Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/March 2013"

< PTP‎ | meetings
(Agenda)
(Agenda)
Line 20: Line 20:
 
#*Download stats (see below)  
 
#*Download stats (see below)  
 
#** Juno SR1 Parallel package - 291,258 total  to 2013-02-28
 
#** Juno SR1 Parallel package - 291,258 total  to 2013-02-28
#** Juno SR1 Parallel package - 12,120 total  from availability 2013-03-01 to  2013-03-11
+
#** Juno SR2 Parallel package - 12,120 total  from availability 2013-03-01 to  2013-03-11
 
#Status Reports  
 
#Status Reports  
 
#*Bug status/triage - still need to schedule
 
#*Bug status/triage - still need to schedule

Revision as of 10:44, 11 March 2013

March 2013 Meeting

Date: March 12, 2013 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
    • Download stats (see below)
      • Juno SR1 Parallel package - 291,258 total to 2013-02-28
      • Juno SR2 Parallel package - 12,120 total from availability 2013-03-01 to 2013-03-11
  2. Status Reports
    • Bug status/triage - still need to schedule
      • CDT remote include fix - status since SR2?
    • PTP Core/debug
    • RDT, Synchronized Project, Remote status
    • Target System Configurations (previously known as Resource Managers)
    • Monitoring
    • PLDT
    • ETFw, other tool integrations
    • Photran
    • Docs, Help, N&N
    • Other PTP contributions
  3. Education and Outreach
    • Monthly PTP User call - last one was Wed Jan 23 - see PTP User Meetings - website needs to be updated
      • Feb 27 was cancelled; Next is 2013-03-27
    • Tutorials, BOFs, other outreach opportunities
  4. Other Business
    • EclipseCon is March 25-28 in Boston
  5. Next meeting - Tuesday 2013-04-09

Reminder to discuss: (Beth) toolchain names: consistency, use of 'Remote' or not, help choosing.

Back to the top