Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Meetings/2006"

 
Line 1: Line 1:
Archive of [[Mylyn Meetings]]
 
 
==== Tuesday, August 28, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code wrap-up (Jevgeni, Xiaoyang, Balazs(done) )
 
* Merging TaskData and AbstractTask (Eugene)
 
* Visualization of entries that don't match queries {{bug|201157}}
 
* Policy: resolving bug reports (Rob)
 
* 2.1 and 3.0 Planning (Mik)
 
* Arbitrary attributes discussion {{bug|199818}}
 
 
Minutes:
 
* Mik: add starting points for writing unit tests to cover UI
 
 
 
==== Tuesday, August 21, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports and wrap-up (Balazs, Jevgeni, Xiaoyang)
 
** Figure out how to distribute Trac wiki editor {{bug|200114}} (Steffen)
 
* Timezone datestamp issue {{bug|198714}} (Rob)
 
* API to store arbitrary attributes in the AbstractTask: patch on bug {{bug|199818}}, {{bug|199817}} (Eugene)
 
* Grouping of query elements, 2nd patch on {{bug|175318}} (Eugene)
 
* Policy: resoving bug reports (Rob)
 
* 2.1M1 release planning (Mik)
 
* 2.1 and 3.0 Planning (Mik)
 
 
==== Tuesday, August 14, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* API to store arbitrary attributes in the AbstractTask: {{bug|199818}}, {{bug|199817}} (Eugene)
 
* Vacation catchup (Mik & Rob)
 
* 2.1M1 release planning (Mik)
 
 
Minutes:
 
...
 
 
==== Tuesday, July 31, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* August 7 meeting CANCELLED (most committers offline)
 
 
==== Tuesday, July 24, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* 3.0 planning (Mik)
 
 
Minutes:
 
* Explore participation in Eclips.org Bug Day
 
* Add 'helpwanted' query to community page
 
* Mik offline: July 30 - August 10
 
* Rob offline: August 3 - 8
 
* Steffen offline: August 7 - 14
 
----
 
 
==== Tuesday, July 17, 10-11am PT ====
 
 
Agenda:
 
* Summer of Code student status reports (Balazs, Jevgeni, Xiaoyang)
 
* XPlanner status (Helen)
 
* vserver admin status report (Rob)
 
* dev builds are behind bug reports (Eugene)
 
* grouping in the task list [https://bugs.eclipse.org/bugs/show_bug.cgi?id=175318 bug 175318] (Eugene)
 
* refactor abstract task editor to not use ScrolledForm [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195326 bug 195326] (Eugene)
 
* <s>Duplicate detector for jira [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195079 bug 195079]</s>(Rob)
 
* Bug triage and clean-up (Mik)
 
* 3.0 planning (Mik)
 
 
Minutes:
 
* ...
 
 
 
==== Tuesday, July 10, 10-11am PT ====
 
 
Agenda:
 
* 3.0 Objectives (Mik)
 
* <s>"Additional Settings" section in Repository settings [https://bugs.eclipse.org/bugs/show_bug.cgi?id=195058 195058] (Eugene)</s>
 
* Pending Patches (Steffen)
 
 
Minutes:
 
* Steffen to create new bug to address revealing bugs with pending patches in the Task List UI
 
 
==== Tuesday, July 4, 10-11am PT ====
 
 
Agenda:
 
* Summer of code update (students)
 
* 2.0 decompression (Mik)
 
* Update site split (Mik)
 
 
Minutes:
 
* Tools for checking for binary and source compatibility with older releases: [http://clirr.sourceforge.net/ Clirr], [http://javadiff.sourceforge.net/ JDiff]
 
* Automatic adding "extras" update site entry and follow up on "sites to visit" bug in PDE
 
 
==== Tuesday, June 26, 10-11am PT ====
 
 
* Summer of code update (students)
 
* 2.0 endgame (Mik)
 
* Feature and update site changes, EPP packaging (Mik)
 
* Continuous build (Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=194258 194258]  [api] Stream multi task data retrieval straight to storage bypassing in memory cache (Eugene)
 
* Contribution for committers (Eugene)
 
 
Minutes:
 
 
==== Tuesday, June 19, 10-11am PT ====
 
 
* Summer of code update (students)
 
* Continuous build (Steffen)
 
 
Future:
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* vserver admin status report
 
----
 
 
==== Tuesday, June 12, 10-11am PT ====
 
 
* Project Rename Status (Mik)
 
* Summer of code update (students)
 
* 2.0 RC1 release status (Mik)
 
