Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "StAC 090115 Minutes"

Line 10: Line 10:
 
* Purpose of this call is to lay the groundwork to start considering efforts and prioritizations and to schedule a follow up call for the week of January 26th.
 
* Purpose of this call is to lay the groundwork to start considering efforts and prioritizations and to schedule a follow up call for the week of January 26th.
 
* Discussion can base on the [[StAC 081028 Minutes]] SWOT analysis of the release train.
 
* Discussion can base on the [[StAC 081028 Minutes]] SWOT analysis of the release train.
 +
 +
== Minutes ==
 +
* Please do not edit during call!

Revision as of 12:57, 15 January 2009

Tentative for 1700 UTC (9am Pacific, noon Eastern) -- Immediately following the Architecture Council monthly meeting.

Dial-in:

(+1) 613.287.8000 (Ottawa and international) or
866.362.7064 (toll-free North America)
passcode 464440#

Agenda

  • The 2009 program plan allocates a budget for the EMO to use towards the theme of “ensuring a great release train” based on advice and prioritization of the StAC (i.e., the three councils).
  • Based on the StAC’s feedback and suggestions, we can fund efforts to help with Galileo, or if timing does not support priorities we can start looking to the 2010 release train. Purely hypothetical examples to show the things we could do include fund a usability study, work on cross project testing, etc.
  • Purpose of this call is to lay the groundwork to start considering efforts and prioritizations and to schedule a follow up call for the week of January 26th.
  • Discussion can base on the StAC 081028 Minutes SWOT analysis of the release train.

Minutes

  • Please do not edit during call!

Back to the top