Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "PTP/meetings/August 2011"

< PTP‎ | meetings
(Agenda)
(Minutes)
Line 60: Line 60:
 
# Overall project, releases, etc.
 
# Overall project, releases, etc.
 
#* Next builds, releases
 
#* Next builds, releases
#** 4.0 and 4.1 Branches
+
#** 4.0 and 4.1 Branches - 4.0 work is done; 4.1 branch created for IBM product usage (product based on PTP 4.0 and Eclipse 3.6) but we have no intention of a 4.1 release of PTP
 
#** 5.0 Indigo - official release was June 22; 5.0.1 released July 17
 
#** 5.0 Indigo - official release was June 22; 5.0.1 released July 17
#*** post-mortem: things to note for next year?
+
#*** ptp_5_0 branch: if you commit code changes to the branch, please make a bug and put release and milestone in it so we can track bug fixes for this release better.
#** Parallel Package of 5.0.0 on Indigo
+
#*** 5.0.2 builds started today; next major eclipse release is SR1 in September (GA is Sept 23). Plan to hold 5.0.2 until SR1 unless someone requires a release.
#*** Note first update procedure - See [[PTP/release_notes/5.0#Updating_from_a_previous_release | Updating notes]]
+
#**** RC1 +2 is Wed 8/17 (soon!)
#** Bug status/triage
+
#**** RC2+2 is 8/31
#* Download stats - note here
+
#**** RC3 +2 is 9/7
 +
#**** RC4 +2 is 9/14
 +
#** Parallel Package of 5.0.0 on Indigo - has 3,033 downloads thus far.  Vastly simplifies installation for users.
 +
#*** Note first update procedure - See [[PTP/release_notes/5.0#Updating_from_a_previous_release | Updating notes]] on the PTP wiki.
 
#* Transition to Git
 
#* Transition to Git
 +
#**Postpone until the September timeframe, around SR1.  Major Issue is the changes that will be needed for the build.  CDT build conversion was very time-consuming when they switched to Git.  They also switched the build to Maven.  Vivian Kong would know the details. Roland/John are willing to help but not familiar with build processes.  But they are motivated because they are eager to get the Git repositories working for PTP.
 +
#** Three issues:
 +
#**# Convert repo to Git
 +
#**# Maven for build?
 +
#**# Transition to using Hudson build machine - current builds from cmd line on build.eclipse.org - only a few committers have build authority.
 +
STOPPED HERE, WILL FINISH LATER
 +
 
#* API exporting
 
#* API exporting
 
# Status Reports
 
# Status Reports

Revision as of 16:51, 9 August 2011

August 2011 Meeting

Date: August 9, 2011 Time: 1:00 PM EDT

Call in information:

Toll Free (US): 888-426-6840
Toll Free (Germany): 0800-000-1018
Toll Free (UK): 0808-234-5071
Passcode: 2221402

Agenda

  1. Overall project, releases, etc.
    • Next builds, releases
      • 4.0 and 4.1 Branches
      • 5.0 Indigo - official release was June 22; 5.0.1 released July 17
        • post-mortem: things to note for next year?
      • Parallel Package of 5.0.0 on Indigo
      • Bug status/triage
    • Download stats - note here
    • Transition to Git
    • API exporting
  2. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Docs, Help, Tutorials
      • SC11 tutorial accepted for Sunday Nov 13
    • Other PTP contributions
  3. PTP User call report
  4. Education and Outreach
    • Upcoming workshops/tutorials
    • Status of outreach groups (grants etc.)
  5. Other Business
  6. Next meeting - Sept 13, 2011

Attendees

  • Greg Watson, IBM
  • Beth Tibbitts, IBM
  • Jeff Overbey, UIUC
  • Claudia Knobloch, Juelich
  • Wyatt Spear, U.Oregon
  • Mike Kucera, IBM
  • Dave Wootton, IBM
  • Jay Alameda, NCSA
  • John Eblen, ORNL
  • Roland Schultz, ORNL

Minutes

  1. Overall project, releases, etc.
    • Next builds, releases
      • 4.0 and 4.1 Branches - 4.0 work is done; 4.1 branch created for IBM product usage (product based on PTP 4.0 and Eclipse 3.6) but we have no intention of a 4.1 release of PTP
      • 5.0 Indigo - official release was June 22; 5.0.1 released July 17
        • ptp_5_0 branch: if you commit code changes to the branch, please make a bug and put release and milestone in it so we can track bug fixes for this release better.
        • 5.0.2 builds started today; next major eclipse release is SR1 in September (GA is Sept 23). Plan to hold 5.0.2 until SR1 unless someone requires a release.
          • RC1 +2 is Wed 8/17 (soon!)
          • RC2+2 is 8/31
          • RC3 +2 is 9/7
          • RC4 +2 is 9/14
      • Parallel Package of 5.0.0 on Indigo - has 3,033 downloads thus far. Vastly simplifies installation for users.
    • Transition to Git
      • Postpone until the September timeframe, around SR1. Major Issue is the changes that will be needed for the build. CDT build conversion was very time-consuming when they switched to Git. They also switched the build to Maven. Vivian Kong would know the details. Roland/John are willing to help but not familiar with build processes. But they are motivated because they are eager to get the Git repositories working for PTP.
      • Three issues:
        1. Convert repo to Git
        2. Maven for build?
        3. Transition to using Hudson build machine - current builds from cmd line on build.eclipse.org - only a few committers have build authority.

STOPPED HERE, WILL FINISH LATER

    • API exporting
  1. Status Reports
    • PTP Core/debug
    • RDT and remote status
      • Synchronized Projects
    • Resource Managers - legacy and JAXB (configurable)
    • Monitoring - incl. new System Monitoring Perspective
    • PLDT
    • ETFw, other tool integrations (GEM, PPW, etc.)
    • Photran
    • Docs, Help, Tutorials
      • SC11 tutorial accepted for Sunday Nov 13
    • Other PTP contributions
  2. PTP User call report
  3. Education and Outreach
    • Upcoming workshops/tutorials
    • Status of outreach groups (grants etc.)
  4. Other Business
  5. Next meeting - Sept 13, 2011

Back to the top