** Release of JIRA connector?
 
* Error handling design (Mik, Rob, Steffen)
 
* Fixes for the synchronization API ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 #191575])
 
* Notification of API changes (Steffen)
 
 
Actions:
 
* Mik to investigate options for disabling old mylar plugins (required for tonight's dev build)
 
* Eugene to take quick pass at synchronization api changes tonight [[https://bugs.eclipse.org/bugs/show_bug.cgi?id=191575 bug#191575]]
 
----
 
 
 
 
==== Tuesday, June 5, 10-11am PT ====
 
 
* Google Summer of Code kick-off (Balazs, Jevgeni, Xiaoyang)
 
* vserver admin practices (Rob, Steffen)
 
* 2.0 end game planning
 
** Committers 2.0 plan update
 
* Task Repository in offline mode (Mik)
 
* New Task List layout (Mik)
 
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
<i>Stale items</i>
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Actions:
 
* Rob to administer vserver (corrdinate with Steffen)
 
** Contact Denis regarding updates
 
** Investigate backup options
 
 
==== Tuesday, May 29, 10-11am PT ====
 
 
* 2.0 end game planning
 
* Task Repository in offline mode (Mik)
 
* New Task List layout (Mik)
 
* Offline storage refactoring status update (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Task vs. TaskData; properties vs. class hierarchy (Eugene)
 
** Full vs. light synchronization (Eugene)
 
<i>Stale items</i>
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Minutes:
 
* (Eugene) Proposed eliminating Task hierarchy and replace with property based access
 
** Suggests merging Task and AbstractRepositoryTask
 
** Willing to add property support to ITask for 2.1 if requested by integrators.
 
* (Steffen) The property-based vs. sub-classing discussing is important and we need to consider this for 3.0 again.
 
* (Rob) raised TaskData migration and committers agree that migraion of existing offline data not practical
 
 
Actions:
 
* (Mik) introduce class factories and remove custom task externalizers
 
* replace AbstractQueryHit by Tasks
 
* allow connectors to submit Task or TaskData objects as hits
 
* convert offline storage from Java Serialization to XML
 
* construct attribute editors through factory, do not store repository configuration in offline storage
 
* apply pending rename changes from porting guide
 
* refactor attachment API
 
 
 
 
==== Tuesday, May 22, 10-11am PT ====
 
 
* 2.0 end game planning
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
* Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Do we really need two separate APIs for task list and offline storage?
 
** Class hierarchy vs. property-based API
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* Top voted bug: [https://bugs.eclipse.org/bugs/show_bug.cgi?id=169123 169123]: Updated bug does not preserve values of custom fields in Jira (Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Minutes:
 
* Task workflow and special query support likely getting bumped
 
* Rob: related bug#185805 (timestamp bug) and bug#186939 (blocked jobs)
 
* Steffen: httpclient message.shutdown() can be used to force shutdown of network IO
 
 
Actions:
 
* Rob and Steffen:
 
**to start offline refactoring.
 
**included refactoring of local tasks to AbstractRepositoryTask (P1)
 
**For RC0, add progress monitor to all api methods that involve IO to easy future implementation.
 
* Steffen to open new bug for alternate containment representations (outline, task editor can be used to reveal)  duplicates for bugzilla could use this
 
* Mik to make new bug for Open Resource bug related to Task Working sets  (defer Eugen's multiple tasklist views patch since will require additional view memento facility?)
 
* Rob: Will investigate breaking out past activity from scheduled mode (after higher priority api changes).
 
* For next call: Committers should review their P1 and P2 tasks and form a realistic list for 2.0
 
 
==== Tuesday, May 15, 10-11am PT ====
 
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
* Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen) ([[Mylar Offline Refactoring]])
 
** Do we really need two separate APIs for task list and offline storage?
 
** Class hierarchy vs. property-based API
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Actions:
 
* Decisions made regarding offline TaskData handling and presentation merged with wiki ([[Mylar Offline Refactoring]]).
 
 
==== Tuesday, May 8, 10-11am PT ====
 
 
* New Task List layout (Mik)
 
* Monitor update (Meghan)
 
** Server memory troubles (Steffen)
 
* MylarStatus API and HTML errors [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170536 170536] (Steffen)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
 
Actions:
 
* Additive improvements deferred in favor of API changes.
 
