Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/June 2013"

< PTP‎ | meetings
(Minutes)
Line 47: Line 47:
  
 
* Overall project, releases, etc.
 
* Overall project, releases, etc.
** 6.0.x Juno branch - any activity?
+
** 6.0.x Juno branch - any activity? none seen; post to ptp-dev if you need a build.
 +
*** After Kepler release sometime, it will become 'release' and new work post-7.0 will be master.
 +
*** Beth suggests changing build names to not use 'master' for both (1) git branch and (2) aggregate build. Beth will open a bug to track.
 
** 7.0.0 Kepler master branch
 
** 7.0.0 Kepler master branch
*** RC4+3 (PTP last build) is tomorrow June 12
+
*** RC4+3 (PTP last build) is tomorrow June 12 - cutoff is 5pm ET - get changes in early - Greg is working on ISV docs; Beth is working on user docs; Trying to get APIs set and documented properly to reduce future churn. Greg working on ISV/developer documentation as good as possible. Risk to change stuff so late, but it should be mostly comments so should be ok.
 +
*** APIs - determination of what should be API; maintain doc, maintain API, exporting. API changes cause a version increment.
 +
**** Dave W asks about LSF custom widgets, should they be API or not.
 +
***** MANIFEST.MF:  exported  if no export-package, then nothing is API - see also in runtime tab.  if nothing there, nothing is API.  In future might want to export everything but keep internal, so others can use it (with only warnings)
 +
***** Are there any tools to help? Look at manifest in each plugin and look at what's exported - look at package, and classes in it.
 +
**** x-internal internal and not visible; x-friends internal (plugins referring to your code don't get the warning) .  ISSUE:  exported-packages whose visibility is visible to downstream plugins (neither x-internal or x-friends annotation)
 +
**** Other release info:  Release review is June 12 (tomorrow), Greg provided review documentation - available on project page - http://projects.eclipse.org, choose tools, ptp, link to releases (current, next release) - next release tab has description, project plan.  Review tab is info to be used for release review. including Q&A. IPLog info has been updated by Greg. Lists all contributions back to beginning of PTP.  Subproject Photran considered part of PTP, included in all releases.
 
*** Kepler release is Wednesday June 26
 
*** Kepler release is Wednesday June 26
** Downloads (see bottom of page)
+
*** Need to update New&Noteworthy (can be after tomorrow's build but before June 26). 
 +
*** Bug List: Need to include a bug list with that - in bugs be sure to set target milestone for fixes so we can query this bug list.
 +
** Downloads (see bottom of page) - Juno Parallel package is 116,055 as of today
 
*Misc topics:
 
*Misc topics:
 
** Eclipse downloads page - updated for Kepler with short description of each package - http://eclipse.org/downloads/index-developer.php
 
** Eclipse downloads page - updated for Kepler with short description of each package - http://eclipse.org/downloads/index-developer.php
 
*Kepler contributions/changes
 
*Kepler contributions/changes
** GIG (Graphical Inquisitor for GPU Programs) - not included
+
** GIG (Graphical Inquisitor for GPU Programs) - not included - hope to get it finished up in the future.
 
** PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu.  Integration with Chris N's profile launch??  Should they be packaged together in feature?
 
** PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu.  Integration with Chris N's profile launch??  Should they be packaged together in feature?
 +
*** We could do it in a 7.1 - but would have another branch to maintain. Will evaluate
 
** New TSC's -- IBM Platform MPI.  Others?
 
** New TSC's -- IBM Platform MPI.  Others?
 
** Kepler PTP help files / docs
 
** Kepler PTP help files / docs
*** links to optional features (e.g. GEM)
+
*** links to optional features (e.g. GEM) - problem is Parallel Package does not have GEM installed and it is linked in the toc.html.  toc.xml builds dynamic TOC and is not a problem, but we can't link to its results with URL. Too late for Kepler but we can address for future releases.  Need complete docs somewhere, but don't want broken links in some cases.
*** need updated PTP 7.0 screenshots for TSC's:  SLURM, GridEngine, ...
+
*** need updated PTP 7.0 screenshots for TSC's:  SLURM, GridEngine, ... Jay can get some.  Beth will ask on ptp-dev
 
