Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Restructuring/2015"

m (Proposed Structure)
(Proposed Structure)
Line 9: Line 9:
 
* Model Focusing Tools (move out of sub-structure)
 
* Model Focusing Tools (move out of sub-structure)
  
'''Candidates for archival (discuss with committers):'''
+
==== Candidates for archival ====
 
* R4E
 
* R4E
 
* ePub (from Docs)
 
* ePub (from Docs)
 
* HTMLText (from Docs)
 
* HTMLText (from Docs)
  
The most significant simplification is the merge of a lot projects into TFI. This should greatly reduce the release overhead. They are all developed and released together today anyway. However, separate documentation must be prepared given the old structure.
+
 
 +
== Discussion ==
 +
'''Task Focused Interface'''<br>
 +
The most significant simplification is the merge of a lot projects into TFI. This should greatly reduce the release overhead. They are all developed and released together today anyway. There is a significant However, separate documentation must be prepared given the old structure.

Revision as of 06:48, 10 December 2013

This page described the process of simplifying the Mylyn project structure. Basically, all projects will be grouped below the Mylyn top-level project. The new structure becomes flat. Projects with overlapping committers should be merged into one (where possible).

Proposed Structure

  • Task Focused Interface (unifies Builds, Commons, Context, Reviews, Tasks, and Versions)
  • Wikitext (extracted from Docs)
  • Intent (move out of docs)
  • VEX (move out of docs)
  • Incubator (as it is today)
  • Model Focusing Tools (move out of sub-structure)

Candidates for archival

  • R4E
  • ePub (from Docs)
  • HTMLText (from Docs)


Discussion

Task Focused Interface
The most significant simplification is the merge of a lot projects into TFI. This should greatly reduce the release overhead. They are all developed and released together today anyway. There is a significant However, separate documentation must be prepared given the old structure.

Copyright © Eclipse Foundation, Inc. All Rights Reserved.