Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/August 2012"

< PTP‎ | meetings
(Minutes)
(Minutes)
Line 49: Line 49:
  
 
== Minutes ==
 
== Minutes ==
 +
 +
* PTP 6.0.2 release - planned for Eclipse Juno SR1 - GA Sept 28
 +
** includes bug fixes to Sync project, resource managers, etc.
 +
** Need people to test!
 +
** RC1 is Aug 21, weekly builds after that
 +
 +
* Kepler M1 is also Aug 21.  We have indicated that PTP will participate in Kepler
 +
** PTP to change from +2 to +3 to give us more time on each build.  Too many changes in CDT etc. didn't give us enough time to react.  No projects depend on PTP that we know of.
 +
 +
* ETFw - Wyatt -- ETFw is moving tabs to see the UI elements for the selected tool only.  Should help usability.
 +
* SI2 progress report is overdue, Wyatt is working on hardware counter and source code highlight features that were promised for SI2 this year.
 +
 +
* Chris N is shifting to another project but is working on replacing ETFw interface to layout with JAXB widgets
 +
 +
* Sync Projects - John E - fixed problems with  importing projects to different workspaces
 +
 +
* Jeff - NCSA position is completing shortly - new job at Auburn in C refactoring.  Assistant Research Professor working with Munwar Hafiz, for NSF accepted grant on C refactoring.
 +
** Is committed to doing SC tutorial as planned; plans to continue as Photran lead through Kepler release.
 +
 +
* Greg wants to improve integration with include files.

Revision as of 10:58, 20 August 2012

August 2012 Meeting

Date: August 14, 2012 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0800-368-0638
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 6.0 Juno - PTP 6.0.0 released June 27; 6.0.1 June 29; 6.0.2 date?
      • Juno SR1 RC1+2 - Aug 21 (Sept 28 GA)
      • Kepler M1+2 - Aug 21
        • Should we change to +3?
    • Download stats
      • 15,261 for Juno Parallel package since Juno release June 27
      • 64,860 total Indigo SR2 (PTP 5.0.x)
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
    • Synchronized Projects
    • Resource Managers / Target System Configurations - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations
    • Photran
    • Docs, Help, N&N
    • Other PTP contributions
  3. Education and Outreach
    • User/Developer Meeting
    • Tutorials
      • SC12 Salt Lake City (Nov 19, accepted);
    • BOFs
      • SC12 for Wed Nov 21 5:30-7 PM (proposed)
  4. Other Business
  5. Next meeting - Tuesday September 11

Attendees

  • Beth Tibbitts, IBM
  • Wyatt Spear, U.Oregon
  • Jeff Overbey, NCSA
  • Chris Navarro, NCSA
  • Greg Watson, IBM
  • John Eblen, ORNL
  • David Alexander TechX

Minutes

  • PTP 6.0.2 release - planned for Eclipse Juno SR1 - GA Sept 28
    • includes bug fixes to Sync project, resource managers, etc.
    • Need people to test!
    • RC1 is Aug 21, weekly builds after that
  • Kepler M1 is also Aug 21. We have indicated that PTP will participate in Kepler
    • PTP to change from +2 to +3 to give us more time on each build. Too many changes in CDT etc. didn't give us enough time to react. No projects depend on PTP that we know of.
  • ETFw - Wyatt -- ETFw is moving tabs to see the UI elements for the selected tool only. Should help usability.
  • SI2 progress report is overdue, Wyatt is working on hardware counter and source code highlight features that were promised for SI2 this year.
  • Chris N is shifting to another project but is working on replacing ETFw interface to layout with JAXB widgets
  • Sync Projects - John E - fixed problems with importing projects to different workspaces
  • Jeff - NCSA position is completing shortly - new job at Auburn in C refactoring. Assistant Research Professor working with Munwar Hafiz, for NSF accepted grant on C refactoring.
    • Is committed to doing SC tutorial as planned; plans to continue as Photran lead through Kepler release.
  • Greg wants to improve integration with include files.

Back to the top