Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Platform-releng/Indigo

< Platform-releng
Revision as of 14:30, 7 September 2010 by Kmoir.ca.ibm.com (Talk | contribs) (Milestone 6 (20100311))

Platform Releng Draft Indigo plan

This page highlights the proposed items for the platform releng plan for the Indigo release. The most important thing we plan to accomplish this release is to move the 3.7 build to run completely on eclipse.org hardware. In addition, we plan to have 4.1 tests running on eclipse.org hardware once the tests are refactored to take into account the new 4.0 internals.

  1. Streamline 4.0 and 3.7 builds Platform-releng/Indigo_Build_Changes
  2. Move 3.7 build to run completely on eclipse.org hardware
  3. Invoke build on build.eclipse.org with hudson bug 247332
  4. Decouple build and test bug 261388
  5. Modular build (Using chaining aspects of hudson)
  6. Run compare tool against p2 repos instead of sdk bug 268851
  7. Mirror test bundles to repo bug 318514
  8. Reorganize build directory so only essential content is sent to mirrors bug 316620
  9. Run JUnit tests on Windows, Linux and mac on eclipse.org hardware. We need Mac hardware donations.
  10. Remove old platforms bug 317309

Milestone Plan

Milestone 1 (20100806)

  • Progress.gif 3.6.1 maintenance work
  • Ok green.gif Change Eclipse Test framework to zipped p2 repo bug 310267
  • Ok green.gif Remove JUnit and perf tests running on 1.5 vm bug 321142

Milestone 2 (20100917)

  • Progress.gif 3.6.1 maintenance work
  • Ok green.gif Mirror test bundles to repo bug 318514

Milestone 3 (20101029)

Milestone 4 (20101210)

  • Progress.gif 3.6.1 maintenance work
  • Progress.gif Remove old platforms bug 317309
  • Glass.gif Run code coverage tool during builds bug 241254
  • Progress.gif Invoke build on build.eclipse.org with hudson bug 247332

Milestone 5 (20100128)

  • Progress.gif 3.6.1 maintenance work


Milestone 6 (20100311)

  • Progress.gif reduce bug backlog

Milestone 7 (20100429)

Back to the top