Main API changes (P2):
 
* Local task become repository tasks
 
* Hits become Tasks (but retain UI representation)
 
* Offline storage improvements  ([[Mylar Offline Refactoring]])
 
* Tasklist externalization
 
* AbstractRepositoryTaskEditor (make protected methods private)
 
* Multiple Task Downloads (synch api changes)
 
* Context listeners api (Mik)
 
* Extract repository configuration
 
 
 
==== Tuesday, May 1, 10-11am PT ====
 
 
* Eclipse Forum Europe report (Mik)
 
* New Task List layout (Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* Monitor update (Meghan)
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Mylar demo at JavaOne (Eugene, Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=153573 153573] add support for nesting top level task list elements, e.g. via incorporating working sets (Eugene)
 
* Post action items/summary/minutes after each meeting (Mik?)
 
 
Actions:
 
* Eugene
 
** send screenshot example of strikethrough looking like row lines
 
* Mik
 
** consider moving activation to task icon
 
** working sets in tasklist needs priority since we need to put miles on it before release
 
* Rob
 
** persistence api should be finalized so that we can drop in alternate back ends
 
 
==== Tuesday, April 24, 10-11am PT ====
 
 
* Post action items/summary/minutes after each meeting
 
* Streamline UI for basic RSS support (Eugene, Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
Minutes:
 
* Greg Wilson gave brief overview of planned work for SoC project
 
* Discussed options for implementing offline storage for task data
 
* Discussed use cases for RSS support in the Task List
 
* Discussed tagging and working sets support in the Task List
 
 
Actions:
 
 
* Does it make sense to keep task data separate from the task list?
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165880 165880: Listeners API should allow to pass multiple events in one call] Potential source of refresh issues (Eugene)
 
 
==== Tuesday, April 17, 10-11am PT ====
 
 
* Google Summer of Code planning (Mik)
 
* ROME depency accepted (Eugene, Mik)
 
* Usage monitor status (Meghan)
 
* Tagging and nesting task list elements UI discussion (Mik)
 
** Contributing custom models to task list and task repositories views. per-milestone/version grouping, or grouping query results by certain attributes (Eugene)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* 2.0M3 API updates (Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
* Post action items/summary after each meeting
 
 
==== Tuesday, April 10, 10-11am PT ====
 
 
* Usage monitor status (Meghan)
 
* Tagging and nesting task list elements UI discussion (Mik)
 
* Offline storage strategy design discussion (Rob, Steffen)
 
* 2.0M3 API changes (Mik)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=179873 179873: Completed status not correct for JIRA tasks]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View (Eugene)
 
 
==== Tuesday, April 3, 10-11am PT ====
 
 
* Mylar 2.0M2 release wrap-up, 2.0M3 planning (Mik)
 
* Offline storage strategy design discussion(Rob, Steffen)
 
 
==== Tuesday, March 27, 10-11am PT ====
 
 
Planning meetings are open to all interested.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
 
* Mylar 2.0M2 status
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=178933 178933] Show last recently used views in the Quick Context View
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=176513 176513] [api] Multiple task data request (Rob)
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=160389 160389] [api] Serialization / loss of data etc (Rob)
 
* JIRA statuses: resolved vs. closed
 
 
==== Tuesday, March 20, 10-11am PT ====
 
 
* [http://wiki.eclipse.org/index.php/Mylar_GSoC_2007 Goolge Summer of Code ideas] (Mik)
 
* Eclipse 3.3M6 status (Mik)
 
* JIRA network utilization ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=175407 175407])
 
* JIRA test server
 
* usage reporting (Meghan)
 
 
==== Tuesday, March 13, 10-11am PT ====
 
 
Agenda:
 
* EclipseCon decompression (Mik)
 
* JIRA test server (Steffen)
 
* 2.0M2 planning
 
* AttributeFactoryUI/RepositoryConfiguration (Rob, Steffen)
 
 
==== Tuesday, February 27, 10-11am PT ====
 
 
Agenda:
 
* '-' issue - [https://bugs.eclipse.org/bugs/show_bug.cgi?id=166174 bug 166174]
 
* EclipseCon planning (Mik)
 
** 3.2 dev build
 
** Stickers/Buttons/T-shirts
 
** Poster
 
* In-place context view (Mik, Eugene)
 
* GSoC 2007 project (Steffen)
 
 
Actions:
 
* Find Mylar film glasses (Steffen)
 
* Find out if there is any space left for poster presentations (Rob)
 
* At EclipseCon ask EMF folks about using EMF for repository mappings (Mik & Rob)
 
 
==== Tuesday, February 20, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
* 2.0M1 release review (Mik)
 
* Id vs handle vs key (Mik)
 
* How to make Query creation more obvious for new users (Eugene)
 