** APIs need documentation
 
** APIs need documentation
*Status Reports
 
** PTP Core/debug
 
** RDT, Synchronized Project, Remote
 
** Target System Configuration support
 
** Monitoring
 
** PLDT
 
** ETFw, other tool configurations
 
 
** Docs, Help, N&N
 
** Docs, Help, N&N
***[[PTP/new and noteworthy/7.0.0|New &amp; Noteworthy for Kepler 7.0]] - please append new features, etc for Kepler release  
+
***[[PTP/new and noteworthy/7.0.0|New &amp; Noteworthy for Kepler 7.0]] - please append new features, etc for Kepler release - can be after tomorrow's build, but should be before June 26 release day.
 
*Testing plans
 
*Testing plans
 
** See http://wiki.eclipse.org/PTP/testing/7.x - testing matrix
 
** See http://wiki.eclipse.org/PTP/testing/7.x - testing matrix
Line 77: Line 81:
 
*** Other tools/contributions
 
*** Other tools/contributions
 
*Tutorials and Outreach
 
*Tutorials and Outreach
**SC13 tutorial  - not accepted; appealed - reviewers had incorrect info
+
**SC13 tutorial  - not accepted; appealed - reviewers had incorrect info.  We will follow up in a few weeks.
 
** XSEDE tutorial July 22 - on Kepler!
 
** XSEDE tutorial July 22 - on Kepler!
** SciComp tutorial May (Greg) - report
+
** SciComp tutorial May (Greg) - report - tutorial based on Kepler, about 15 attendees (of 50 at conference) - enthusiastic response, lots of questions, audience really saw the value.  Network connection at hotel was problematic by Sync projects and monitoring worked fairly well.  Also covered IBM product PE Developer Edition
** Next PTP Users Call - May 29?
+
** Next PTP Users Call - June 26 - Topic: tour of new features in Kepler - e.g. ETFw, Sync projects, Env Mgmt, LSF
 +
** Potential PTP user-developer meeting in September in Chicago Sept 14-15 or 16-17. Jay will let us know. 
 +
** Next ptp-dev meeting July 10
  
 
== Parallel Package Downloads  ==
 
== Parallel Package Downloads  ==

Revision as of 14:04, 11 June 2013

June 2013 Meeting

Date: June 11, 2013 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  • Overall project, releases, etc.
    • 6.0.x Juno branch - any activity?
    • 7.0.0 Kepler master branch
      • RC4+3 (PTP last build) is tomorrow June 12
      • Kepler release is Wednesday June 26
    • Downloads (see bottom of page)
  • Misc topics:
  • Kepler contributions/changes
    • GIG (Graphical Inquisitor for GPU Programs) - not included
    • PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu. Integration with Chris N's profile launch?? Should they be packaged together in feature?
    • New TSC's -- IBM Platform MPI. Others?
    • Kepler PTP help files / docs
      • links to optional features (e.g. GEM)
      • need updated PTP 7.0 screenshots for TSC's: SLURM, GridEngine, ...
    • APIs need documentation
  • Status Reports
    • PTP Core/debug
    • RDT, Synchronized Project, Remote
    • Target System Configuration support
    • Monitoring
    • PLDT
    • ETFw, other tool configurations
    • Docs, Help, N&N
  • Testing plans
  • Tutorials and Outreach
    • SC13 tutorial - not accepted; appealed - reviewers had incorrect info
    • XSEDE tutorial July 22 - on Kepler!
    • SciComp tutorial May (Greg) - report
    • Next PTP Users Call - May 29?

