bugs
- perform changes or fix issues regarding release or IP policies (such as release numbers, license headers, provider names, etc.)
RC1
- Criteria as for M7
- Additionally after RC1: Another committer from the project must review and vote +1 using Bugzilla