Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

PTP/meetings/January 2014

< PTP‎ | meetings
Revision as of 14:13, 14 January 2014 by Beth.tibweb.com (Talk | contribs) (Agenda)

January 2014 Meeting

Date: January 14, 2014 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

UNDER Const redoing lost changes...

  • Overall project, releases, etc.
    • Last release was Kepler-based PTP 7.0.3; any requirements for a 7.0.4?
      • Kepler SR2 RC1+3 is wed jan 22
    • Luna
    • Luna M4 was Dec, parallel package download avail
      • Luna M5+2 is jan 28 tues
      • Luna M build dates.. M6 Mar 11
      • Luna RC dates...
    • Downloads (see bottom of page): over 151K for Kepler-SR1 Parallel package as of today Jan 14
  • Follow-up on last month etc.:
  • SC13 review - Nov 17-22 in Denver
    • PTP BOF Tues Nov 19 - need slides from everyone
    • Jay - status of work with James Howison re: analysis of PTP download information / inclusion in package?
    • Any results of surveys collected at PTP BOF?
    • Hackathon? Date/location? at LSU?
    • Git/Gerrit Status
      • Beth added some info on use of Gerrit for reviewing/submitting a patch from a contributor - at http://wiki.eclipse.org/PTP/Gerrit
      • Need more info on Contributor submitted a patch through Gerrit in the first place
    • EclipseCon is March 17-20, 2014 at San Francisco https://www.eclipsecon.org/na2014/ status on PTP talk acceptances?
  • PTP User meeting last week
  • Status Reports
  • Future planning for 2014 possible PTP tutorials/outreach?
    • XSEDE - July 13-18, 2014, Atlanta (Mar. 15 tutorial proposals due )
    • SC14 - Nov 16-21 2014, New Orleans (March ? - tutorial submissions due)
  • Next Meeting Feb 11

Attendees

Minutes

  • Kepler RC1 is next week; request for a Kepler SR2 release
    • release PTP 7.0.4 to coincide with Kepler
    • any bug fixes should go thru Gerrit - even changes from committers - gives us more experience with using Gerrit too
    • John, Dave has changes - John's are already in. Dave is getting them thru Gerrit
  • Next meeting Feb. 11

Parallel Package Downloads

Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.

Release Month Downloads Total Downloads
Indigo SR1 thru Feb 2012  40,298
Indigo SR2 thru June 2012 64,860
Juno (4 days!) June 2012 902 902
Juno July 2012 8169 9071
Juno August 2012 19,112 28,009
Juno September 2012 47,648 76,457
Juno SR1 September 2012 5346 5346
Juno SR1 October 2012 65,353 70,699
Juno SR1 November 2012 58,796 129,495
Juno SR1 December 2012 57,811 187,306
Juno SR1 January 2013 63,350 250,656
Juno SR1 February 2013 39,877 290,533
Juno SR2 March 2013 41,367 41,367
Juno SR2 April 2013 36,372 77,739
Juno SR2 May 2013 28,575 106,316
Juno SR2 June 2013 22,521 128,853
Kepler R (5 days) June 2013 4003 4003
Kepler R July 2013 26,070 30,073
Kepler R August 2013 26,732 56,805
Kepler R September 2013 28,751 85,556
Kepler SR1 (4 days) Sept 2013 4670 4670
Kepler SR1 October 2013 40,440 45,110
Kepler SR1 November 2013 48,723 93,833
Kepler SR1 December* 2013 110,438


December* downloads as of December 10.

<< Previous month stats | Next month stats >>

Back to the top