July* downloads as of July 9.    Download count query yields 10,230 total, yet downloads page says 8795. Investigating.  (Usually these match)
 
July* downloads as of July 9.    Download count query yields 10,230 total, yet downloads page says 8795. Investigating.  (Usually these match)
N.B. August 13: eclipse webmaster confirms the download page counts were incorrect. 10K is right for this date.
+
*N.B. August 13: eclipse webmaster confirms the download page counts were incorrect. 10K is right for this date.
  
 
[[PTP/meetings/June_2013#Parallel_Package_Downloads | << Previous month stats ]] | [[PTP/meetings/August_2013#Parallel_Package_Downloads | Next month stats >> ]]
 
[[PTP/meetings/June_2013#Parallel_Package_Downloads | << Previous month stats ]] | [[PTP/meetings/August_2013#Parallel_Package_Downloads | Next month stats >> ]]

Latest revision as of 23:23, 13 August 2013

July 2013 Meeting

Date: July 9, 2013 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  • Overall project, releases, etc.
    • 6.0.x Juno branch - any activity?
    • Kepler master branch - 7.0.? 7.1? 8.0?
    • ptp_7_0 branch
      • Kepler release was Wednesday June 26
        • Release post-mortem, lessons learned?
    • Gerrit
    • Downloads (see bottom of page)
  • Misc topics:
  • PTP contributions/changes still to consider for the future?
    • GIG (Graphical Inquisitor for GPU Programs) - Utah
    • PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu. Integration with Chris N's profile launch?? Should they be packaged together in feature?
  • Status Reports
    • PTP Core/debug
    • RDT, Synchronized Project, Remote
    • Target System Configuration support
    • Monitoring
    • PLDT
    • ETFw, other tool configurations
    • Docs, Help, N&N
  • Testing plans
  • Tutorials and Outreach
    • SC13 tutorial - not accepted; appealed - no response
    • XSEDE tutorial July 22 - on Kepler! In progress
    • Next PTP Users Call - July 31 - note this is a week later than normal due to XSEDE
  • Next ptp-dev meeting August 13

Attendees

Greg Watson, Beth Tibbitts, Chris Navarro, Wyatt Spear, Jeff Overbey, Jay Alameda, Roland Schulz, John Eblen

Minutes

  • Overall project, releases, etc.
    • Kepler master branch - 7.0.? 7.1? 8.0? haven't decided which release it will be
      • See discussion on cdt-dev and cross-project mailing lists on shortening Eclipse release cycle. . Discussion.
      • if add feature, 7.1; if API change, do 8.0. Might need more API cleanup.
    • ptp_7_0 branch
      • Kepler release and PTP 7.0 was Wednesday June 26; PTP 7.0.1 had some bugs fixed, release July 3. There are a few more bugs. Busy preparing XSEDE tutorial for July 22 though.
        • Release post-mortem, lessons learned? Suggestion: No new features past M7. Have eekly calls pre-release, the last month or so, to check in on testing.
          • Our work is affected by only 3 Eclipse package releases (R, SR1, and SR2). See discussions about more frequent releases. We are doing a custom build for the Parallel package for XSEDE tutorial. Simplifies installation for attendees.
    • Gerrit
      • PTP project is now enabled for Gerrit. Beth has changed PTP environment setup wiki page (http://wiki.eclipse.org/PTP/environment_setup_70#Checking_out_PTP_projects_with_Git) for new URL. Existing simple commits still work. git.eclipse.org/r can push changes for review instead of directly into repository. Can see the commit on the review website. Can be built by build server to assure build works. This would replace the procedure of creating bug, attaching patch, reviewing etc. Workflow also manages the IP as well. Checks authorization for committers as well. Interface for review is a collaborative environment, post comments and changes to patch, etc. Interactive. Greg feels this is easier than bugzilla. John&Roland have started using it. Tutorial meeting to cover and discuss would be useful. Optional for now, after training we may make it required. Roland show us workflow and features? Use as a topic for user call?
    • Downloads (see bottom of page)
  • Misc topics:
  • PTP contributions/changes still to consider for the future?
    • GIG (Graphical Inquisitor for GPU Programs) - Utah
    • PerfSuite Feedback - postponed until after Kepler. NCSA/Rui Liu. Integration with Chris N's profile launch?? Should they be packaged together in feature?
      • Rui has to sign contributors' agreement now? Also dual license issue.
  • PTP Build - Greg working on this; Tycho 0.17/18 changes such that you can build a proper Mac application bundle (dirs under .app) presume package builds will eventually do this; could build Sysmon this way and our own PTP package builds. Command line usage: cd and use it.
      • upcoming build changes: signing with crypto key: New tycho feature can sign indiv bundles as they are built. Should speed up the build.
      • Greg working on Junit tests to run automatically as part of build. Will need more tests. Test for remote projects: how to encode passwords.
      • hudson new build jobs: Three pieces per build:
        • ptp-X-photran
        • ptp-X-build - ptp
        • ptp-X-repo aggregation
        • Where X is: nightly: master release: 7.0.1 maint: prev version ( will be 6.0 but now it's 4.2, will change) - only nightly runs automatically on git change. (Beth needs to hook up build page web pages on wiki)
  • Status Reports
    • PTP Core/debug
    • RDT, Synchronized Project, Remote
    • Target System Configuration support
    • Monitoring
    • PLDT
    • ETFw, other tool configurations
    • Docs, Help, N&N
  • Testing plans
  • Tutorials and Outreach
    • SC13 tutorial - not accepted; appealed - no response. Short talks at NCSA booth? XSEDE booth and NCSA booth.
    • XSEDE tutorial July 22 - on Kepler! In progress
    • Next PTP Users Call - July 31 - note this is a week later than normal due to XSEDE - June meeting agenda and recording of Kepler PTP 7.0 features is available at http://wiki.eclipse.org/PTP/PTP_User_Meetings#June_26.2C_2013
  • Next ptp-dev meeting August 13

Parallel Package Downloads

Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.

Release Month Downloads Total Downloads
Indigo SR1 thru Feb 2012  40,298
Indigo SR2 thru June 2012 64,860
Juno (4 days!) June 2012 902 902
Juno July 2012 8169 9071
Juno August 2012 19,112 28,009
Juno September 2012 47,648 76,457
Juno SR1 September 2012 5346 5346
Juno SR1 October 2012 65,353 70,699
Juno SR1 November 2012 58,796 129,495
Juno SR1 December 2012 57,811 187,306
Juno SR1 January 2013 63,350 250,656
Juno SR1 February 2013 39,877 290,533
==Juno SR2== March 2013 41,367 41,367
==Juno SR2== April 2013 36,372 77,739
==Juno SR2== May 2013 28,575 106,316
==Juno SR2== June 2013 22,521 128,853
Kepler R (5 days) June 2013 4003 4003
Kepler R July* 2013 6064 10,230


Interesting platform counts (of the current total 10,230):

  • win64: 4437
  • win32: 4358 - total win 8795
  • linux 64: 657
  • linux 32: 305 - total linux 962
  • mac 64: 300
  • mac 32: 173 - total mac 473


July* downloads as of July 9. Download count query yields 10,230 total, yet downloads page says 8795. Investigating. (Usually these match)

  • N.B. August 13: eclipse webmaster confirms the download page counts were incorrect. 10K is right for this date.

<< Previous month stats | Next month stats >>

Back to the top