Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

STP/Meetings/Minutes09March6

Record of the Call

This is not intended to be a verbatim record of the call, but to capture the core and gist of the discussions and any action items.

Attending: Vincent, Stéphane, Oisin, Andrian, Renat, Marc, Andrei, Florian

Minutes: Renat

Build, deadlines, etc

Oisin reported continious build is established for STP based on Hudson , if any of the projects want's it please fire a bug report on build component in STP with "Hudson" in the subject and description of what kind of triggers do you want for the build (e.g. checkin, every day, every week, etc).

Oisin reminded about M6 deadline at 19 March 2009, so every project shouldn't forget to tag sources that are ready for the build with 3.5M6 tag.

JWT + STP IM

Marc talked about upcoming JWT + STP-IM integration where JWT is a STP-IM customer. This topic will be followed up on eclipse since there will be a 10 min JWT talk.

Swordfish - Eclipse Link - STP

Andrei announced about his results of the conf-call with Eclipse Link guys. There is a peace of functionality that simplify the SDO integration which could potentially be interesting for Eclipse Link, Swordfish and STP projects. Andrei will prepare a draft project proposal and will post it to the wiki.

Swordfish tooling

Renat announced about ongoing discussions about tooing for Swordfish project. The project is in its initial stage, more to be found on the http://www.eclipse.org/swordfish and in the http://wiki.eclipse.org/Swordfish_Documentation

Back to the top