Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/March 2012"

< PTP‎ | meetings
(Minutes)
(Minutes)
Line 73: Line 73:
 
* Build locations: on build.eclipse.org,  5.0.x/date  directories - use a lot of disk space.  Juno builds will only keep the last build in builds/juno/nightly.  Greg will make an index.html page so it can be accessed via web.
 
* Build locations: on build.eclipse.org,  5.0.x/date  directories - use a lot of disk space.  Juno builds will only keep the last build in builds/juno/nightly.  Greg will make an index.html page so it can be accessed via web.
  
* Greg: goal for Juno release:
+
* PTP Juno release goals (Greg):
 
** separation of control and monitoring in Resource Managers. In fact concept of resource managers will disappear.
 
** separation of control and monitoring in Resource Managers. In fact concept of resource managers will disappear.
 
** Res Manager concept hurts usability.  Future will not require pre-configuration of RM
 
** Res Manager concept hurts usability.  Future will not require pre-configuration of RM

Revision as of 14:15, 6 April 2012

March 2012 Meeting

Date: March 13, 2012 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 5.0 Indigo - 5.0.5 released Feb 17; Indigo SR2 (incl. 5.0.5) was Feb 24
        • 5.0.6 released yesterday (Mar. 12)
      • 6.0 Juno - next milestone: M6+2 is Mar 20
      • Status and location of builds now on Hudson (Juno, Indigo, and 4.1)
    • Download stats - note here
    • Git status
    • EclipseCon is Mar 26-29 in Reston, VA
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Docs, Help, Tutorials
    • Other PTP contributions
  3. PTP User call report
    • Previous call was Wed Feb 22, 2012 (4th Wednesday) See PTP/PTP_User_Meetings - answering various user questions
    • Next meeting? 4th Wed is Mar 28 during EclipseCon ...?
  4. Education and Outreach
    • Status of outreach groups (grants etc.)
  5. Other Business
  6. Next meeting - Tuesday Apr 10

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Chris Navarro, NCSA
  • John Eblen, ORNL
  • Dave Wootton, IBM
  • Claudia Knobloch, Juelich
  • Wyatt Spear, U.Oregon
  • Jeff Overbey, NCSA
  • Jay Alameda, NCSA
  • Roland Schulz, ORNL


Minutes

  • Releases
    • PTP 5.0.5 was released Feb. 15 - and with Eclipse SR2 2/24/2012;
    • PTP 5.0.6 was released yesterday March 14;
    • PTP 5.0.7 may be released if bug fixes warrant it.
  • Downloads as of today: 17,166 of the parallel package (see bottom of this page for more details)
  • Jeff: working with Blue Waters test system and Juno Release
  • Mar. 20 is next Juno milestone - M6. We are not freezing API yet. Need to get build and packages resolved.
    • The contributed resource managers feature is not in the package. Should it be?
  • LinuxTools is moving to CDT (some of it). Need to discuss what's in our package
  • Build locations: on build.eclipse.org, 5.0.x/date directories - use a lot of disk space. Juno builds will only keep the last build in builds/juno/nightly. Greg will make an index.html page so it can be accessed via web.
  • PTP Juno release goals (Greg):
    • separation of control and monitoring in Resource Managers. In fact concept of resource managers will disappear.
    • Res Manager concept hurts usability. Future will not require pre-configuration of RM
      • On Launch page, just choose config file and connection
      • Output appears on a console directly.
    • Monitoring - e.g. on a system with a Job Scheduler
    • Legacy Resource Managers will still work. Perhaps a separate run configuration for these?
  • Environment Management (by Jeff) looks good
  • John Eblen - Synchronized Projects
    • Goals: 1. Merging Support 2. Relocation of projects copy/move/delete 3. New project wizard - waiting on CDT patch; Conversion wizard needs to match.
    • CDT new project wizard - "prototype" wizard available
    • Brian wants large project with multiple file systems, each pointing to (same) shared file system. Sync all? sync active?
  • Claudia - working on several bug fixes
    • unix MOTD foils remote monitoring - if it contains XML tags, it corrupts the data stream - Claudia will discuss at scaling meeting on Thursday
    • Usage bars are possible
    • decided against using net-table
  • Greg interested in knowing how to show usage bars
  • Wolfgang trying to get data from GPUs via job scheduler to show in system monitoring perspective
  • Paratools controls BG/Q via PBS - awaiting eclipse legal to contribute to PTP
  • Jeff - Photran bugs prioritized.
    • New PLDT extension point for analysis
    • Mariano (Argentina) working on new features
    • Chris Navarro has fixed debugger bug (wrong listener)
  • ETFW-Wyatt
  • DaveW - minor fixes only
  • User meeting - Jeff guest host; Galen covered gprof and gcov.
    • Next user meeting - reschedule so it doesn't conflict with EclipseCon - move to April 4
  • CDT would like remote support without depending on RDT - but no agreement on how to integrate in CDT. May be interested in sync. project too.
  • Next meeting April 10
    • Tuesday is CDT summit @ EclipseCon

Parallel Package Downloads

Download numbers, by month, of 'IDE for Parallel Application Developers' available on http://eclipse.org/downloads. This count is since the release of Eclipse Indigo SR1, on 23 Sept. 2011. SR2 was made available on Feb 24, 2012 and the download numbers were reset to 0 for SR2 counts.

Month Downloads Total Downloads
Sept 2011 3825 3,825
Oct 2011 8630 12,455
Nov 2011 8777 21,232
Dec 2011 4506 25,738
Jan 2012 8179 32,480
Feb 2012 6381 40,298 SR1
Feb 2012 7329 7,329 SR2
Mar 2012* 41801 49,130 SR2
* downloads for March via query, for SR2 27 Mar 2013

By platform through January: Windows 20,629; Linux 9866; Mac 3422

Back to the top