* Showing Task ID/Keys in UI (task list and task dialogs, editor tabs and headers, task history dropdown, change sets) (Eugene)
 
* JIRA issues (Eugene, Steffen)
 
 
Actions:
 
* File form header bug
 
* Create method: TaskList.getTask(String connectorKind, String taskUrl)
 
* Create AbstractRepositoryTask.getKey()
 
 
==== Tuesday, February 13, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
 
Agenda:
 
* IP submission follow-ups for Lucene 2.0, Axis2 (Mik)
 
* Major connector externalizer and task handle usage refactoring (Mik)
 
* JIRA issues
 
* Make Steffen JIRA committer
 
* Discuss refactoring of RepositoryTaskAttributes (bug 150680?) (Steffen)
 
** Separate UI representation from attribute?
 
** How to link attributes to repository configuration?
 
 
==== Tuesday, February 6, 10-11am PT ====
 
 
Agenda
 
* Finalizing of Mylar 2.0 plan (Mik)
 
* Status of IP submissions (Mik)
 
* Orbit dependencies
 
* Status of JIRA
 
* Issues with handles (Eugene)
 
* Issues with event notification api (Rob)
 
 
==== Tuesday, January 30, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning (Mik)
 
* Moving to Eclipse 3.3M5 builds (Mik)
 
* Final IP and contribution submissions for Europa (Mik)
 
* Status Jira Core Services and library dependencies (Steffen)
 
 
==== Tuesday, January 23, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning (Mik)
 
* Implementation strategy for
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=171081 171081]: Autodetect JIRA repository for Open Corresponding Task (Eugene)
 
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=159135 159135]: Automatic resolution of links between projects and issue repositories (Eugene)
 
* Additional contributions to be made by the Jan. 31st Europa cutoff (Mik)
 
Actions
 
* Consider Lucene 2.0 IPZilla submission (Mik)
 
 
==== Tuesday, January 16, 10-11am PT ====
 
 
Planning meetings are open to all.  When adding an item to the agenda please include your name.
 
* Mylar 2.0 planning
 
* Tomcat and server setup for mylar.eclipse.org
 
* TaskId vs TaskHandle (numerous issues with JIRA connector) [https://bugs.eclipse.org/bugs/show_bug.cgi?id=170587 bug 170587]
 
* Models and their application to the tasklist (Rob, Eugene) ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147084 147084: merge Task List and Task Activity views])
 
** "[use] models and provide model that would show unread/changed/conflicting tasks" ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=170606 170606: Add action to Task List to filter out read requests])
 
** 153573: add support for nesting top level task list elements, e.g. via incorporating working sets
 
* Task web browser
 
Actions:
 
* Add milestone buckets 2.0M1 through M3 (Mik)
 
* Gets JIRA enterprise license key for test server (Mik)
 
* Ask about server backup policy (2.6 Gigs used), disk space for usage data (Mik)
 
* Consider downgrading Tomcat to 5.5 (Meghan)
 
* Write up Mylar monitor data collection project (Meghan)
 
* Plans hyperlink detection improvements and bugs (Rob)
 
**170679: [api] improve hyperlink detection api
 
**170681: [api] allow connectors to contribute alternate content providers (models) to tasklist
 
**170685: [api] allow connectors to contribute filters to tasklist
 
 
==== Tuesday, Januray 9, 10-11am PT ====
 
 
Agenda:
 
* Mylar 2.0 milestone and Europa planning.
 
* Synchronization, progress indication, and cancellation of repository task operations ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168257 168257], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=150682 150682], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=154258 154258], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=143011 143011])
 
* Mylar error handling ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=168049 168049], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165498 165498], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=168672 168672], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=165383 165383])
 
* Task activity timing improvement ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=147537 147537])
 
* JIRA issues (auth problem and integrating JIRA client)
 
Actions:
 
* Write up error policy (Steffen)
 
* Plan synchronization related bugs (Rob)
 
* Find platform release dates (Mik)
 
* Define scope of project on planning page (Mik)
 
* Add dummy query on codehouse project (Mik)
 
 
 
==== Tuesday, December 19, 10-11am PT ====
 
==== Tuesday, December 19, 10-11am PT ====
  

Latest revision as of 12:13, 17 June 2008

Tuesday, December 19, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • 1.0.1 priorities (Mik)
  • Slap Eugene for discrediting Mylar in blogs and Mik for not blogging
  • Layout of search/query page

Tuesday, December 12, 10-10:30am PT

  • Mylar 1.0 celebration and retrospective.
  • Brock Janiczak's JIRA core services contribution (Eugene, Mik?).
  • Discovery update sites (Eugene, Mik).
  • Version numbers (Mik).

