Jump to: navigation, search

STP/IM Component/Transformation Approaches/From BPMN

< STP‎ | IM Component
Revision as of 17:05, 31 May 2008 by Juanjosecg.gmail.com (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Currently there are two approaches covering the BPMN to STP-IM model transformation. The user will have the freedom to choice between the two, depending on the use case he is aiming to:

  • Declarative. Neutral approach; produces the most basic IM instance containing only information about the business process in the BPMN diagram.
  • Imperative: Runtime Technology Based. Used when the user aims to obtain a IM instance annotated with runtime technology information to later transform a model of this kind (BPEL, JBI).