Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/July 2012"

< PTP‎ | meetings
(Parallel Package Downloads)
(Parallel Package Downloads)
Line 126: Line 126:
 
|}
 
|}
  
*downloads for July as of ... July 9
+
*downloads for July as of ... July 10
  
 
By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463 <br>By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773  
 
By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463 <br>By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773  

Revision as of 13:45, 10 July 2012

July 2012 Meeting

Date: July 10, 2012 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402


Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
    • Download stats
      • 2617 for Juno Parallel package since Juno release June 27;
      • 64,860 total Indigo SR2 (PTP 5.0.x)
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers / Target System Configurations - legacy and JAXB (configurable)
      • RM-less launch infrastructure
      • Legacy Resource Manager-based launch ?
        • JAXB-based RMs and legacy RMs (some require proxy on target)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations
    • Photran
    • Docs, Help, N&N
    • Other PTP contributions
  3. PTP User call report
    • Previous call was Wed June 27, 2012 (4th Wednesday) See PTP/PTP User Meetings - Jeff Overbey demo'd PTP 6.0 features in Juno release
    • Next meeting? 4th Wed is July 25
  4. Education and Outreach
    • PTP Tutorials scheduled for
      • XSEDE Chicago(July 16, accepted)
      • Juelich Supercomputing Centre [1] (July 5)
      • SC12 Salt Lake City (Nov 18 or 19, proposed);
    • BOFs
      • XSEDE (accepted)
      • SC12 for Wed Nov 21 5:30-7 PM (proposed)
  5. Other Business
  6. Next meeting - Tuesday August 14


Parallel Package Downloads

Download numbers, by month, of 'IDE for Parallel Application Developers' available on http://eclipse.org/downloads. This count is since the release of Eclipse Indigo SR1, on 23 Sept. 2011. SR2 was made available on Feb 24, 2012 and the download numbers were reset to 0 for SR2 counts.

Release Month Downloads Total Downloads
Indigo SR1 Sept 2011 3825 3,825
Indigo SR1 Oct 2011 8630 12,455
Indigo SR1 Nov 2011 8777 21,232
Indigo SR1 Dec 2011 4506 25,738
Indigo SR1 Jan 2012 8179 32,480
Indigo SR1 Feb 2012  6381 40,298
Indigo -SR2 Feb 2012 7329 7,329
Indigo -SR2 Mar 2012 43,849 51,178
Indigo -SR2 Apr 2012 6150 57,328
Indigo -SR2 May 2012 4713 62,041
Indigo -SR2 June 2012 2752 64,860
Juno (4 days!) June 2012 902

902

Juno July 2012 1562 2930
  • downloads for July as of ... July 10

By platform through March for SR1 only: Windows 24,686; Linux 11,632; Mac 4463
By platform through April for SR2 only: Windows 52,510; Linux 3959; Mac 1773
Juno by platform so far: Win32 812; Win64 731; Linux32 287; Linux64 608; Mac32 41; Mac64 139
   Totals Windows 1543; Linux 895; Mac 180


Juno downloads RC1 93; RC2 61; RC3 418; 

Back to the top