Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "PTP/meetings/February 2011"
(→Agenda) |
(→Agenda) |
||
Line 15: | Line 15: | ||
# Status Reports | # Status Reports | ||
#* Next builds, releases | #* Next builds, releases | ||
− | #** 4.0.6 on Helios Service Release 2 | + | #** 4.0.6 on Helios Service Release 2 is Feb. 25. Last build is RC4: RC4+2 (our last chance for contribution) is 2/16 |
− | #*** Repository to test: | + | #*** RC2: Repository to test: http://download.eclipse.org/releases/maintenance/ (will be replaced by RC3 on 2/9) |
− | #** 5.0.0 | + | #*** Next up: RC3+2 is 2/9, so our build from 2/8 (or prior) will probably be used |
− | #*** Repository to test: http://download.eclipse.org/releases/indigo/ | + | #** 5.0.0 on Indigo Simultaneous Release is June 22 |
+ | #*** M5: Repository to test: http://download.eclipse.org/releases/indigo/ | ||
+ | #*** Next up: M6+2 is 3/15 (API Freeze) so our build from 3/14 (or prior) will probably be used | ||
#** Parallel Package of 5.0.0 on Indigo | #** Parallel Package of 5.0.0 on Indigo | ||
#*** M5: http://www.eclipse.org/downloads/packages/release/indigo/m5 - also the development builds tab on the main downloads page points to M5. | #*** M5: http://www.eclipse.org/downloads/packages/release/indigo/m5 - also the development builds tab on the main downloads page points to M5. | ||
Line 28: | Line 30: | ||
#* Photran | #* Photran | ||
#* Other PTP contributions | #* Other PTP contributions | ||
− | # PTP User call report | + | #** Need PTP Logo/icon |
+ | # PTP User call report - next user call is Wed. Feb 23, 2pm ET, 1pm CT | ||
# Other Business | # Other Business | ||
# Next meeting - March 8, 2011 | # Next meeting - March 8, 2011 |
Revision as of 11:53, 7 February 2011
February 2011 Meeting
Date: February 8, 2011 Time: 1:00 PM EST
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0808-234-5071
Passcode: 2221402
Agenda
- Status Reports
- Next builds, releases
- 4.0.6 on Helios Service Release 2 is Feb. 25. Last build is RC4: RC4+2 (our last chance for contribution) is 2/16
- RC2: Repository to test: http://download.eclipse.org/releases/maintenance/ (will be replaced by RC3 on 2/9)
- Next up: RC3+2 is 2/9, so our build from 2/8 (or prior) will probably be used
- 5.0.0 on Indigo Simultaneous Release is June 22
- M5: Repository to test: http://download.eclipse.org/releases/indigo/
- Next up: M6+2 is 3/15 (API Freeze) so our build from 3/14 (or prior) will probably be used
- Parallel Package of 5.0.0 on Indigo
- M5: http://www.eclipse.org/downloads/packages/release/indigo/m5 - also the development builds tab on the main downloads page points to M5.
- 4.0.6 on Helios Service Release 2 is Feb. 25. Last build is RC4: RC4+2 (our last chance for contribution) is 2/16
- Testing plans for coverages of features, platforms
- RDT and remote status
- Resource Managers
- PLDT
- ETFw, other tool integrations (GEM, PPW, etc.)
- Photran
- Other PTP contributions
- Need PTP Logo/icon
- Next builds, releases
- PTP User call report - next user call is Wed. Feb 23, 2pm ET, 1pm CT
- Other Business
- Next meeting - March 8, 2011