Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Polarsys/BilbaoFace2Face"

(Wednesday March 14th)
(Blanked the page)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
==Organization==
 
The OPEES/Polarsys took place in Bilbao from March 13th to March 14th 2012.
 
It was hosted by Tecnalia and organized by SQS. Thanks to both SQS and Tecnalia for this organization.
 
  
Meeting address was: <br>
 
Parque Tecnológico de Bizkaia. <br>
 
Edificio 202 <br>
 
E-48170 Zamudio (Vizcaya)
 
 
==Meeting Minutes==
 
===Tuesday March 13th===
 
''9:00 - 13:00  Private OPEES ITEA2 session''<br>
 
See the OPEES forge for the documentation presented during this part. Documents are under folder Meetings/2012_03_13_Bilbao
 
 
'''14:30 - 18:00  Polarsys infrastructure and experimentation meeting (with a distant call with the Eclipse infrastructure team)'''
 
* The [http://wiki.eclipse.org/images/8/85/EDP2012.pdf  Eclipse Development Process] by Wayne Beaton
 
* [http://wiki.eclipse.org/images/1/11/Polarsys_Releases_Engineering_0-2c.pdf Polarsys release engineering and release contents] by Benoît Langlois
 
* Discussion about the governance of Topcased/MDT Papyrus. With a [http://wiki.eclipse.org/images/4/40/IssuesTOPCASED_Papyrus.pdf presentation of issues faced by Astrium].
 
* Discussions about the relationship between Polarsys and the LTS IWG, Common Build Infrastructure
 
 
===Wednesday March 14th===
 
'''9:00 - 13:00  Polarsys meeting''' <br/>
 
*Polarsys
 
** Corporate Presentation of Polarsys (to share a common presentation): [http://wiki.eclipse.org/images/e/e1/PolarsysEndUserBenefits2012March27.pdf Polarsys End User Benefits Presentation Updated after the meeting]
 
* Polarsys governance
 
** Clarification of memberships and charter:
 
*** Research labs are eligible for 5 000$ solution member fees due to specific classification in the Eclipse bylaws.
 
*** On the Polarsys side, it has been decided to follow the Eclipse position and ask for the same class of fees. So Research labs are in the <10M$ category (10 000$ for participating members and 25 000$ for strategic members).
 
*** P. Arberet and J Delange raise the issue of membership for CNES and ESA like entities. Basically, they do not want to pay a fee because they think their providers should do it themselves. Participating may mean a multiplicated fee: one direct and others re-invoiced by the providers. The proposal from Polarsys is to consider CNES and ESA as Research Institute, so that to apply the fee of <10M$ category.
 
** Discussion about appointement of Chairman and SpokePerson
 
*** Chairman and spokesperson: the chairman needs to be a strategic eclipse member up to now. It means that only somebody from Obeo or Itemis should be the chairman. The spokesperson can be anybody.
 
** Review of the [[Polarsys/Charter | Charter]]
 
'''14:30 - 16:00  Polarsys meeting'''
 
* Presentation of the [http://wiki.eclipse.org/images/2/27/IP_for_Eclipse_Committers_-_Polarsys_2012March14.pdf IP Process for Eclipse Committers] by Janet Campbell of the Eclipse Foundation
 
* Roundtable with ne potential members (small presentations from Fraunhofer, Itemis, Intecs)
 
** Presentation of Modelbus by Tom Ritter (Fraunhofer FOKUS). FOKUS wants to contribute Modelbus to Polarsys and subscribe as a guest member to begin with. A Modelbus based spin-off support company may subscribe later to Polarsys.
 
** Presentation of Itemis role in the automotive IWG
 
***Facing issues with big models (x100000 elements and x10000 files).
 
*** Coordination body
 
** Presentation from Lei Pi, INTECS
 
*** Developing currently a connector between doors and TOPCASED / MDT Papyrus
 
* Discussion about [[Polarsys/Labelling | Labelling]]
 
 
= Next Meeting =
 
See Information on the [[Polarsys/ToulouseMay2012Meeting |meeting page]]
 

Latest revision as of 08:25, 10 September 2013

Back to the top