Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Sequoyah/PhoneMeetings/Agenda10May31"

(Agenda)
(Agenda)
 
Line 13: Line 13:
 
*** All requirement items are green on the grid http://eclipse.org/helios/planning/SimultaneousReleaseGrid.php
 
*** All requirement items are green on the grid http://eclipse.org/helios/planning/SimultaneousReleaseGrid.php
 
*** No changes expected with Sequoyah for Helios.
 
*** No changes expected with Sequoyah for Helios.
*** Sequoyah project slides for the Helios release review are online (URL)
+
*** Sequoyah project slides for the Helios release review are online (http://www.eclipse.org/sequoyah/documentation/Release_Graduation_Review_Sequoyah_1.0.ppt)
 
** MTJ
 
** MTJ
 
*** API report for MTJ is completed. All items are green.  
 
*** API report for MTJ is completed. All items are green.  

Latest revision as of 13:13, 2 June 2010

Attendees

  • Eric Cloninger (Motorola)
  • Ruth Soliani (Eldorado)
  • Daniel Franco (Eldorado)
  • Daniel Pastore (Eldorado)
  • Doug Schaefer (Wind River)

Agenda

  • Helios Requirements
  • Android NDK discussion
    • Interested parties should follow the Google group for NDK http://groups.google.com/group/android-ndk?pli=1
    • Doug is tied up with CDT through Helios, but is done with build for the most part. Others can work in the UI of the build parts.
    • Doug would like to see a C code generator that looks at the JNI declarations in Java and creates the stub functions. Ruth says Eldorado has done something similar in the past.
  • Need to look into separating the sub-topics into separate calls for Android NDK, Web Tools, etc.
  • Doug suggested having only monthly calls and to force ourselves to conducting most of the technical discussions on the dev list.
  • For next meeting, hope to get all parties to discuss their ideas for the Helios SR1, SR2, and Indigo time frames.

Next Meeting

The next meeting will be on June 14, 2010.

Back to the top