Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Sequoyah/PhoneMeetings/Agenda10Apr05"
< Sequoyah | PhoneMeetings
(2 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
== Attendees == | == Attendees == | ||
− | Eric Cloninger | + | |
− | Pablo Leite | + | * Present |
− | Daniel Franco | + | ** Eric Cloninger |
− | Ruth Soliani | + | ** Pablo Leite |
− | Jon Dearden | + | ** Daniel Franco |
− | David Dubrow | + | ** Daniel Pastore |
+ | ** Ruth Soliani | ||
+ | ** Jon Dearden | ||
+ | ** David Dubrow | ||
+ | * Not present | ||
+ | ** Doug Schaefer | ||
+ | ** Christian Kurzke | ||
+ | ** Paul Buesterien | ||
== Agenda == | == Agenda == | ||
Line 12: | Line 19: | ||
** [ERIC] Send out reminders of where everything is to the sequoyah-dev list | ** [ERIC] Send out reminders of where everything is to the sequoyah-dev list | ||
* Helios Train Status | * Helios Train Status | ||
− | ** IP Logs are posted for Sequoyah 0.5, which will be the interim | + | ** IP Logs are posted for Sequoyah 0.5, which will be the interim until the release and graduation review. |
− | until the release and graduation review. | + | |
** Will start on Graduation+release review by 4/19 | ** Will start on Graduation+release review by 4/19 | ||
** David Dubrow to track Bugzilla bug 307883 as part of his SDK discovery work | ** David Dubrow to track Bugzilla bug 307883 as part of his SDK discovery work | ||
− | ** Waiting on Babel team to get information on how to configure Pulsar | + | ** Waiting on Babel team to get information on how to configure Pulsar vs. Sequoyah |
− | vs. Sequoyah | + | |
* P2 discovery | * P2 discovery | ||
** Will work on a single bug inside a single branch | ** Will work on a single bug inside a single branch | ||
− | ** [ | + | ** [Pastore-10.04.05: Done] Create bug, branch, and notify the dev list (http://dev.eclipse.org/mhonarc/lists/sequoyah-dev/msg00064.html) |
** David will take Metadata generator, replacing the UI, and test on Windows | ** David will take Metadata generator, replacing the UI, and test on Windows | ||
** Daniel Franco will work on Uninstall dialog | ** Daniel Franco will work on Uninstall dialog | ||
Line 28: | Line 33: | ||
** Milestone for 19 April for code to be finished and testing can commence | ** Milestone for 19 April for code to be finished and testing can commence | ||
* Pulsar Strawman | * Pulsar Strawman | ||
− | ** Eric proposed a series of dates for discussion. David explained how the P2 discovery works, which means the strawman isn't aligned. | + | ** Eric proposed a series of dates for discussion. David explained how the P2 discovery works, which means the strawman isn't aligned. Eric will work on a revision and make an announcement to all interested parties. |
* Project Plan | * Project Plan | ||
** Eric and Daniel received a reminder about this document | ** Eric and Daniel received a reminder about this document | ||
− | ** Document is stored on the web server, but there seems to be a linking issue. Pastore is working with | + | ** [Pastore-10.04.05: Done!] Document is stored on the web server, but there seems to be a linking issue. Pastore is working with Matt at EF to get it working right. |
− | Matt at EF to get it working right. | + |
Latest revision as of 15:19, 5 April 2010
Attendees
- Present
- Eric Cloninger
- Pablo Leite
- Daniel Franco
- Daniel Pastore
- Ruth Soliani
- Jon Dearden
- David Dubrow
- Not present
- Doug Schaefer
- Christian Kurzke
- Paul Buesterien
Agenda
- Discussion of a convenient time for this call. Decision is to keep time at 1700 UTC, every other Monday.
- [ERIC] Send out reminders of where everything is to the sequoyah-dev list
- Helios Train Status
- IP Logs are posted for Sequoyah 0.5, which will be the interim until the release and graduation review.
- Will start on Graduation+release review by 4/19
- David Dubrow to track Bugzilla bug 307883 as part of his SDK discovery work
- Waiting on Babel team to get information on how to configure Pulsar vs. Sequoyah
- P2 discovery
- Will work on a single bug inside a single branch
- [Pastore-10.04.05: Done] Create bug, branch, and notify the dev list (http://dev.eclipse.org/mhonarc/lists/sequoyah-dev/msg00064.html)
- David will take Metadata generator, replacing the UI, and test on Windows
- Daniel Franco will work on Uninstall dialog
- Eldorado will test Mac and Linux
- Documentation is still unassigned, but will arise from the testing process
- [DUBROW] Send URL for docs on discovery to sequoyah-dev@eclipse.org
- Milestone for 19 April for code to be finished and testing can commence
- Pulsar Strawman
- Eric proposed a series of dates for discussion. David explained how the P2 discovery works, which means the strawman isn't aligned. Eric will work on a revision and make an announcement to all interested parties.
- Project Plan
- Eric and Daniel received a reminder about this document
- [Pastore-10.04.05: Done!] Document is stored on the web server, but there seems to be a linking issue. Pastore is working with Matt at EF to get it working right.