Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Open-Measured-Data-Management-WG/UserAuthenticationAndRights"

Line 30: Line 30:
 
== Minutes ==
 
== Minutes ==
  
* [#Open-Measured-Data-Management-WG/UserAuthenticationAndRights/Minutes_Kickoff_Meeting]
+
* [#Open-Measured-Data-Management-WG/UserAuthenticationAndRights/Minutes_Kickoff_Meeting Kickoff Meeting]

Revision as of 07:15, 11 January 2017

Goal

The openMDM Eclipse Working Group recognizes the need to provide user authentication and user authorization as part of the openMDM 5 framework and solicits proposals for the design and implementation of suitable mechanisms to perform these functions. Specifically, the following questions are to be addressed:

  • Which notion of user identity is used by openMDM?
  • How is the identity of a user authenticated during login?
  • How is the identity of the current user passed between different openMDM components and between openMDM components and underlying data sources (e.g., ODS servers)?
  • How are roles and user-role assignments managed?
  • How are access rights defined and managed?
  • Which component(s) are responsible for enforcing access control and which mechanisms are used for the enforcement?
  • How should openMDM components and applications react to authorization failures?

An initial workshop on user authentication and authorization in openMDM was held in April 2016 and resulted in a set of observations, requirements and suggestions documented under ORGA-98 and Orga-158. Based on the results of this workshop, the openMDM Eclipse Working Group now looks for a specific design and (after acceptance of the design by the Working Group) an implementation of user authentication and authorization within the openMDM framework.

Responsible Driver Members

  • Müller BBM (Stefan Wartini)
  • Siemens (Gert Sablon)

Project Steps

  • DONE: Kick-off meeting held (2.11.2016) see Minutes:
  • IN PROGRESS: Interviews planned with OEMS
    • Interview partners defined: BMW (Michael Schwarzbach), Audi (Franz Wöhrl/Sven Wittig), Daimler (??)
    • Consolidated interview result:
  • TODO: 1. Delivery: Concept
  • TODO: 2. Delivery: Example Implementation



Minutes

  • [#Open-Measured-Data-Management-WG/UserAuthenticationAndRights/Minutes_Kickoff_Meeting Kickoff Meeting]

Back to the top