Difference between revisions of "PTP/meetings/September 2012"
(→Agenda) |
(→Parallel Package Downloads) |
||
Line 91: | Line 91: | ||
! Juno | ! Juno | ||
! September* 2012 | ! September* 2012 | ||
− | | | + | | |
− | | | + | | 43,389 |
|} | |} | ||
<br> | <br> | ||
− | September* downloads through September | + | September* downloads through September 11 |
<br>Juno by platform through July: Win32 2443; Win64 3218; Linux32 608; Linux64 2225; Mac32 136; Mac64 441 <br> Totals Windows 5661; Linux 2833; Mac 583 | <br>Juno by platform through July: Win32 2443; Win64 3218; Linux32 608; Linux64 2225; Mac32 136; Mac64 441 <br> Totals Windows 5661; Linux 2833; Mac 583 | ||
<br> | <br> |
Revision as of 11:30, 11 September 2012
September 2012 Meeting
Date: September 11, 2012 Time: 1:00 PM EDT
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402
Agenda
- Overall project, releases, etc.
- Next builds, releases
- 6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 planned for Juno SR1 on 6/28; last build for us would be RC4+2 on 9/18
- Juno SR1 -Sept 28 GA
- Kepler M2+3- Oc 10 - have we moved to +3 day?
- Download stats
- 43,389 for Juno Parallel package since Juno release June 27 (as of today 9/11)
- 64,860 total Indigo SR2 (PTP 5.0.x)
- Next builds, releases
- Status Reports
- PTP Core/debug
- RDT and remote status
- Synchronized Projects
- Resource Managers / Target System Configurations - legacy and JAXB (configurable)
- Monitoring - incl. new System Monitoring Perspective
- PLDT
- ETFw, other tool integrations
- Photran
- Docs, Help, N&N
- Other PTP contributions
- Education and Outreach
- User/Developer Meeting - Sept 18-20, Chicago
- Tutorials
- SC12 Salt Lake City (Monday Nov 19, accepted) - http://sc12.supercomputing.org/schedule/event_detail.php?evid=tut160
- BOFs
- SC12 BOF (accepted) - TUESDAY Nov. 13 12:15-1:15PM (Note move from original on Thursday)
- Other Business
- Next meeting - Tuesday October 9
Attendees
- Beth Tibbitts, IBM
- Wyatt Spear, U.Oregon
- Jeff Overbey, NCSA
- Chris Navarro, NCSA
- Greg Watson, IBM
- John Eblen, ORNL
- David Alexander, TechX
Minutes
Parallel Package Downloads
Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. SR0,SR1,SR2) the counts are set to 0 and restarted.
Release | Month | Downloads | Total Downloads |
---|---|---|---|
Indigo SR1 | thru Feb 2012 | 40,298 | |
Indigo SR2 | thru June 2012 | 64,860 | |
Juno | (4 days!) June 2012 | 902 |
902 |
Juno | July 2012 | 8169 | 9071 |
Juno | August 2012 | 19,112 | 28,009 |
Juno | September* 2012 | 43,389 |
September* downloads through September 11
Juno by platform through July: Win32 2443; Win64 3218; Linux32 608; Linux64 2225; Mac32 136; Mac64 441
Totals Windows 5661; Linux 2833; Mac 583