Tuesday, December 5, 10-10:30am PT

  • Remaining priorities for 1.0 (Mik)
  • API status (Mik)
    • Externalizers ITaskListExternalize
    • Listeners API, primarily ITaskListChangeListener
    • Adapting to ITask and broken selection of the task respositories
  • Proxy settings status (Rob)
  • Subclipse integration and Team API (Eugene)


Tuesday, November 21, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • Remaining 1.0RC1 items (Mik)
    • Issues with tack context (multiple folders, unfiltering issues, etc)
    • Issues with new local task UI (focus, inline vs. editor)
    • Moving task drop down and pause button out of Task List UI?
  • Bugzilla and repository infrastructure status (Rob)
  • Trac status (Steffen)
  • Web connector status (Mik)
  • JIRA connnector status (Mik & Eugene)

Actions

  • Mik emails newsgroup/mylar-dev about task list toolbar changes
  • Mik fixes classpath of context.core xmlrpc-use
  • Visible editor always unfiltered
  • Eugene files bug on editor color problem
  • Steffen files bug People section with JIRA

Tuesday, November 14, 10-11am PT

Agenda

  • Mylar 1.0 priorities.
  • Pause button UI (Mik?)

Actions

  • Need people section for Trac
  • Discuss removing commit context button on newsgroup
  • Allow proxy settings to be specified per-repository

Tuesday, October 31, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

  • Web repository connector UI , bug 158069 (Eugene)
  • Authentication infrastructure and connectors (Rob)
  • Offline support for JIRA (Mik)
  • Pause button UI (Mik)


Tuesday, October 24, 10-11am PT

Planning meetings are open to all. When adding an item to the agenda please include your name.

Agenda

Actions

  • Investigate Lucene as store for offline task data (Rob)
  • Investigate showing working sets as top-level nodes in Task List (Mik)

Tuesday, October 17, 10-11am PT

Agenda

  • 0.8 release planning
  • Web repository connector UI , bug 158069 (Eugene)
  • Rich editor for Trac (Steffen?)
  • Repository task data (Rob)
    • Offline persistence: object serialization (current), xml, database bug 160389
    • Lazy loading bug 157257
  • Issues with Task monitoring and filtering for projects with more then one source folder
  • Jira integration planning
  • User guide and improving the docs

Actions

  • Need "Add to Task List" action on query hits
  • Consider merging the above action with dialog for "Add Existing Task..."
  • Need to consider pre-fetching task data for query hits

Tuesday, September 26 2006, 10-11am PT

  • 0.7 release planning
  • Project and repository association (Rob)
  • 1.0 planning (Mik)

Wednesday, August 23 2006, 10-11am PT

  • Planning for 0.6.2
  • Generic web Repository Connector integration (Eugene)
  • Trac Connector rich editor (Steffen)
  • AbstractRepositoryConnector split into core and UI
  • Planning for 0.7 and 1.0
  • Zest website integration and release cycles

Wednesday, August 2 2006, 10-11am PT

Agenda

  • 0.6.1 post-mortem
  • 0.6.2 and 1.0 planning
  • Summer of Code status
    • Trac Connector (Steffen)
    • Bugzilla enhancements (Jeff)
    • JIRA
  • Design discussion on splitting AbstractRepositoryConnector into core/ui
  • Sandbox release for web connector (Eugene)

Vacations

  • Rob: 3rd - 8th
  • Mik: 8th - 17th

Actions

  • Consumers of APIs update Javadocs as they use them, a la wiki
  • Decide on conference call time and interval next meeting
  • Investigate Rome dependency for Sandbox (Mik)

Thursday, July 6 2006, 10am PT

  • wrap up discussion of 0.6 release
  • Trac integration status (Steffen)
  • enhancing Bugzilla connector status (Jeff)
  • Connector naming conventions
  • tasks API discussion. String-based task id, separate task id, url and repository url, (issues 146396, 149624, 149509), other refactoring of tasks, hits, query and repository classes
  • UI for repository settings
  • prioritizing for 0.7 and beyond
  • planning and use of Bugzilla priorities

Tuesday, June 13 2006, 10am PT

  • Schedule a regular meeting time and interval
  • Google SoC: Trac integration (Steffen)
  • Google Soc: enhancing Bugzilla connector (Jeff)
  • Repository connector API discussion (Mik)
  • Prioritize tasks for 0.6 (Mik)

Copyright © Eclipse Foundation, Inc. All Rights Reserved.