Skip to main content
Jump to: navigation, search

Difference between revisions of "Sequoyah/Ramp down"

(Bug fixes)
(New features)
Line 9: Line 9:
 
* No new features to 0.5 will be accepted
 
* No new features to 0.5 will be accepted
 
* 0.4 version will be the last version totally compliant with Galileo. If you are using Sequoyah prefer migrate to 0.5.  
 
* 0.4 version will be the last version totally compliant with Galileo. If you are using Sequoyah prefer migrate to 0.5.  
* New features to 0.5 or future, will follow the regular procedure for Sequoyah and should be discussed in the mailing list before the definition of the target version.
+
* New features for future versions will follow the regular discussion process. They should be discussed in the mailing list before the definition of the target version.
  
 
=== Bug fixes ===
 
=== Bug fixes ===

Revision as of 12:48, 27 April 2010

Ramp down for 0.5 Release

  • 0.5 (Helios) was released in 17 March 2010

SVN

  • Branch:

New features

  • No new features to 0.5 will be accepted
  • 0.4 version will be the last version totally compliant with Galileo. If you are using Sequoyah prefer migrate to 0.5.
  • New features for future versions will follow the regular discussion process. They should be discussed in the mailing list before the definition of the target version.

Bug fixes

  • 0.5 releases will accept bug fixes:
    • A P1 or P2 bug
    • blocking or critical
    • major
  • These bugs will be accepted for 3 months (17 June 2010) and a new 0.5.x version will be generated to fix it according to demands.
  • After 17 Jun 2010, any bug should have a committer voting on the bugzilla and should be approved with +1 for all committers.

Back to the top