Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Mylyn/Restructuring/2015

This page described the process of simplifying the Mylyn project structure. Basically, all projects will be grouped below the Mylyn top-level project. The new structure becomes flat. Projects with overlapping committers should be merged into one (where possible).

Proposed Structure

  • Task Focused Interface (unifies Builds, Commons, Context, Reviews, Tasks, and Versions)
  • Wikitext (extracted from Docs)
  • Intent (move out of docs)
  • VEX (move out of docs)
  • Incubator (as it is today)
  • Model Focusing Tools (move out of sub-structure)

Candidates for archival (discuss with committers):

  • R4E
  • ePub (from Docs)
  • HTMLText (from Docs)

The most significant simplification is the merge of a lot projects into TFI. This should greatly reduce the release overhead. They are all developed and released together today anyway. However, separate documentation must be prepared given the old structure.

Back to the top