Date: December 10, 2013 Time: 1:00 PM EDT
Call in information:
Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402
Agenda
- Overall project, releases, etc.
- Last release was Kepler-based PTP 7.0.3; any requirements for a 7.0.4?
- Luna M3 was Nov 12; Luna M3 Parallel package download from http://eclipse.org/downloads/index-developer.php unfortunately only got 7.0.3 from 9/27/13 build; do an update from http://download.eclipse.org/tools/ptp/builds/luna/nightly/ to get more recent PTP content
- Luna M4+2 is next Tuesday Dec 17
- Any new features that parallel package should be modified to include?
- Downloads (see bottom of page): over 100K for Kepler-SR1 Parallel package
- Follow-up on last month etc.:
- SC13 review - Nov 17-22 in Denver
- PTP BOF Tues Nov 19 - need slides from everyone
- Jay - status of work with James Howison re: analysis of PTP download information / inclusion in package?
- Any results of surveys collected at PTP BOF?
- Hackathon? Date/location? at LSU?
- Git/Gerrit Status
- Beth added some info on use of Gerrit for reviewing/submitting a patch from a contributor - at http://wiki.eclipse.org/PTP/Gerrit
- Need more info on Contributor submitted a patch through Gerrit in the first place
- EclipseCon is March 17-20, 2014 at San Francisco https://www.eclipsecon.org/na2014/ status on PTP talk acceptances?
- PTP User meeting last week
- PTP starter-kit materials: from Dave @ OSU https://osu.box.com/osc-software-engineering
- Syncing and building with multiple remote targets - John Eblen
- Status Reports
- Future planning for 2014 possible PTP tutorials/outreach?
- XSEDE - July 13-18, 2014, Atlanta (Mar. 15 tutorial proposals due )
- SC14 - Nov 16-21 2014, New Orleans (March ? - tutorial submissions due)
Attendees
Minutes
Parallel Package Downloads
Download numbers, by month, of 'Eclipse for Parallel Application Developers' available on http://eclipse.org/downloads. Each release (e.g. R,SR1,SR2) the counts are set to 0 and restarted.
Release | Month | Downloads | Total Downloads |
---|---|---|---|
Indigo SR1 | thru Feb 2012 | 40,298 | |
Indigo SR2 | thru June 2012 | 64,860 | |
Juno | (4 days!) June 2012 | 902 | 902 |
Juno | July 2012 | 8169 | 9071 |
Juno | August 2012 | 19,112 | 28,009 |
Juno | September 2012 | 47,648 | 76,457 |
Juno SR1 | September 2012 | 5346 | 5346 |
Juno SR1 | October 2012 | 65,353 | 70,699 |
Juno SR1 | November 2012 | 58,796 | 129,495 |
Juno SR1 | December 2012 | 57,811 | 187,306 |
Juno SR1 | January 2013 | 63,350 | 250,656 |
Juno SR1 | February 2013 | 39,877 | 290,533 |
==Juno SR2== | March 2013 | 41,367 | 41,367 |
==Juno SR2== | April 2013 | 36,372 | 77,739 |
==Juno SR2== | May 2013 | 28,575 | 106,316 |
==Juno SR2== | June 2013 | 22,521 | 128,853 |
Kepler R | (5 days) June 2013 | 4003 | 4003 |
Kepler R | July 2013 | 26,070 | 30,073 |
Kepler R | August 2013 | 26,732 | 56,805 |
Kepler R | September 2013 | 28,751 | 85,556 |
Kepler SR1 | (4 days) Sept 2013 | 4670 | 4670 |
Kepler SR1 | October 2013 | 40,440 | 45,110 |
Kepler SR1 | November 2013 | 48,723 | 93,833 |
Kepler SR1 | December* 2013 | 110,438 |