Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Sequoyah/PhoneMeetings/Agenda11Feb14"

(Agenda)
(Agenda)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
  
 
* Eric Cloninger (Motorola)
 
* Eric Cloninger (Motorola)
* Ruth Soliani (Eldorado)
 
 
* Marcel Gorri (Eldorado)
 
* Marcel Gorri (Eldorado)
 
* Daniel Pastore (Eldorado)
 
* Daniel Pastore (Eldorado)
* Ronnie King (Nokia)
 
* Doug Schaefer (Wind River)
 
* Jon Dearden (RIM)
 
* Paul Beusterien
 
* Werner Keil
 
  
 
== Agenda ==
 
== Agenda ==
Line 16: Line 10:
  
 
* Project Status
 
* Project Status
** Helios SR2  
+
** Helios SR2
 +
*** The recent P2 update for SR2 RC2 caused a break with Pulsar SDK discovery because Pulsar was using a private API.  This has been fixed in P2 and pushed back. 
 +
*** The Pulsar package is complete, tested, and ready to go out with the update.  This should be the final build unless some exception occurs.
 
** Indigo milestones
 
** Indigo milestones
** MTJ participation and impacts on Pulsar EPP
+
*** Requirements for Indigo are tracking according to schedule.  The progress can be viewed online.
** TMW components after Symbian Foundation changes
+
**** http://www.eclipse.org/indigo/planning/EclipseSimultaneousRelease.php
** Other ...
+
**** http://eclipse.org/indigo/planning/SimultaneousReleaseGrid.php?projectid=dsdp
 +
*** Resolved a dependency issue with CDT, which is moving to version 8.0 for Indigo.
 +
*** We need to get permission to remove several examples from the Sequoyah project for Indigo. These components are not used and should not be part of the release.
 +
*** The CQ deadline is approaching, but Sequoyah does not need to file any new CQs.
 +
* Pulsar handoff
 +
** Eric is continuing to have a discussion with Ian Skerrett on this, but it appears that there will not be anyone taking up the task of maintaining Pulsar EPP.
 
* Events
 
* Events
** EclipseCon submission(s)
+
** EclipseCon - Eric will be attending most likely
** PluginFest
+
** PluginFest - postponed for now
 +
* Migration to Tools project
 +
** Eric to talk with Wayne Beaton and Matt Ward
 +
** There are a lot of small tasks that we need to make to get this done for Indigo, which will require exceptions.
 +
** Matt wants to do this on 21 Feb 2011  https://bugs.eclipse.org/bugs/show_bug.cgi?id=326582
 +
* Google Summer of Code
 +
** Marcel has a proposal for PDE support based on the Sequoyah Localization Files Editor and will send an email to sequoyah-dev
 +
** http://code.google.com/soc/
 
* Technical issues  
 
* Technical issues  
 
** Localization Editor
 
** Localization Editor
** Interactions with Babel
+
*** Proposal for non-string resource types in Android - Marcel will work on and send to list
 +
*** Localization qualifiers for strings (orientation, screen density, etc.)
  
 
== Next Meeting ==
 
== Next Meeting ==
  
 
The next meeting will be on 14 March 2011
 
The next meeting will be on 14 March 2011

Latest revision as of 12:50, 14 February 2011

Attendees

  • Eric Cloninger (Motorola)
  • Marcel Gorri (Eldorado)
  • Daniel Pastore (Eldorado)

Agenda

http://www.timeanddate.com/worldclock/fixedtime.html?year=2011&month=2&day=14&hour=16&min=0&sec=0

  • Project Status
    • Helios SR2
      • The recent P2 update for SR2 RC2 caused a break with Pulsar SDK discovery because Pulsar was using a private API. This has been fixed in P2 and pushed back.
      • The Pulsar package is complete, tested, and ready to go out with the update. This should be the final build unless some exception occurs.
    • Indigo milestones
  • Pulsar handoff
    • Eric is continuing to have a discussion with Ian Skerrett on this, but it appears that there will not be anyone taking up the task of maintaining Pulsar EPP.
  • Events
    • EclipseCon - Eric will be attending most likely
    • PluginFest - postponed for now
  • Migration to Tools project
  • Google Summer of Code
    • Marcel has a proposal for PDE support based on the Sequoyah Localization Files Editor and will send an email to sequoyah-dev
    • http://code.google.com/soc/
  • Technical issues
    • Localization Editor
      • Proposal for non-string resource types in Android - Marcel will work on and send to list
      • Localization qualifiers for strings (orientation, screen density, etc.)

Next Meeting

The next meeting will be on 14 March 2011

Back to the top