Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Sequoyah/PhoneMeetings/Agenda09Jan06

< Sequoyah‎ | PhoneMeetings
Revision as of 08:49, 26 March 2010 by Kpqb38.motorola.com (Talk | contribs) (New page: == Attendees == * Ruth Soliani (Eldorado) * Eric Cloninger (Motorola) * Fabio Fantato (Eldorado) * Yufen Kuo (Montavista) * Scott Lewis (EclipseSource) == Summary == '''ECF/TmL Integrat...)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Attendees

  • Ruth Soliani (Eldorado)
  • Eric Cloninger (Motorola)
  • Fabio Fantato (Eldorado)
  • Yufen Kuo (Montavista)
  • Scott Lewis (EclipseSource)

Summary

ECF/TmL Integration

  • Scott was on the call and discussions of cooperation between the projects around VNC components.
  • (FF) TODO: Send PSF files for TmL components to ecf-dev@eclipse.org, cross-posted to dsdp-tml-dev@eclipse.org

Release 0.2

  • (FF/EC) Release Review 14-Jan
  • (FF) Update Site/Download site 15-Jan
  • Release Notes + News and Noteworthy
    • (FF) preparing files 9-Jan
    • (FF) uploading files 15-Jan
  • (FF) Ramp Down Policy 0.2 15-Jan
  • Planning 0.2.x releases to be synchronized with internal requirements

Yufen Kuo contribution

  • Integrated into 0.2
  • Wizard was included only in optional SDK package
  • Examples has wizard calls commented.
  • Changes during the integration making the test phase too short to guarantee including this code in 0.2
  • There are a bug to fix samples to 0.2.1 and 0.3

Release 0.3M5

  • (DF) bugfix 246082 28-Jan
  • (DF) bugfix 247179 28-Jan
  • (DF) 257288 IP
    • Verifying dependencies 9-Jan
    • Starting request 16-Jan
      • (FF) get orbit IP approval for /proc
    • Receive Approval until 30-Jan
  • (FF) 257287 Ramp Down Policy
    • Draft 16-Jan
    • Final 30-Jan
  • (TBD) 257292 Leverage OSGI OK, review pending 16-Jan
  • (TBD) 257293 Execution environment OK, review pending 16-Jan
  • (TBD) 257304 Usability 16-Jan
  • (TBD) 257291 Version Numbering OK, review pending 16-Jan
  • (TBD) 257303 Localization - ICU4J OK, review pending 16-Jan
  • (TBD) TW documentation - integrate material produced by TW team - 16-Jan
    • (TBD) 257114 tutorial common package
  • (DF) Black Duck /proc 9-Jan
  • (EC/FF) Start stamp process /proc 13-Jan

Other issues

  • Site review and wiki clean up
  • SVN review
    • On hold to check environment
    • (FF) open a bug against eclipse site to setup a test module in SVN before migration
  • Build scripts
    • (FF) working on Richard's feedback (received in 5-Jan) 9-Jan
    • (TBD) Phase 2 - change hard-coded variables to make nightly build more dynamically and ask to webmaster setup cron table 16-Jan
    • (TBD) Phase 3 - use common build model (new eclipse feature) 23-Jan
  • Live.eclipse.org - M6
    • (TBD) Suggestion-> upload slides and video from eclipsecon2008, need some compilation before it.
  • (TBD) TM integration - 0.4
  • ECF and VNC component - 259524
  • Bugfix scrolling - 259526 - need evaluate and estimate
  • Bugs from internal product integration

Release 0.3M6

  • (FF/EC) estimate next steps and define priorities
  • (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
  • (TBD) 243494 compile to Galileo
  • (TBD) 243500 device proxy
  • (TBD) 243504 GPS reference implementation
  • (TBD) 243508 user guide
  • (TBD) 243509 how to
  • (TBD) 243510 cheat sheets
  • (TBD) 243511 unit tests
  • (TBD) 244249 canvas background
  • (TBD) 255255 adding extension points in /proc
  • new bug to javadoc review

Suggest to postpone

  • (TBD) 243496 top
  • (TBD) 243497 cpuinfo
  • (TBD) 243502 Device Proxy logging/diagnostic
  • (TBD) 243505 log viewer in TPTP
  • (TBD) 247390 validation for properties

EclipseCon 2009

  • Tutorial - 4hs
  • Long Talk - 1h
  • Short Talk - 10 min
  • How many people? Names? How free tickets will be used?

Tutorial Format

  • Introduction (5min)
  • Technical Overview (25 min)
  • VNC hands on (40 min)
  • Device Framework hands on (1h)
  • Break (10 min)
  • /proc FS (30 min)
  • Device Proxy (50h)
  • Q&A (20 min)
  • Schedule:
    • V0 --> 26-Jan --> send to Eric review
    • V1 --> 30-Jan --> after review (First submission to site)
    • Eldorado internal dry run and adjustments - 4-Feb
    • Conference call dry run - 6-Feb
    • Final submission - 13-Feb

Next Meeting

The next meeting will be on January 20, 2009

Back to the top