Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

PTP/meetings/August 2013

< PTP‎ | meetings
Revision as of 13:11, 13 August 2013 by Beth.tibweb.com (Talk | contribs) (Agenda)

August 2013 Meeting

Date: August 13, 2013 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  • Overall project, releases, etc.
    • 7.0.3 release
    • Luna M1
    • Downloads (see bottom of page)
  • Status Reports
    • PTP Core/debug
    • RDT, Synchronized Project, Remote
    • Target System Configuration support
    • Monitoring
    • PLDT
    • ETFw, other tool configurations
    • Docs, Help, N&N
    • Clients: WinXP/7, Linux, Mac
    • Other tools/contributions
  • Tutorials and Outreach
    • User/Developer meeting
    • SC13 tutorial - not accepted; appealed - no response
    • XSEDE tutorial July 22 - on Kepler! In progress
  • Next ptp-dev meeting Sep 10

Attendees

Greg Watson, Wyatt Spear, Chris Navarro, Jay Alameda, Jeff Overbey, Beth Tibbitts, John Eblen

Minutes

  • 7.0.3 release - planned for Tomorrow (Aug. 14)
    • Testing needed, a few bug fixes have been made. Greg made changes to TSC to add extra arg (bug 411843), some bugs related to saving Env. Mgmt.
  • Luna M1 is next week M1+3 is next Wed. - our luna contribution is ready but disabled because our dependency CDT is disabled.
  • Kepler SR1 RC1 is next week too (also Wed.)
  • Assume our 7.0.3 will be our Kepler SR1 contribution
 RC1  RC2-4 at weekly intervals


Question: downloads for our package?


<< Previous month stats | Next month stats >>

Back to the top