Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Planning Council/February 22 2013"

(initial agenda)
 
(Full respin cycle)
Line 163: Line 163:
  
 
==== Full respin cycle ====  
 
==== Full respin cycle ====  
: Turn on the aggregator, let people update their contributions so it runs, respin EPP, re-test, etc.  
+
: Turn on the aggregator, let people update their contributions so it runs, hope we get same content, respin EPP, re-test, etc.  
 
:: Pro: best quality
 
:: Pro: best quality
 
:: Con: would take 2 weeks (IMHO), sounds like several projects would want to contribute new bits, lots of work for all participants
 
:: Con: would take 2 weeks (IMHO), sounds like several projects would want to contribute new bits, lots of work for all participants
 +
::: Other bugs mentioned as desired in a respin, if we did one. Please comment in these bugs if you have questions/suggestions for them.
 +
::: GEF {{bug|401477}}  (No "perfect fix", even if we did a respin, due to version number snafu even in SR1)
 +
::: M2E {{bug|400520}}  (They will effectively be providing an SR2a, it sounds like, even if we don't respin)
  
 
==== Provide a 4th "composite" to Juno SR2 ====  
 
==== Provide a 4th "composite" to Juno SR2 ====  

Revision as of 12:19, 22 February 2013

Logistics

Meeting Title: Planning Council Conference Call
Date & Time: Wednesday, February 06, 2013, at 1200 Eastern
Dial in: (See Asterisk service for complete details on SIP, potential new numbers, phone mute commands, etc.)

Phone Numbers:

  • Ottawa (local call in Ottawa) 1-613-454-1403
  • North America (toll free) 1-877-369-7806
  • Germany (local call anywhere in Germany) +49-692-2224-6059
  • France (local call anywhere in France) +33-17-070-8535
  • UK (toll free) 0800-033-7806
  • Switzerland (local call anywhere in Switzerland) +41-44-580-2115
For all phone lines: Participant conference extension: 710 then enter pin 35498
  • SIP clients:
call 710@asterisk.eclipse.org, then enter pin 35498.

Members and Attendees

PMC (and Strategic) Reps
Chris Aniszczyk Technology (PMC)
John Arthorne Eclipse (PMC)
Steffen Pingel Mylyn (ALM) PMC
Brian Payton Datatools (PMC)
Doug Schaefer Tools (PMC)
Adrian Mos SOA (PMC)
Ed Merks Modeling (PMC)
Ian Bull Rt (PMC)
David Williams WTP (PMC) (appointed Chair)
Gary Xue Birt (PMC)
Wayne Beaton Eclipse Foundation (appointed)
Strategic Reps
Cedric Brun OBEO (Strategic Developer)
Neil Hauge Oracle (Strategic Developer)
Kaloyan Raev SAP AG (Strategic Developer)
Igor Fedorenko Sonatype (Strategic Developer)
Markus Knauer Innoopract (Strategic Developer)
Achim Loerke BREDEX (Strategic Developer)
(PMC rep) Actuate (Strategic Developer) X
(PMC rep) IBM (Strategic Developer) X
Inactive
[no name] CA Inc. (Strategic Consumer) X

Note: "Inactive" refers to Strategic Members or PMCs we have not heard from for a while, and have been unable to convince to participate. Those members can become active again at any time. Contact David Williams if questions.

Note: feel free to correct any errors/omissions in above attendance record.
Y = Yes, attended
N = No, did not
R = regrets sent ahead of time
D = delegated
X = not expected


Juno SR2

  • SR2 Recovery Plan

(I've left in the "issues bullet" from last meeting ... to highlight some of the history here).

Background

bug comment 400513
Egit message list
Numerous posts to cross-project list

Alternatives

Please come prepared to discuss alternatives

Does anyone know of any impact of delays to strategic members that might effect choices?
Impact to the projects you represent on ability to do the re-work if needed?

Do nothing

let EGit provide updated project repo with fix
Pro: easy
Con: EPP users especially get the bad bug right away ?and could damage data? before applying the fix

Simply remove EGit 2.3 from common repo

thus effectively reverting to their 2.1 in SR1, re-spining EPP packages, allow to re-mirror, etc.
Pro: moderately easy -- assuming I could do the p2.remove script to remove just their bits (not a certainty)
Con: EGit starts off pretty far behind

Full respin cycle

Turn on the aggregator, let people update their contributions so it runs, hope we get same content, respin EPP, re-test, etc.
Pro: best quality
Con: would take 2 weeks (IMHO), sounds like several projects would want to contribute new bits, lots of work for all participants
Other bugs mentioned as desired in a respin, if we did one. Please comment in these bugs if you have questions/suggestions for them.
GEF bug 401477 (No "perfect fix", even if we did a respin, due to version number snafu even in SR1)
M2E bug 400520 (They will effectively be providing an SR2a, it sounds like, even if we don't respin)

Provide a 4th "composite" to Juno SR2

Would have only EGit in it. Assuming all if versioned correctly, EPP packages and "updates" would find their latest ones
Pro: moderately easy, with minimal work from other projects.
Con: The "bad bits" would still be in repo and theoretically installable, if someone happened to deliberately pick an older version

Other Alternatives?

Issues (from previous meeting)

EGit planning 2.3, but 2.1 is still their common repo contribution? (That is, why aren't they "fully participating"?) See bug 399437. Kepler contribution is even further behind.
Action Item: Chris will "get back to us" on what EGit's plans are ... he initially thought "final code" would be done in two weeks, but I reminded him RC4/final builds are next Wednesday.


Next Meeting

  • March 6, 2013

Reference

Kepler Wiki page
Juno Wiki page
Planning Council/Indigo retrospective
Planning Council Members
Simultaneous Release Roles and Simultaneous Release Roles/EMO

Back to the top