Attendees

Minutes

  • Overall project, releases, etc.
    • 6.0.x Juno branch - any activity? none seen; post to ptp-dev if you need a build.
      • After Kepler release sometime, it will become 'release' and new work post-7.0 will be master.
      • Beth suggests changing build names to not use 'master' for both (1) git branch and (2) aggregate build. Beth will open a bug to track.
    • 7.0.0 Kepler master branch
      • RC4+3 (PTP last build) is tomorrow June 12 - cutoff is 5pm ET - get changes in early - Greg is working on ISV docs; Beth is working on user docs; Trying to get APIs set and documented properly to reduce future churn. Greg working on ISV/developer documentation as good as possible. Risk to change stuff so late, but it should be mostly comments so should be ok.
      • APIs - determination of what should be API; maintain doc, maintain API, exporting. API changes cause a version increment.
        • Dave W asks about LSF custom widgets, should they be API or not.
          • MANIFEST.MF: exported if no export-package, then nothing is API - see also in runtime tab. if nothing there, nothing is API. In future might want to export everything but keep internal, so others can use it (with only warnings)
          • Are there any tools to help? Look at manifest in each plugin and look at what's exported - look at package, and classes in it.
        • x-internal internal and not visible; x-friends internal (plugins referring to your code don't get the warning) . ISSUE: exported-packages whose visibility is visible to downstream plugins (neither x-internal or x-friends annotation)
        • Other release info: Release review is June 12 (tomorrow), Greg provided review documentation - available on project page - http://projects.eclipse.org, choose tools, ptp, link to releases (current, next release) - next release tab has description, project plan. Review tab is info to be used for release review. including Q&A. IPLog info has been updated by Greg. Lists all contributions back to beginning of PTP. Subproject Photran considered part of PTP, included in all releases.
      • Kepler release is Wednesday June 26
      • Need to update New&Noteworthy (can be after tomorrow's build but before June 26).
      • Bug List: Need to include a bug list with that - in bugs be sure to set target milestone for fixes so we can query this bug list.
    • Downloads (see bottom of page) - Juno Parallel package is 116,055 as of today
  • Misc topics:
  • Kepler contributions/changes
    • GIG (Graphical Inquisitor for GPU Programs) - not included - hope to get it finished up in the future.
    • PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu. Integration with Chris N's profile launch?? Should they be packaged together in feature?
      • We could do it in a 7.1 - but would have another branch to maintain. Will evaluate
    • New TSC's -- IBM Platform MPI. Others?
    • Kepler PTP help files / docs
      • links to optional features (e.g. GEM) - problem is Parallel Package does not have GEM installed and it is linked in the toc.html. toc.xml builds dynamic TOC and is not a problem, but we can't link to its results with URL. Too late for Kepler but we can address for future releases. Need complete docs somewhere, but don't want broken links in some cases.
      • need updated PTP 7.0 screenshots for TSC's: SLURM, GridEngine, ... Jay can get some. Beth will ask on ptp-dev
    • APIs need documentation
    • Docs, Help, N&N
      • New & Noteworthy for Kepler 7.0 - please append new features, etc for Kepler release - can be after tomorrow's build, but should be before June 26 release day.
  • Testing plans
  • Tutorials and Outreach
    • SC13 tutorial - not accepted; appealed - reviewers had incorrect info. We will follow up in a few weeks.
    • XSEDE tutorial July 22 - on Kepler!
    • SciComp tutorial May (Greg) - report - tutorial based on Kepler, about 15 attendees (of 50 at conference) - enthusiastic response, lots of questions, audience really saw the value. Network connection at hotel was problematic by Sync projects and monitoring worked fairly well. Also covered IBM product PE Developer Edition
    • Next PTP Users Call - June 26 - Topic: tour of new features in Kepler - e.g. ETFw, Sync projects, Env Mgmt, LSF
    • Potential PTP user-developer meeting in September in Chicago Sept 14-15 or 16-17. Jay will let us know.
    • Next ptp-dev meeting July 10

Parallel Package Downloads

Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.

Release Month Downloads Total Downloads
Indigo SR1 thru Feb 2012  40,298
Indigo SR2 thru June 2012 64,860
Juno (4 days!) June 2012 902 902
Juno July 2012 8169 9071
Juno August 2012 19,112 28,009
Juno September 2012 47,648 76,457
Juno SR1 September 2012 5346 5346
Juno SR1 October 2012 65,353 70,699
Juno SR1 November 2012 58,796 129,495
Juno SR1 December 2012 57,811 187,306
Juno SR1 January 2013 63,350 250,656
Juno SR1 February 2013 39,877 290,533
==Juno SR2== March 2013 41,367 41,367
==Juno SR2== April 2013 36,372 77,739
==Juno SR2== May 2013 28,575 106,316
==Juno SR2== June* 2013 115,799


June* downloads as of June 10.

<< Previous month stats | Next month stats >>

Back to the top